Reducing the cost of preventive maintenance (PM) through adopting a proactive reliability-focused culture
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Priyank Srivastava & Dinesh Khanduja & V. P. Agrawal, 2020. "Agile maintenance attribute coding and evaluation based decision making in sugar manufacturing plant," OPSEARCH, Springer;Operational Research Society of India, vol. 57(2), pages 553-583, June.
- Sharafali, Moosa & Tarakci, Hakan & Kulkarni, Shailesh & Razack Shahul Hameed, Raja Abdul, 2019. "Optimal delivery due date for a supplier with an unreliable machine under outsourced maintenance," International Journal of Production Economics, Elsevier, vol. 208(C), pages 53-68.
- C. W. Mauelshagen & S. J. T. Pollard & D. Owen & S. Herndlhofer & P. Firth & J. McKenna & N. Bingley & P. Jenson, 2014. "Protecting asset value and driving performance with a dynamic, risk-based contingency fund," Environment Systems and Decisions, Springer, vol. 34(3), pages 417-424, September.
- Priyank Srivastava & Dinesh Khanduja & Subramaniam Ganesan, 2020. "Fuzzy methodology application for risk analysis of mechanical system in process industry," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 11(2), pages 297-312, April.
- Martínez, E. & Jiménez, E. & Blanco, J. & Sanz, F., 2010. "LCA sensitivity analysis of a multi-megawatt wind turbine," Applied Energy, Elsevier, vol. 87(7), pages 2293-2303, July.
- Ameena Saad Al-Sumaiti & Abdollah Kavousi-Fard & Magdy Salama & Motahareh Pourbehzadi & Srikanth Reddy & Muhammad Babar Rasheed, 2020. "Economic Assessment of Distributed Generation Technologies: A Feasibility Study and Comparison with the Literature," Energies, MDPI, vol. 13(11), pages 1-28, June.
- Adherbal Caminada Netto & Arthur Henrique de Andrade Melani & Carlos Alberto Murad & Miguel Angelo de Carvalho Michalski & Gilberto Francisco Martha de Souza & Silvio Ikuyo Nabeta, 2020. "A Novel Approach to Defining Maintenance Significant Items: A Hydro Generator Case Study," Energies, MDPI, vol. 13(23), pages 1-20, November.
More about this item
Keywords
Cost reduction PM Culture Best practice Nigerian industries;Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:appene:v:83:y:2006:i:11:p:1235-1248. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/wps/find/journaldescription.cws_home/405891/description#description .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.