Data-driven control of a production system by using marking-dependent threshold policy
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ijpe.2019.107607
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Stefan Helber & Katja Schimmelpfeng & Raik Stolletz & Svenja Lagershausen, 2011.
"Using linear programming to analyze and optimize stochastic flow lines,"
Annals of Operations Research, Springer, vol. 182(1), pages 193-211, January.
- Helber, Stefan & Schimmelpfeng, Katja & Stolletz, Raik & Lagershausen, Svenja, 2008. "Using linear programming to analyze and optimize stochastic flow lines," Hannover Economic Papers (HEP) dp-389, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.
- Alfieri, Arianna & Matta, Andrea, 2012. "Mathematical programming formulations for approximate simulation of multistage production systems," European Journal of Operational Research, Elsevier, vol. 219(3), pages 773-783.
- Giulia Pedrielli & Arianna Alfieri & Andrea Matta, 2015. "Integrated simulation–optimisation of pull control systems," International Journal of Production Research, Taylor & Francis Journals, vol. 53(14), pages 4317-4336, July.
- Matthew J. Sobel, 1982. "The Optimality of Full Service Policies," Operations Research, INFORMS, vol. 30(4), pages 636-649, August.
- Arifoglu, Kenan & Özekici, Süleyman, 2011. "Inventory management with random supply and imperfect information: A hidden Markov model," International Journal of Production Economics, Elsevier, vol. 134(1), pages 123-137, November.
- Erhan Bayraktar & Michael Ludkovski, 2010.
"Inventory management with partially observed nonstationary demand,"
Annals of Operations Research, Springer, vol. 176(1), pages 7-39, April.
- Erhan Bayraktar & Mike Ludkovski, 2012. "Inventory Management with Partially Observed Nonstationary Demand," Papers 1206.6283, arXiv.org.
- Nima Manafzadeh Dizbin & Barış Tan, 2019. "Modelling and analysis of the impact of correlated inter-event data on production control using Markovian arrival processes," Flexible Services and Manufacturing Journal, Springer, vol. 31(4), pages 1042-1076, December.
- Dimitris Bertsimas & Ioannis Ch. Paschalidis, 2001. "Probabilistic Service Level Guarantees in Make-to-Stock Manufacturing Systems," Operations Research, INFORMS, vol. 49(1), pages 119-133, February.
- Fikri Karaesmen & George Liberopoulos & Yves Dallery, 2004. "The Value of Advance Demand Information in Production/Inventory Systems," Annals of Operations Research, Springer, vol. 126(1), pages 135-157, February.
- Barış Tan & Svenja Lagershausen, 2017. "On the output dynamics of production systems subject to blocking," IISE Transactions, Taylor & Francis Journals, vol. 49(3), pages 268-284, March.
- James T. Treharne & Charles R. Sox, 2002. "Adaptive Inventory Control for Nonstationary Demand and Partial Information," Management Science, INFORMS, vol. 48(5), pages 607-624, May.
- Bariş Tan, 2015. "Mathematical programming representations of the dynamics of continuous-flow production systems," IISE Transactions, Taylor & Francis Journals, vol. 47(2), pages 173-189, February.
- Alp Akcay & Bahar Biller & Sridhar Tayur, 2011. "Improved Inventory Targets in the Presence of Limited Historical Demand Data," Manufacturing & Service Operations Management, INFORMS, vol. 13(3), pages 297-309, July.
- Jing-Sheng Song & Paul Zipkin, 1993. "Inventory Control in a Fluctuating Demand Environment," Operations Research, INFORMS, vol. 41(2), pages 351-370, April.
- He, Qi-Ming & Neuts, Marcel F., 1998. "Markov chains with marked transitions," Stochastic Processes and their Applications, Elsevier, vol. 74(1), pages 37-52, May.
- Behnaz Hosseini & Barış Tan, 2017. "Simulation and optimization of continuous-flow production systems with a finite buffer by using mathematical programming," IISE Transactions, Taylor & Francis Journals, vol. 49(3), pages 255-267, March.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Jun-Qiang Wang & Yun-Lei Song & Peng-Hao Cui & Yang Li, 2023. "A data-driven method for performance analysis and improvement in production systems with quality inspection," Journal of Intelligent Manufacturing, Springer, vol. 34(2), pages 455-469, February.
- Pirayesh Neghab, Davood & Khayyati, Siamak & Karaesmen, Fikri, 2022. "An integrated data-driven method using deep learning for a newsvendor problem with unobservable features," European Journal of Operational Research, Elsevier, vol. 302(2), pages 482-496.
- Tan, Barış & Karabağ, Oktay & Khayyati, Siamak, 2023. "Production and energy mode control of a production-inventory system," European Journal of Operational Research, Elsevier, vol. 308(3), pages 1176-1187.
- Nitin S. Solke & Pritesh Shah & Ravi Sekhar & T. P. Singh, 2022. "Machine Learning-Based Predictive Modeling and Control of Lean Manufacturing in Automotive Parts Manufacturing Industry," Global Journal of Flexible Systems Management, Springer;Global Institute of Flexible Systems Management, vol. 23(1), pages 89-112, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Manafzadeh Dizbin, Nima & Tan, Barış, 2020. "Optimal control of production-inventory systems with correlated demand inter-arrival and processing times," International Journal of Production Economics, Elsevier, vol. 228(C).
- Ricardo Montoya & Carlos Gonzalez, 2019. "A Hidden Markov Model to Detect On-Shelf Out-of-Stocks Using Point-of-Sale Data," Manufacturing & Service Operations Management, INFORMS, vol. 21(4), pages 932-948, October.
- Yee, Hannah & van Staden, Heletjé E. & Boute, Robert N., 2024. "Dual sourcing under non-stationary demand and partial observability," European Journal of Operational Research, Elsevier, vol. 314(1), pages 94-110.
- Satya S. Malladi & Alan L. Erera & Chelsea C. White, 2023. "Inventory control with modulated demand and a partially observed modulation process," Annals of Operations Research, Springer, vol. 321(1), pages 343-369, February.
- Pirayesh Neghab, Davood & Khayyati, Siamak & Karaesmen, Fikri, 2022. "An integrated data-driven method using deep learning for a newsvendor problem with unobservable features," European Journal of Operational Research, Elsevier, vol. 302(2), pages 482-496.
- Harun Avci & Kagan Gokbayrak & Emre Nadar, 2020. "Structural Results for Average‐Cost Inventory Models with Markov‐Modulated Demand and Partial Information," Production and Operations Management, Production and Operations Management Society, vol. 29(1), pages 156-173, January.
- S. Göttlich & S. Kühn & J. A. Schwarz & R. Stolletz, 2016. "Approximations of time-dependent unreliable flow lines with finite buffers," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 83(3), pages 295-323, June.
- Ioannis Ch. Paschalidis & Yong Liu, 2003. "Large Deviations-Based Asymptotics for Inventory Control in Supply Chains," Operations Research, INFORMS, vol. 51(3), pages 437-460, June.
- Boxiao Chen, 2021. "Data‐Driven Inventory Control with Shifting Demand," Production and Operations Management, Production and Operations Management Society, vol. 30(5), pages 1365-1385, May.
- Tan, Tarkan & Gullu, Refik & Erkip, Nesim, 2007. "Modelling imperfect advance demand information and analysis of optimal inventory policies," European Journal of Operational Research, Elsevier, vol. 177(2), pages 897-923, March.
- Xiangwen Lu & Jing-Sheng Song & Amelia Regan, 2006. "Inventory Planning with Forecast Updates: Approximate Solutions and Cost Error Bounds," Operations Research, INFORMS, vol. 54(6), pages 1079-1097, December.
- Erhan Bayraktar & Michael Ludkovski, 2010.
"Inventory management with partially observed nonstationary demand,"
Annals of Operations Research, Springer, vol. 176(1), pages 7-39, April.
- Erhan Bayraktar & Mike Ludkovski, 2012. "Inventory Management with Partially Observed Nonstationary Demand," Papers 1206.6283, arXiv.org.
- George Liberopoulos, 2020. "Comparison of optimal buffer allocation in flow lines under installation buffer, echelon buffer, and CONWIP policies," Flexible Services and Manufacturing Journal, Springer, vol. 32(2), pages 297-365, June.
- Arifoglu, Kenan & Özekici, Süleyman, 2011. "Inventory management with random supply and imperfect information: A hidden Markov model," International Journal of Production Economics, Elsevier, vol. 134(1), pages 123-137, November.
- Arifoglu, Kenan & Özekici, Süleyman, 2010. "Optimal policies for inventory systems with finite capacity and partially observed Markov-modulated demand and supply processes," European Journal of Operational Research, Elsevier, vol. 204(3), pages 421-438, August.
- Park, Hyungjun & Choi, Dong Gu & Min, Daiki, 2023. "Adaptive inventory replenishment using structured reinforcement learning by exploiting a policy structure," International Journal of Production Economics, Elsevier, vol. 266(C).
- Kolb, Oliver & Göttlich, Simone, 2015. "A continuous buffer allocation model using stochastic processes," European Journal of Operational Research, Elsevier, vol. 242(3), pages 865-874.
- Katy S. Azoury & Julia Miyaoka, 2009. "Optimal Policies and Approximations for a Bayesian Linear Regression Inventory Model," Management Science, INFORMS, vol. 55(5), pages 813-826, May.
- Wai Kin Victor Chan, 2016. "Linear Programming Formulation of Idle Times for Single-Server Discrete-Event Simulation Models," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 33(05), pages 1-17, October.
- Gen Sakoda & Hideki Takayasu & Misako Takayasu, 2019. "Data Science Solutions for Retail Strategy to Reduce Waste Keeping High Profit," Sustainability, MDPI, vol. 11(13), pages 1-30, June.
More about this item
Keywords
Data-driven optimization; Joint simulation and optimization; Stochastic models of production systems; Production control;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:226:y:2020:i:c:s0925527319304396. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.