IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v198y2018icp25-37.html
   My bibliography  Save this article

Multi-item bi-level supply chain planning with multiple remanufacturing of reusable by-products

Author

Listed:
  • Rowshannahad, Mehdi
  • Absi, Nabil
  • Dauzère-Pérès, Stéphane
  • Cassini, Bernard

Abstract

In this paper, we investigate a multi-item production planning problem in which remanufacturable raw materials are used for manufacturing the final products. The used raw material (considered as a kind of by-product) needs to be remanufactured before being suitable to be used again to manufacture other final products. However, by-products can be remanufactured only a given number of times. The manufacturing and remanufacturing processes are performed in separated production processes with limited capacity. Each product may be produced using specific raw material references (newly purchased and/or remanufactured). The original industrial case study is based on the supply chain of Silicon-On-Insulator fabrication units. The problem is modeled as a mixed-integer linear mathematical program. Using numerical examples based on industrial data, the model is validated and its behavior is analyzed. Finally, some industrial and academic perspectives to this study are proposed.

Suggested Citation

  • Rowshannahad, Mehdi & Absi, Nabil & Dauzère-Pérès, Stéphane & Cassini, Bernard, 2018. "Multi-item bi-level supply chain planning with multiple remanufacturing of reusable by-products," International Journal of Production Economics, Elsevier, vol. 198(C), pages 25-37.
  • Handle: RePEc:eee:proeco:v:198:y:2018:i:c:p:25-37
    DOI: 10.1016/j.ijpe.2018.01.014
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527318300446
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2018.01.014?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Mathijn Retel Helmrich & Raf Jans & Wilco van den Heuvel & Albert Wagelmans, 2014. "Economic lot-sizing with remanufacturing: complexity and efficient formulations," IISE Transactions, Taylor & Francis Journals, vol. 46(1), pages 67-86.
    2. William W. Trigeiro & L. Joseph Thomas & John O. McClain, 1989. "Capacitated Lot Sizing with Setup Times," Management Science, INFORMS, vol. 35(3), pages 353-366, March.
    3. Hark-Chin Hwang & Hyun-Soo Ahn & Philip Kaminsky, 2016. "Algorithms for the two-stage production-capacitated lot-sizing problem," Journal of Global Optimization, Springer, vol. 65(4), pages 777-799, August.
    4. Peter J. Billington & John O. McClain & L. Joseph Thomas, 1983. "Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction," Management Science, INFORMS, vol. 29(10), pages 1126-1141, October.
    5. Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
    6. Gabriel R. Bitran & Horacio H. Yanasse, 1982. "Computational Complexity of the Capacitated Lot Size Problem," Management Science, INFORMS, vol. 28(10), pages 1174-1186, October.
    7. Timo Hilger & Florian Sahling & Horst Tempelmeier, 2016. "Capacitated dynamic production and remanufacturing planning under demand and return uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(4), pages 849-876, October.
    8. Brian Tomlin & Yimin Wang, 2008. "Pricing and Operational Recourse in Coproduction Systems," Management Science, INFORMS, vol. 54(3), pages 522-537, March.
    9. Kis, Tamás & Kovács, András, 2013. "Exact solution approaches for bilevel lot-sizing," European Journal of Operational Research, Elsevier, vol. 226(2), pages 237-245.
    10. Felix T.S. Chan & Nan Li & S.H. Chung & Mozafar Saadat, 2017. "Management of sustainable manufacturing systems-a review on mathematical problems," International Journal of Production Research, Taylor & Francis Journals, vol. 55(4), pages 1210-1225, February.
    11. MELO, Rafael A. & WOLSEY, Laurence A., 2012. "MIP formulations and heuristics for two-level production-transportation problems," LIDAM Reprints CORE 2506, Université catholique de Louvain, Center for Operations Research and Econometrics (CORE).
    12. Kenné, Jean-Pierre & Dejax, Pierre & Gharbi, Ali, 2012. "Production planning of a hybrid manufacturing–remanufacturing system under uncertainty within a closed-loop supply chain," International Journal of Production Economics, Elsevier, vol. 135(1), pages 81-93.
    13. Zhang, Zhi-Hai & Jiang, Hai & Pan, Xunzhang, 2012. "A Lagrangian relaxation based approach for the capacitated lot sizing problem in closed-loop supply chain," International Journal of Production Economics, Elsevier, vol. 140(1), pages 249-255.
    14. Helber, Stefan & Sahling, Florian, 2010. "A fix-and-optimize approach for the multi-level capacitated lot sizing problem," International Journal of Production Economics, Elsevier, vol. 123(2), pages 247-256, February.
    15. Richter, Knut & Sombrutzki, Mirko, 2000. "Remanufacturing planning for the reverse Wagner/Whitin models," European Journal of Operational Research, Elsevier, vol. 121(2), pages 304-315, March.
    16. Genovese, Andrea & Acquaye, Adolf A. & Figueroa, Alejandro & Koh, S.C. Lenny, 2017. "Sustainable supply chain management and the transition towards a circular economy: Evidence and some applications," Omega, Elsevier, vol. 66(PB), pages 344-357.
    17. Pan, Zhendong & Tang, Jiafu & Liu, Ou, 2009. "Capacitated dynamic lot sizing problems in closed-loop supply chain," European Journal of Operational Research, Elsevier, vol. 198(3), pages 810-821, November.
    18. Idris Lalami & Yannick Frein & Jean-Philippe Gayon, 2017. "Production planning in automotive powertrain plants: a case study," International Journal of Production Research, Taylor & Francis Journals, vol. 55(18), pages 5378-5393, September.
    19. M. Florian & J. K. Lenstra & A. H. G. Rinnooy Kan, 1980. "Deterministic Production Planning: Algorithms and Complexity," Management Science, INFORMS, vol. 26(7), pages 669-679, July.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ma, Yujie & Du, Gang & Jiao, Roger J., 2024. "Design for product upgradability considering remanufacturing outsourcing: A three-level joint optimization approach," International Journal of Production Economics, Elsevier, vol. 272(C).
    2. Suzanne, Elodie & Absi, Nabil & Borodin, Valeria & van den Heuvel, Wilco, 2020. "A single-item lot-sizing problem with a by-product and inventory capacities," European Journal of Operational Research, Elsevier, vol. 287(3), pages 844-855.
    3. Suzanne, Elodie & Absi, Nabil & Borodin, Valeria, 2020. "Towards circular economy in production planning: Challenges and opportunities," European Journal of Operational Research, Elsevier, vol. 287(1), pages 168-190.
    4. Chen, Daqiang & Ignatius, Joshua & Sun, Danzhi & Zhan, Shalei & Zhou, Chenyu & Marra, Marianna & Demirbag, Mehmet, 2019. "Reverse logistics pricing strategy for a green supply chain: A view of customers' environmental awareness," International Journal of Production Economics, Elsevier, vol. 217(C), pages 197-210.
    5. Heibatolah Sadeghi & Hêriş Golpîra & Faicel Hnaien & Cosimo Magazzino, 2023. "Pricing-inventory model with discrete demand and delivery orders," Operations Research and Decisions, Wroclaw University of Science and Technology, Faculty of Management, vol. 33(3), pages 119-139.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Suzanne, Elodie & Absi, Nabil & Borodin, Valeria, 2020. "Towards circular economy in production planning: Challenges and opportunities," European Journal of Operational Research, Elsevier, vol. 287(1), pages 168-190.
    2. Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
    3. Zhang, Zhi-Hai & Jiang, Hai & Pan, Xunzhang, 2012. "A Lagrangian relaxation based approach for the capacitated lot sizing problem in closed-loop supply chain," International Journal of Production Economics, Elsevier, vol. 140(1), pages 249-255.
    4. Andrea Raiconi & Julia Pahl & Monica Gentili & Stefan Voß & Raffaele Cerulli, 2017. "Tactical Production and Lot Size Planning with Lifetime Constraints: A Comparison of Model Formulations," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 34(05), pages 1-24, October.
    5. Felix T.S. Chan & Nan Li & S.H. Chung & Mozafar Saadat, 2017. "Management of sustainable manufacturing systems-a review on mathematical problems," International Journal of Production Research, Taylor & Francis Journals, vol. 55(4), pages 1210-1225, February.
    6. Kilic, Onur A. & Tunc, Huseyin, 2019. "Heuristics for the stochastic economic lot sizing problem with remanufacturing under backordering costs," European Journal of Operational Research, Elsevier, vol. 276(3), pages 880-892.
    7. Dziuba, Daryna & Almeder, Christian, 2023. "New construction heuristic for capacitated lot sizing problems," European Journal of Operational Research, Elsevier, vol. 311(3), pages 906-920.
    8. Karimi, B. & Fatemi Ghomi, S. M. T. & Wilson, J. M., 2003. "The capacitated lot sizing problem: a review of models and algorithms," Omega, Elsevier, vol. 31(5), pages 365-378, October.
    9. Andreas Goerler & Stefan Voß, 2016. "Dynamic lot-sizing with rework of defective items and minimum lot-size constraints," International Journal of Production Research, Taylor & Francis Journals, vol. 54(8), pages 2284-2297, April.
    10. Brahimi, Nadjib & Dauzere-Peres, Stephane & Najid, Najib M. & Nordli, Atle, 2006. "Single item lot sizing problems," European Journal of Operational Research, Elsevier, vol. 168(1), pages 1-16, January.
    11. Ahmed Senoussi & Youcef Boutarfa & Nadjib Brahimi & Tarik Aouam, 2024. "Sustainable Hybrid Manufacturing and Refurbishing Systems with Substitution," Sustainability, MDPI, vol. 16(17), pages 1-33, August.
    12. Charles, Mehdi & Dauzère-Pérès, Stéphane & Kedad-Sidhoum, Safia & Mazhoud, Issam, 2022. "Motivations and analysis of the capacitated lot-sizing problem with setup times and minimum and maximum ending inventories," European Journal of Operational Research, Elsevier, vol. 302(1), pages 203-220.
    13. Timo Hilger & Florian Sahling & Horst Tempelmeier, 2016. "Capacitated dynamic production and remanufacturing planning under demand and return uncertainty," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(4), pages 849-876, October.
    14. Kilic, Onur A. & Tunc, Huseyin & Tarim, S. Armagan, 2018. "Heuristic policies for the stochastic economic lot sizing problem with remanufacturing under service level constraints," European Journal of Operational Research, Elsevier, vol. 267(3), pages 1102-1109.
    15. Awi Federgruen & Joern Meissner & Michal Tzur, 2007. "Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems," Operations Research, INFORMS, vol. 55(3), pages 490-502, June.
    16. Elena Katok & Holly S. Lewis & Terry P. Harrison, 1998. "Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources," Management Science, INFORMS, vol. 44(6), pages 859-877, June.
    17. Wei, Wenchao & Guimarães, Luis & Amorim, Pedro & Almada-Lobo, Bernardo, 2017. "Tactical production and distribution planning with dependency issues on the production process," Omega, Elsevier, vol. 67(C), pages 99-114.
    18. Pan, Zhendong & Tang, Jiafu & Liu, Ou, 2009. "Capacitated dynamic lot sizing problems in closed-loop supply chain," European Journal of Operational Research, Elsevier, vol. 198(3), pages 810-821, November.
    19. Yilmaz, Dogacan & Büyüktahtakın, İ. Esra, 2024. "An expandable machine learning-optimization framework to sequential decision-making," European Journal of Operational Research, Elsevier, vol. 314(1), pages 280-296.
    20. Petering, Matthew E.H. & Chen, Xi & Hsieh, Wen-Huan, 2019. "Inventory control with flexible demand: Cyclic case with multiple batch supply and demand processes," International Journal of Production Economics, Elsevier, vol. 212(C), pages 60-77.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:198:y:2018:i:c:p:25-37. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.