An effective two phase heuristic for synchronized seru production scheduling and 3PL transportation problems
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ijpe.2023.109126
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Zhang, Zhe & Gong, Xue & Song, Xiaoling & Yin, Yong & Lev, Benjamin & Chen, Jie, 2022. "A column generation-based exact solution method for seru scheduling problems," Omega, Elsevier, vol. 108(C).
- Zhi-Long Chen & George L. Vairaktarakis, 2005. "Integrated Scheduling of Production and Distribution Operations," Management Science, INFORMS, vol. 51(4), pages 614-628, April.
- Bilge Bilgen & Yelda Çelebi, 2013. "Integrated production scheduling and distribution planning in dairy supply chain by hybrid modelling," Annals of Operations Research, Springer, vol. 211(1), pages 55-82, December.
- Aleda Roth & Jaya Singhal & Kalyan Singhal & Christopher S. Tang, 2016. "Knowledge Creation and Dissemination in Operations and Supply Chain Management," Production and Operations Management, Production and Operations Management Society, vol. 25(9), pages 1473-1488, September.
- Taccari, Leonardo, 2016. "Integer programming formulations for the elementary shortest path problem," European Journal of Operational Research, Elsevier, vol. 252(1), pages 122-130.
- Jacques Renaud & Fayez F. Boctor & Gilbert Laporte, 1996. "A Fast Composite Heuristic for the Symmetric Traveling Salesman Problem," INFORMS Journal on Computing, INFORMS, vol. 8(2), pages 134-143, May.
- Li, Mingxing & Huang, George Q., 2021. "Production-intralogistics synchronization of industry 4.0 flexible assembly lines under graduation intelligent manufacturing system," International Journal of Production Economics, Elsevier, vol. 241(C).
- Gabriel R. Bitran & Horacio H. Yanasse, 1982. "Computational Complexity of the Capacitated Lot Size Problem," Management Science, INFORMS, vol. 28(10), pages 1174-1186, October.
- Sun, X.T. & Chung, S.H. & Chan, Felix T.S., 2015. "Integrated scheduling of a multi-product multi-factory manufacturing system with maritime transport limits," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 79(C), pages 110-127.
- Pablo Moscato & Michael G. Norman, 1998. "On the Performance of Heuristics on Finite and Infinite Fractal Instances of the Euclidean Traveling Salesman Problem," INFORMS Journal on Computing, INFORMS, vol. 10(2), pages 121-132, May.
- Rego, César & Gamboa, Dorabela & Glover, Fred & Osterman, Colin, 2011. "Traveling salesman problem heuristics: Leading methods, implementations and latest advances," European Journal of Operational Research, Elsevier, vol. 211(3), pages 427-441, June.
- Wang, Haibo & Alidaee, Bahram, 2019. "The multi-floor cross-dock door assignment problem: Rising challenges for the new trend in logistics industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 132(C), pages 30-47.
- Peiyang He & Kunpeng Li & P. N. Ram Kumar, 2022. "An enhanced branch-and-price algorithm for the integrated production and transportation scheduling problem," International Journal of Production Research, Taylor & Francis Journals, vol. 60(6), pages 1874-1889, March.
- Li, Dongni & Jiang, Yuzhou & Zhang, Jinhui & Cui, Zihua & Yin, Yong, 2023. "An on-line seru scheduling algorithm with proactive waiting considering resource conflicts," European Journal of Operational Research, Elsevier, vol. 309(2), pages 506-515.
- Xuxia Zou & Ling Liu & Kunpeng Li & Wenli Li, 2018. "A coordinated algorithm for integrated production scheduling and vehicle routing problem," International Journal of Production Research, Taylor & Francis Journals, vol. 56(15), pages 5005-5024, August.
- Zhou, Yizi & Mandania, Rupal & Liu, Jiyin, 2022. "Green vehicle routing and dynamic pricing for scheduling on-site services," International Journal of Production Economics, Elsevier, vol. 254(C).
- Godinho Filho, Moacir & Marchesini, Antonio Gilberto & Riezebos, Jan & Vandaele, Nico & Ganga, Gilberto Miller Devós, 2017. "The application of Quick Response Manufacturing practices in Brazil, Europe, and the USA: An exploratory study," International Journal of Production Economics, Elsevier, vol. 193(C), pages 437-448.
- Kathryn E. Stecke & Xuying Zhao, 2007. "Production and Transportation Integration for a Make-to-Order Manufacturing Company with a Commit-to-Delivery Business Mode," Manufacturing & Service Operations Management, INFORMS, vol. 9(2), pages 206-224, September.
- Laguir, Issam & Stekelorum, Rébecca & El Baz, Jamal, 2021. "Proactive environmental strategy and performances of third party logistics providers (TPLs): Investigating the role of eco-control systems," International Journal of Production Economics, Elsevier, vol. 240(C).
- Jing-Sheng Song & Geert-Jan van Houtum & Jan A. Van Mieghem, 2020. "Capacity and Inventory Management: Review, Trends, and Projections," Manufacturing & Service Operations Management, INFORMS, vol. 22(1), pages 36-46, January.
- Lennart Baardman & Maxime C. Cohen & Kiran Panchamgam & Georgia Perakis & Danny Segev, 2019. "Scheduling Promotion Vehicles to Boost Profits," Management Science, INFORMS, vol. 65(1), pages 50-70, January.
- Giusti, Riccardo & Manerba, Daniele & Bruno, Giorgio & Tadei, Roberto, 2019. "Synchromodal logistics: An overview of critical success factors, enabling technologies, and open research issues," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 129(C), pages 92-110.
- Edward He & Natashia Boland & George Nemhauser & Martin Savelsbergh, 2021. "Time-Dependent Shortest Path Problems with Penalties and Limits on Waiting," INFORMS Journal on Computing, INFORMS, vol. 33(3), pages 997-1014, July.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Zhang, Zhe & Song, Xiaoling & Gong, Xue & Yin, Yong & Lev, Benjamin & Zhou, Xiaoyang, 2024. "Coordinated seru scheduling and distribution operation problems with DeJong’s learning effects," European Journal of Operational Research, Elsevier, vol. 313(2), pages 452-464.
- Lili Wang & Min Li & Guanbin Kong & Haiwen Xu, 2024. "Joint decision-making for divisional seru scheduling and worker assignment considering process sequence constraints," Annals of Operations Research, Springer, vol. 338(2), pages 1157-1185, July.
- Sun, X.T. & Chung, S.H. & Chan, Felix T.S., 2015. "Integrated scheduling of a multi-product multi-factory manufacturing system with maritime transport limits," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 79(C), pages 110-127.
- Ullrich, Christian A., 2013. "Integrated machine scheduling and vehicle routing with time windows," European Journal of Operational Research, Elsevier, vol. 227(1), pages 152-165.
- Azeddine Cheref & Alessandro Agnetis & Christian Artigues & Jean-Charles Billaut, 2017. "Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence," Journal of Scheduling, Springer, vol. 20(6), pages 681-693, December.
- Li, Dongni & Jiang, Yuzhou & Zhang, Jinhui & Cui, Zihua & Yin, Yong, 2023. "An on-line seru scheduling algorithm with proactive waiting considering resource conflicts," European Journal of Operational Research, Elsevier, vol. 309(2), pages 506-515.
- Feng Li & Zhou Xu & Zhi-Long Chen, 2020. "Production and Transportation Integration for Commit-to-Delivery Mode with General Shipping Costs," INFORMS Journal on Computing, INFORMS, vol. 32(4), pages 1012-1029, October.
- Wei, Wenchao & Guimarães, Luis & Amorim, Pedro & Almada-Lobo, Bernardo, 2017. "Tactical production and distribution planning with dependency issues on the production process," Omega, Elsevier, vol. 67(C), pages 99-114.
- Ling Liu & Sen Liu, 2020. "Integrated Production and Distribution Problem of Perishable Products with a Minimum Total Order Weighted Delivery Time," Mathematics, MDPI, vol. 8(2), pages 1-18, January.
- Li, Chung-Lun & Li, Feng, 2020. "Rescheduling production and outbound deliveries when transportation service is disrupted," European Journal of Operational Research, Elsevier, vol. 286(1), pages 138-148.
- Lixin Tang & Feng Li & Zhi-Long Chen, 2019. "Integrated Scheduling of Production and Two-Stage Delivery of Make-to-Order Products: Offline and Online Algorithms," INFORMS Journal on Computing, INFORMS, vol. 31(3), pages 493-514, July.
- Sun, X.T. & Chung, S.H. & Chan, Felix T.S. & Wang, Zheng, 2018. "The impact of liner shipping unreliability on the production–distribution scheduling of a decentralized manufacturing system," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 114(C), pages 242-269.
- Melo, Rafael A. & Wolsey, Laurence A., 2010. "Optimizing production and transportation in a commit-to-delivery business mode," European Journal of Operational Research, Elsevier, vol. 203(3), pages 614-618, June.
- Leung, Eric K.H. & Lee, Carmen Kar Hang & Ouyang, Zhiyuan, 2022. "From traditional warehouses to Physical Internet hubs: A digital twin-based inbound synchronization framework for PI-order management," International Journal of Production Economics, Elsevier, vol. 244(C).
- Elimam, A.A. & Dodin, B., 2013. "Project scheduling in optimizing integrated supply chain operations," European Journal of Operational Research, Elsevier, vol. 224(3), pages 530-541.
- Wang, Yu & Ropke, Stefan & Wen, Min & Bergh, Simon, 2023. "The mobile production vehicle routing problem: Using 3D printing in last mile distribution," European Journal of Operational Research, Elsevier, vol. 305(3), pages 1407-1423.
- Martha-Selene Casas-Ramírez & José-Fernando Camacho-Vallejo & Rosa G. González-Ramírez & José-Antonio Marmolejo-Saucedo & José-Manuel Velarde-Cantú, 2018. "Optimizing a Biobjective Production-Distribution Planning Problem Using a GRASP," Complexity, Hindawi, vol. 2018, pages 1-13, February.
- S. Mohammadi & S. Al-E-Hashem & Yacine Rekik, 2020. "An integrated production scheduling and delivery route planning with multi-purpose machines: A case study from a furniture manufacturing company," Post-Print hal-02194222, HAL.
- Berghman, Lotte & Kergosien, Yannick & Billaut, Jean-Charles, 2023. "A review on integrated scheduling and outbound vehicle routing problems," European Journal of Operational Research, Elsevier, vol. 311(1), pages 1-23.
- Guo, Zhaoxia & Shi, Leyuan & Chen, Longchao & Liang, Yong, 2017. "A harmony search-based memetic optimization model for integrated production and transportation scheduling in MTO manufacturing," Omega, Elsevier, vol. 66(PB), pages 327-343.
More about this item
Keywords
Scheduling; seru production system; Third-party logistics; Heuristic algorithm;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:268:y:2024:i:c:s0925527323003584. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.