Preventive investment, malfunctions and liability
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ijpe.2023.108930
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Kuno J.M. Huisman & Peter M. Kort, 2015.
"Strategic capacity investment under uncertainty,"
RAND Journal of Economics, RAND Corporation, vol. 46(2), pages 376-408, June.
- Huisman, K.J.M. & Kort, P.M., 2013. "Strategic Capacity Investment Under uncertainty," Discussion Paper 2013-003, Tilburg University, Center for Economic Research.
- Huisman, K.J.M. & Kort, P.M., 2013. "Strategic Capacity Investment Under uncertainty," Other publications TiSEM d8f47e8c-1550-4a51-b0fb-3, Tilburg University, School of Economics and Management.
- Nick Huberts & Kuno Huisman & Peter Kort & Maria Lavrutich, 2015. "Capacity Choice in (Strategic) Real Options Models: A Survey," Dynamic Games and Applications, Springer, vol. 5(4), pages 424-439, December.
- Steven Shavell, 2020. "On the Redesign of Accident Liability for the World of Autonomous Vehicles," The Journal of Legal Studies, University of Chicago Press, vol. 49(2), pages 243-285.
- Bruce Hay & Kathryn E. Spier, 2005. "Manufacturer Liability for Harms Caused by Consumers to Others," American Economic Review, American Economic Association, vol. 95(5), pages 1700-1711, December.
- Sang-Hyun Kim & Brian Tomlin, 2013. "Guilt by Association: Strategic Failure Prevention and Recovery Capacity Investments," Management Science, INFORMS, vol. 59(7), pages 1631-1649, July.
- Akyildirim, Erdinc & Corbet, Shaen & O'Connell, John F. & Sensoy, Ahmet, 2021. "The influence of aviation disasters on engine manufacturers: An analysis of financial and reputational contagion risks," International Review of Financial Analysis, Elsevier, vol. 74(C).
- Jay Squalli & Mohsen Saad, 2006. "Accidents airline safety perceptions and consumer demand," Journal of Economics and Finance, Springer;Academy of Economics and Finance, vol. 30(3), pages 297-305, September.
- Dangl, Thomas, 1999. "Investment and capacity choice under uncertain demand," European Journal of Operational Research, Elsevier, vol. 117(3), pages 415-428, September.
- Avinash K. Dixit & Robert S. Pindyck, 1994. "Investment under Uncertainty," Economics Books, Princeton University Press, edition 1, number 5474.
- Volodymyr Babich & Apostolos N. Burnetas & Peter H. Ritchken, 2007. "Competition and Diversification Effects in Supply Chains with Supplier Default Risk," Manufacturing & Service Operations Management, INFORMS, vol. 9(2), pages 123-146, October.
- Victor F. Araman & René Caldentey, 2009. "Dynamic Pricing for Nonperishable Products with Demand Learning," Operations Research, INFORMS, vol. 57(5), pages 1169-1188, October.
- Brian Tomlin, 2006. "On the Value of Mitigation and Contingency Strategies for Managing Supply Chain Disruption Risks," Management Science, INFORMS, vol. 52(5), pages 639-657, May.
- Rivera-Gómez, Héctor & Gharbi, Ali & Kenné, Jean Pierre, 2013. "Joint production and major maintenance planning policy of a manufacturing system with deteriorating quality," International Journal of Production Economics, Elsevier, vol. 146(2), pages 575-587.
- Yuqian Xu & Lingjiong Zhu & Michael Pinedo, 2020. "Operational Risk Management: A Stochastic Control Framework with Preventive and Corrective Controls," Operations Research, INFORMS, vol. 68(6), pages 1804-1825, November.
- Dawid, Herbert & Muehlheusser, Gerd, 2022. "Smart products: Liability, investments in product safety, and the timing of market introduction," Journal of Economic Dynamics and Control, Elsevier, vol. 134(C).
- Hongzhou Wang & Hoang Pham, 2006. "Reliability and Optimal Maintenance," Springer Series in Reliability Engineering, Springer, number 978-1-84628-325-3, June.
- Jin, Xiaoning & Li, Lin & Ni, Jun, 2009. "Option model for joint production and preventive maintenance system," International Journal of Production Economics, Elsevier, vol. 119(2), pages 347-353, June.
- Yimin Wang & Wendell Gilland & Brian Tomlin, 2010. "Mitigating Supply Risk: Dual Sourcing or Process Improvement?," Manufacturing & Service Operations Management, INFORMS, vol. 12(3), pages 489-510, September.
- Brian Tomlin, 2009. "Disruption‐management strategies for short life‐cycle products," Naval Research Logistics (NRL), John Wiley & Sons, vol. 56(4), pages 318-347, June.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Alexandra Moura & Carlos Oliveira, 2024. "Reputation risk mitigation in investment strategies," Working Papers REM 2024/0309, ISEG - Lisbon School of Economics and Management, REM, Universidade de Lisboa.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Balter, Anne G. & Huisman, Kuno J.M. & Kort, Peter M., 2022. "Effects of creative destruction on the size and timing of an investment," International Journal of Production Economics, Elsevier, vol. 252(C).
- Huberts, Nick F.D. & Rossi Silveira, Rafael, 2023. "How economic depreciation shapes the relationship of uncertainty with investments’ size & timing," International Journal of Production Economics, Elsevier, vol. 260(C).
- Balliauw, Matteo & Kort, Peter M. & Zhang, Anming, 2019. "Capacity investment decisions of two competing ports under uncertainty: A strategic real options approach," Transportation Research Part B: Methodological, Elsevier, vol. 122(C), pages 249-264.
- Azevedo, Alcino & Pereira, Paulo J. & Rodrigues, Artur, 2021. "Optimal timing and capacity choice with taxes and subsidies under uncertainty," Omega, Elsevier, vol. 102(C).
- Paxson, Dean & Pereira, Paulo J. & Rodrigues, Artur, 2022. "Investment timing, capacity choice and optimal floors and ceilings," Journal of Economic Dynamics and Control, Elsevier, vol. 139(C).
- Peter Kort & Maria Lavrutich & Cláudia Nunes & Carlos Oliveira, 2022. "Preventing Environmental Disasters in Investment under Uncertainty," Environmental & Resource Economics, Springer;European Association of Environmental and Resource Economists, vol. 83(1), pages 199-220, September.
- Zhang, Zixuan & Chronopoulos, Michail & Kyriakou, Ioannis & Dimitrova, Dimitrina S., 2024. "Bi-level optimisation of subsidy and capacity investment under competition and uncertainty," European Journal of Operational Research, Elsevier, vol. 318(1), pages 327-340.
- Balliauw, Matteo, 2021. "Time to build: A real options analysis of port capacity expansion investments under uncertainty," Research in Transportation Economics, Elsevier, vol. 90(C).
- Silaghi, Florina & Sarkar, Sudipto, 2021. "Agency problems in public-private partnerships investment projects," European Journal of Operational Research, Elsevier, vol. 290(3), pages 1174-1191.
- Kelei Xue & Yongjian Li & Xueping Zhen & Wen Wang, 2020. "Managing the supply disruption risk: option contract or order commitment contract?," Annals of Operations Research, Springer, vol. 291(1), pages 985-1026, August.
- Xiang Li, 2017. "Optimal procurement strategies from suppliers with random yield and all-or-nothing risks," Annals of Operations Research, Springer, vol. 257(1), pages 167-181, October.
- Xingang Wen & Peter M. Kort & Dolf Talman, 2017.
"Volume flexibility and capacity investment: a real options approach,"
Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 68(12), pages 1633-1646, December.
- Wen, X. & Kort, P.M. & Talman, A.J.J., 2015. "Volume Flexibility and Capacity Investment : A Real Options Approach," Discussion Paper 2015-022, Tilburg University, Center for Economic Research.
- Wen, X. & Kort, P.M. & Talman, A.J.J., 2015. "Volume Flexibility and Capacity Investment : A Real Options Approach," Other publications TiSEM 1264ebd1-5c19-496f-a11c-6, Tilburg University, School of Economics and Management.
- Long He & Ying Rong & Zuo‐Jun Max Shen, 2020. "Product Sourcing and Distribution Strategies under Supply Disruption and Recall Risks," Production and Operations Management, Production and Operations Management Society, vol. 29(1), pages 9-23, January.
- Cheong, Taesu & Song, Sang Hwa, 2013. "The value of information on supply risk under random yields," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 60(C), pages 27-38.
- Ketelaars, Martijn & Kort, Peter M., 2022.
"Investments in R&D and Production Capacity with Uncertain Breakthrough Time : Private versus Social Incentives,"
Discussion Paper
2022-010, Tilburg University, Center for Economic Research.
- Ketelaars, Martijn & Kort, Peter M., 2022. "Investments in R&D and Production Capacity with Uncertain Breakthrough Time : Private versus Social Incentives," Other publications TiSEM 345b87e4-1ed5-413f-9423-2, Tilburg University, School of Economics and Management.
- Michail Chronopoulos & Verena Hagspiel & Stein-Erik Fleten, 2017.
"Stepwise investment and capacity sizing under uncertainty,"
OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 39(2), pages 447-472, March.
- Chronopoulos, Michail & Hagspiel, Verena & Fleten, Stein–Erik, 2015. "Stepwise Investment and Capacity Sizing under Uncertainty," Discussion Papers 2015/10, Norwegian School of Economics, Department of Business and Management Science.
- Onur Boyabatlı, 2015. "Supply Management in Multiproduct Firms with Fixed Proportions Technology," Management Science, INFORMS, vol. 61(12), pages 3013-3031, December.
- Ye, Fanglin & Paulson, Nicholas & Khanna, Madhu, 2024. "Strategic innovation and technology adoption under technological uncertainty," Journal of Economic Dynamics and Control, Elsevier, vol. 165(C).
- Liu, Zhongyi & Li, Mengyu & Zhai, Xin, 2022. "Managing supply chain disruption threat via a strategy combining pricing and self-protection," International Journal of Production Economics, Elsevier, vol. 247(C).
- Qi, Lian, 2013. "A continuous-review inventory model with random disruptions at the primary supplier," European Journal of Operational Research, Elsevier, vol. 225(1), pages 59-74.
More about this item
Keywords
Investment decision; Time and capacity optimization; Malfunctions; Liability rule;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:263:y:2023:i:c:s0925527323001627. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.