IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v194y2017icp25-31.html
   My bibliography  Save this article

Cover-Time Planning/Takt Planning: A technique for materials requirement and production planning

Author

Listed:
  • Segerstedt, Anders

Abstract

Cover-Time Planning, or Takt Planning, is presented. It is a system for calculating material requirements and start of purchases and production. Requested production rates of sales items, or alternative prefabricated modules in stock, are “broken down”, exploded, to create the need for components, for all underlying items (articles) in the Bill of Material. Inventory and already ordered replenishments are compared with the item’s desired production rate. How long already made actions are expected to cover the desired expected sales and production rates is compared with the item’s lead time; if a forward future shortage is likely the article is signalled for a refill. With examples is described how make-to-order production is done easily. The method is a type of reorder point system, but with time instead of quantity as decision variable. Unlike a traditional reorder point system increases and decreases of production can be planned. Future work load in various production sections can be estimated. It is described how an “Available-to-promise”-system should be designed and used. Cover-Time Planning (CTP) is a complete alternative to Materials Requirements Planning (MRP). CTP responds faster than MRP, since MRP for each structural level uses a batch size to “break down” and to magnify the need at the underlying level. In the end a large material acquisition needs to be ordered maybe just to build a single end item. CTP uses the end item requirement rates on all structural levels shifted with the lead times, when customer demand changes, the entire production chain react simultaneously.

Suggested Citation

  • Segerstedt, Anders, 2017. "Cover-Time Planning/Takt Planning: A technique for materials requirement and production planning," International Journal of Production Economics, Elsevier, vol. 194(C), pages 25-31.
  • Handle: RePEc:eee:proeco:v:194:y:2017:i:c:p:25-31
    DOI: 10.1016/j.ijpe.2017.04.006
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S092552731730124X
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2017.04.006?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Bonney, M. C. & Zhang, Zongmao & Head, M. A. & Tien, C. C. & Barson, R. J., 1999. "Are push and pull systems really so different?," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 53-64, March.
    2. Segerstedt, Anders, 1995. "Cover-Time Planning, a method for calculation of material requirements," International Journal of Production Economics, Elsevier, vol. 41(1-3), pages 355-368, October.
    3. Taylor, Frederick Winslow, 1911. "The Principles of Scientific Management," History of Economic Thought Books, McMaster University Archive for the History of Economic Thought, number taylor1911.
    4. Pettersen, Jan-Arne & Segerstedt, Anders, 2009. "Restricted work-in-process: A study of differences between Kanban and CONWIP," International Journal of Production Economics, Elsevier, vol. 118(1), pages 199-207, March.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Alireza Pooya & Morteza Pakdaman, 2019. "Optimal control model for finite capacity continuous MRP with deteriorating items," Journal of Intelligent Manufacturing, Springer, vol. 30(5), pages 2203-2215, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Jeremy Atack & Robert A. Margo & Paul Rhode, 2020. "‘Mechanization Takes Command’: Inanimate Power and Labor Productivity in Late Nineteenth Century American Manufacturing," NBER Working Papers 27436, National Bureau of Economic Research, Inc.
    2. N. I. Fisher & V. N. Nair, 2009. "Quality management and quality practice: Perspectives on their history and their future," Applied Stochastic Models in Business and Industry, John Wiley & Sons, vol. 25(1), pages 1-28, January.
    3. Diwas Singh KC & Bradley R. Staats, 2012. "Accumulating a Portfolio of Experience: The Effect of Focal and Related Experience on Surgeon Performance," Manufacturing & Service Operations Management, INFORMS, vol. 14(4), pages 618-633, October.
    4. Lise Arena & Anthony Hussenot, 2021. "From Innovations at Work to Innovative Ways of Conceptualizing Organization: A Brief History of Organization Studies," Post-Print hal-03290300, HAL.
    5. repec:awi:wpaper:0421 is not listed on IDEAS
    6. Bloom, Nick & Manova, Kalina & Teng Sun, Stephen & Van Reenen, John & Yu, Zhihong, 2018. "Managing trade: evidence from China and the US," LSE Research Online Documents on Economics 88703, London School of Economics and Political Science, LSE Library.
    7. Robert J. Bennett & Harry Smith & Piero Montebruno & Carry van Lieshout, 2022. "Changes in Victorian entrepreneurship in England and Wales 1851-1911: Methodology and business population estimates," Business History, Taylor & Francis Journals, vol. 64(7), pages 1211-1243, September.
    8. Jody Hoffer Gittell, 2001. "Supervisory Span, Relational Coordination and Flight Departure Performance: A Reassessment of Postbureaucracy Theory," Organization Science, INFORMS, vol. 12(4), pages 468-483, August.
    9. Dusan Gosnik & Klemen Kavcic, 2021. "Analysis of Selected Aspects of an Organisation: The Organisation as an Instrument, an Interest Group and as a Process," Managing Global Transitions, University of Primorska, Faculty of Management Koper, vol. 19(2 (Summer), pages 167-181.
    10. Brian Gill, 2022. "What Should The Future Of Educational Accountability Look Like?," Journal of Policy Analysis and Management, John Wiley & Sons, Ltd., vol. 41(4), pages 1232-1239, September.
    11. Elfenbein, Hillary Anger, 2007. "Emotion in Organizations: A Review in Stages," Institute for Research on Labor and Employment, Working Paper Series qt2bn0n9mv, Institute of Industrial Relations, UC Berkeley.
    12. Petrick, Martin, 2017. "Incentive provision to farm workers in post-socialist settings: evidence from East Germany and North Kazakhstan," EconStor Open Access Articles and Book Chapters, ZBW - Leibniz Information Centre for Economics, vol. 20(2), pages 239-256.
    13. Hervé Crès & Itzhak Gilboa, & Nicolas Vieille, 2012. "Bureaucracy in Quest for Feasibility," Working Papers hal-00973094, HAL.
    14. Marie-Laure Salles-Djelic & Michel Gutsatz, 2000. "Managerial Competencies for Organizational Flexibility: The Luxury Goods Industry between Tradition and Postmodernism," Post-Print hal-01892018, HAL.
    15. Abul Hossain Ahmed Bhuiyan & Aminul Haque Faraizi & Jim McAllister, 2008. "Planning for the deployment of development in Bangladesh," Progress in Development Studies, , vol. 8(3), pages 231-240, July.
    16. Robert Schmidt & Kasper Sanchez Vibaek & Simon Austin, 2014. "Evaluating the adaptability of an industrialized building using dependency structure matrices," Construction Management and Economics, Taylor & Francis Journals, vol. 32(1-2), pages 160-182, February.
    17. MacCormack, Alan & Baldwin, Carliss & Rusnak, John, 2012. "Exploring the duality between product and organizational architectures: A test of the “mirroring” hypothesis," Research Policy, Elsevier, vol. 41(8), pages 1309-1324.
    18. Kim, Jonghun, 2018. "School accountability and standard-based education reform: The recall of social efficiency movement and scientific management," International Journal of Educational Development, Elsevier, vol. 60(C), pages 80-87.
    19. Richard Fellows & Anita M.M. Liu, 2012. "Managing organizational interfaces in engineering construction projects: addressing fragmentation and boundary issues across multiple interfaces," Construction Management and Economics, Taylor & Francis Journals, vol. 30(8), pages 653-671, February.
    20. Jonathan R. Clark & Robert S. Huckman, 2012. "Broadening Focus: Spillovers, Complementarities, and Specialization in the Hospital Industry," Management Science, INFORMS, vol. 58(4), pages 708-722, April.
    21. Sobis Iwona & Berg Frits van den & Vries Michiel S. de, 2012. "The Limits of Leadership," NISPAcee Journal of Public Administration and Policy, Sciendo, vol. 5(1), pages 131-154, July.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:194:y:2017:i:c:p:25-31. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.