IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v142y2013i2p343-352.html
   My bibliography  Save this article

A supplier–retailer supply chain with intermediate storage for batch ordering

Author

Listed:
  • Hwang, Juhwen
  • Wan, Yat-wah

Abstract

We consider a single-commodity production-inventory supply chain in a supplier–retailer setting with batch production for the supplier, batch ordering for the retailer, and intermediate storage between the supplier and the retailer. These features have been studied in the literature of supply chain management, and are common in practice, especially in retailing and convenience store industries. This study is innovative in changing the ownership of commodity at the intermediate storage to enable more flexible delivery, as well as in allowing for non-linear cost structures. The supplier determines the number of shipments to produce and the retailer determines the number of batches to order. In the paper we suggest algorithms to identify the optimal decisions for the integrated, retailer-led, and supplier-led supply chains, respectively. The algorithms gain efficiency from pertinent analytical bounds. Numerical experiments are reported to benchmark our results against those in the literature and to provide sensitivity analysis for the batch lot size and cost parameters. Insights are gained for the integration and the operations of the supply chain.

Suggested Citation

  • Hwang, Juhwen & Wan, Yat-wah, 2013. "A supplier–retailer supply chain with intermediate storage for batch ordering," International Journal of Production Economics, Elsevier, vol. 142(2), pages 343-352.
  • Handle: RePEc:eee:proeco:v:142:y:2013:i:2:p:343-352
    DOI: 10.1016/j.ijpe.2012.12.010
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527312005026
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2012.12.010?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Goyal, Suresh K. & Gupta, Yash P., 1989. "Integrated inventory models: The buyer-vendor coordination," European Journal of Operational Research, Elsevier, vol. 41(3), pages 261-269, August.
    2. Glock, Christoph H., 2012. "Coordination of a production network with a single buyer and multiple vendors," International Journal of Production Economics, Elsevier, vol. 135(2), pages 771-780.
    3. David, Israel & Eben-Chaime, Moshe, 2008. "How accurate is the integrated vendor-buyer continuous model?," International Journal of Production Economics, Elsevier, vol. 114(2), pages 805-810, August.
    4. E. C. Keachie & Robert J. Fontana, 1966. "Effects of Learning on Optimal Lot Size," Management Science, INFORMS, vol. 13(2), pages 102-108, October.
    5. Pfohl, Hans-Christian & Shen, Xin, 2008. "Apparel Supply Chain between Europe and China," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 36320, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    6. Isabelle Huault & V. Perret & S. Charreire-Petit, 2007. "Management," Post-Print halshs-00337676, HAL.
    7. Xu, Ningxiong, 2008. "Myopic policy for a two-product and multi-period supply contract with different delivery lead times and storage limitation," International Journal of Production Economics, Elsevier, vol. 115(1), pages 179-188, September.
    8. David, Israel & Eben-Chaime, Moshe, 2003. "How far should JIT vendor-buyer relationships go?," International Journal of Production Economics, Elsevier, vol. 81(1), pages 361-368, January.
    9. Glock, C. H., 2012. "Coordination of a production network with a single buyer and multiple vendors," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57812, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    10. Jaber, Mohamad Y. & El Saadany, Ahmed M.A., 2011. "An economic production and remanufacturing model with learning effects," International Journal of Production Economics, Elsevier, vol. 131(1), pages 115-127, May.
    11. Glock, C. H., 2012. "The joint economic lot size problem: a review," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 57811, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    12. Thomas, Douglas J. & Griffin, Paul M., 1996. "Coordinated supply chain management," European Journal of Operational Research, Elsevier, vol. 94(1), pages 1-15, October.
    13. Ben-Daya, M. & Darwish, M. & Ertogral, K., 2008. "The joint economic lot sizing problem: Review and extensions," European Journal of Operational Research, Elsevier, vol. 185(2), pages 726-742, March.
    14. Hill, Roger M., 1997. "The single-vendor single-buyer integrated production-inventory model with a generalised policy," European Journal of Operational Research, Elsevier, vol. 97(3), pages 493-499, March.
    15. Jaber, Mohamad Y. & Bonney, Maurice, 2007. "Economic manufacture quantity (EMQ) model with lot-size dependent learning and forgetting rates," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 359-367, July.
    16. Hoque, M.A., 2011. "Generalized single-vendor multi-buyer integrated inventory supply chain models with a better synchronization," International Journal of Production Economics, Elsevier, vol. 131(2), pages 463-472, June.
    17. Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Liu, Weihua & Liu, Xiaoyan & Li, Xiang, 2015. "The two-stage batch ordering strategy of logistics service capacity with demand update," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 83(C), pages 65-89.
    2. Acar, Yavuz & Atadeniz, Sukran Nilvana, 2015. "Comparison of integrated and local planning approaches for the supply network of a globally-dispersed enterprise," International Journal of Production Economics, Elsevier, vol. 167(C), pages 204-219.
    3. Liu, Guoli & Li, Feng & Yang, Xianyan & Qiu, Shuang, 2020. "The multi-stage multi-product batch-sizing problem in the steel industry," Applied Mathematics and Computation, Elsevier, vol. 369(C).
    4. Po-Yu Chen, 2017. "Optimal Retail Price Model for Partial Consignment to Multiple Retailers," Complexity, Hindawi, vol. 2017, pages 1-11, December.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Herbon, Avi, 2020. "An approximated solution to the constrained integrated manufacturer-buyer supply problem," Operations Research Perspectives, Elsevier, vol. 7(C).
    2. Lee, Shine-Der & Fu, Yen-Chen, 2014. "Joint production and delivery lot sizing for a make-to-order producer–buyer supply chain with transportation cost," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 66(C), pages 23-35.
    3. Beullens, Patrick, 2014. "Revisiting foundations in lot sizing—Connections between Harris, Crowther, Monahan, and Clark," International Journal of Production Economics, Elsevier, vol. 155(C), pages 68-81.
    4. Sarker, Bhaba R. & Rochanaluk, Ratkrit & Yi, Huizhi & Egbelu, Pius J., 2014. "An operational policy for a three-stage distributive supply chain system with retailers’ backorders," International Journal of Production Economics, Elsevier, vol. 156(C), pages 332-345.
    5. Beck, Fabian G. & Glock, Christoph H. & Kim, Taebok, 2017. "Coordination of a production network with a single buyer and multiple vendors with geometrically increasing batch shipments," International Journal of Production Economics, Elsevier, vol. 193(C), pages 633-646.
    6. Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
    7. Ali Ekici & Baṣak Altan & Okan Örsan Özener, 2016. "Pricing decisions in a strategic single retailer/dual suppliers setting under order size constraints," International Journal of Production Research, Taylor & Francis Journals, vol. 54(7), pages 1887-1898, April.
    8. Sajadieh, Mohsen S. & Larsen, Christian, 2015. "A coordinated manufacturer-retailer model under stochastic demand and production rate," International Journal of Production Economics, Elsevier, vol. 168(C), pages 64-70.
    9. Hoque, M.A., 2011. "An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors," European Journal of Operational Research, Elsevier, vol. 215(1), pages 80-88, November.
    10. Banerjee, Avijit & Kim, Seung-Lae & Burton, Jonathan, 2007. "Supply chain coordination through effective multi-stage inventory linkages in a JIT environment," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 271-280, July.
    11. Ik Sun Lee, 2016. "Production and shipment policy under dynamic demand in the supply chain environments," International Journal of Applied Management Science, Inderscience Enterprises Ltd, vol. 8(1), pages 1-19.
    12. Hariga, Moncer & Gumus, Mehmet & Daghfous, Abdelkader, 2014. "Storage constrained vendor managed inventory models with unequal shipment frequencies," Omega, Elsevier, vol. 48(C), pages 94-106.
    13. Beatriz Abdul-Jalbar & Roberto Dorta-Guerra & José M. Gutiérrez & Joaquín Sicilia, 2021. "Production/Inventory Policies for a Two-Echelon System with Credit Period Incentives," Mathematics, MDPI, vol. 9(15), pages 1-25, July.
    14. Huang, Chao-Kuei & Tsai, Deng-Maw & Wu, Ji-Cheng & Chung, Kun-Jen, 2010. "An integrated vendor-buyer inventory model with order-processing cost reduction and permissible delay in payments," European Journal of Operational Research, Elsevier, vol. 202(2), pages 473-478, April.
    15. Adeinat, Hamza & Pazhani, Subramanian & Mendoza, Abraham & Ventura, Jose A., 2022. "Coordination of pricing and inventory replenishment decisions in a supply chain with multiple geographically dispersed retailers," International Journal of Production Economics, Elsevier, vol. 248(C).
    16. Jawad, Hussam & Jaber, Mohamad Y. & Nuwayhid, Rida Y., 2018. "Improving supply chain sustainability using exergy analysis," European Journal of Operational Research, Elsevier, vol. 269(1), pages 258-271.
    17. Faranak Emtehani & Nasim Nahavandi & Farimah Mokhatab Rafiei, 2021. "A joint inventory–finance model for coordinating a capital-constrained supply chain with financing limitations," Financial Innovation, Springer;Southwestern University of Finance and Economics, vol. 7(1), pages 1-39, December.
    18. Sarmah, S.P. & Acharya, D. & Goyal, S.K., 2006. "Buyer vendor coordination models in supply chain management," European Journal of Operational Research, Elsevier, vol. 175(1), pages 1-15, November.
    19. Petering, Matthew E.H. & Chen, Xi & Hsieh, Wen-Huan, 2019. "Inventory control with flexible demand: Cyclic case with multiple batch supply and demand processes," International Journal of Production Economics, Elsevier, vol. 212(C), pages 60-77.
    20. Nguyen, Christine & Dessouky, Maged & Toriello, Alejandro, 2014. "Consolidation strategies for the delivery of perishable products," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 69(C), pages 108-121.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:142:y:2013:i:2:p:343-352. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.