An optimal integrated vendor-buyer inventory policy under conditions of order-processing time reduction and permissible delay in payments
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Sarker, Bhaba R. & Coates, Eyler Robert, 1997. "Manufacturing setup cost reduction under variable lead times and finite opportunities for investment," International Journal of Production Economics, Elsevier, vol. 49(3), pages 237-247, May.
- Chun-Jen Chung & Hui-Ming Wee, 2007. "Optimal Replenishment Policy For An Integrated Supplier–Buyer Deteriorating Inventory Model Considering Multiple Jit Delivery And Other Cost Functions," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 24(01), pages 125-145.
- Chang, Hung-Chi & Ouyang, Liang-Yuh & Wu, Kun-Shan & Ho, Chia-Huei, 2006. "Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction," European Journal of Operational Research, Elsevier, vol. 170(2), pages 481-495, April.
- Woo, York Y. & Hsu, Shu-Lu & Wu, Soushan, 2001. "An integrated inventory model for a single vendor and multiple buyers with ordering cost reduction," International Journal of Production Economics, Elsevier, vol. 73(3), pages 203-215, October.
- Chen, Liang-Hsuan & Kang, Fu-Sen, 2010. "Coordination between vendor and buyer considering trade credit and items of imperfect quality," International Journal of Production Economics, Elsevier, vol. 123(1), pages 52-61, January.
- Teng, Jinn-Tsair, 2009. "Optimal ordering policies for a retailer who offers distinct trade credits to its good and bad credit customers," International Journal of Production Economics, Elsevier, vol. 119(2), pages 415-423, June.
- Zhang, Tinglong & Liang, Liang & Yu, Yugang & Yu, Yan, 2007. "An integrated vendor-managed inventory model for a two-echelon system with order cost reduction," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 241-253, September.
- Ha, Daesung, 2010. "Note on: A necessary and sufficient conditions for the existence of the optimal solution of a single-vendor single-buyer integrated production-inventory model with process unreliability consideration," International Journal of Production Economics, Elsevier, vol. 124(1), pages 106-108, March.
- Zavanella, Lucio & Zanoni, Simone, 2009. "A one-vendor multi-buyer integrated production-inventory model: The 'Consignment Stock' case," International Journal of Production Economics, Elsevier, vol. 118(1), pages 225-232, March.
- Evan L. Porteus, 1985. "Investing in Reduced Setups in the EOQ Model," Management Science, INFORMS, vol. 31(8), pages 998-1010, August.
- Huang, Chao-Kuei & Tsai, Deng-Maw & Wu, Ji-Cheng & Chung, Kun-Jen, 2010. "An integrated vendor-buyer inventory model with order-processing cost reduction and permissible delay in payments," European Journal of Operational Research, Elsevier, vol. 202(2), pages 473-478, April.
- Omar, Mohd, 2009. "An integrated equal-lots policy for shipping a vendor's final production batch to a single buyer under linearly decreasing demand," International Journal of Production Economics, Elsevier, vol. 118(1), pages 185-188, March.
- Ben-Daya, M. & Darwish, M. & Ertogral, K., 2008. "The joint economic lot sizing problem: Review and extensions," European Journal of Operational Research, Elsevier, vol. 185(2), pages 726-742, March.
- Hill, Roger M., 1997. "The single-vendor single-buyer integrated production-inventory model with a generalised policy," European Journal of Operational Research, Elsevier, vol. 97(3), pages 493-499, March.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Hossain, Md Shahriar J. & Ohaiba, Mohamed M. & Sarker, Bhaba R., 2017. "An optimal vendor-buyer cooperative policy under generalized lead-time distribution with penalty cost for delivery lateness," International Journal of Production Economics, Elsevier, vol. 188(C), pages 50-62.
- Lin, Feng & Jia, Tao & Wu, Feng & Yang, Zhen, 2019. "Impacts of two-stage deterioration on an integrated inventory model under trade credit and variable capacity utilization," European Journal of Operational Research, Elsevier, vol. 272(1), pages 219-234.
- Sraboni Mandal & Danish Ali Khan, 2015. "Integrated inventory model with uniform demand for one vendor one customer," International Journal of Business Performance and Supply Chain Modelling, Inderscience Enterprises Ltd, vol. 7(1), pages 36-52.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
- K. F. Mary Latha & M. Ganesh Kumar & R. Uthayakumar, 2021. "Two echelon economic lot sizing problems with geometric shipment policy backorder price discount and optimal investment to reduce ordering cost," OPSEARCH, Springer;Operational Research Society of India, vol. 58(4), pages 1133-1163, December.
- Taleizadeh, Ata Allah & Shokr, Iman & Konstantaras, Ioannis & VafaeiNejad, Mahyar, 2020. "Stock replenishment policies for a vendor-managed inventory in a retailing system," Journal of Retailing and Consumer Services, Elsevier, vol. 55(C).
- S. Hemapriya & R. Uthayakumar, 2017. "An inventory model with uncertain demand and lost sales reduction under service level constraint," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 1399-1418, November.
- S. Sarkar & B. C. Giri, 2020. "A vendor–buyer integrated inventory system with variable lead time and uncertain market demand," Operational Research, Springer, vol. 20(1), pages 491-515, March.
- M. Vijayashree & R. Uthayakumar, 2016. "Two-echelon supply chain inventory model with controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 7(1), pages 112-125, December.
- Rad, Reza Hosseini & Razmi, Jafar & Sangari, Mohamad Sadegh & Ebrahimi, Zahra Fallah, 2014. "Optimizing an integrated vendor-managed inventory system for a single-vendor two-buyer supply chain with determining weighting factor for vendor׳s ordering cost," International Journal of Production Economics, Elsevier, vol. 153(C), pages 295-308.
- Beatriz Abdul-Jalbar & Roberto Dorta-Guerra & José M. Gutiérrez & Joaquín Sicilia, 2021. "Production/Inventory Policies for a Two-Echelon System with Credit Period Incentives," Mathematics, MDPI, vol. 9(15), pages 1-25, July.
- Zhang, Tinglong & Liang, Liang & Yu, Yugang & Yu, Yan, 2007. "An integrated vendor-managed inventory model for a two-echelon system with order cost reduction," International Journal of Production Economics, Elsevier, vol. 109(1-2), pages 241-253, September.
- Huang, Chao-Kuei & Tsai, Deng-Maw & Wu, Ji-Cheng & Chung, Kun-Jen, 2010. "An integrated vendor-buyer inventory model with order-processing cost reduction and permissible delay in payments," European Journal of Operational Research, Elsevier, vol. 202(2), pages 473-478, April.
- Monami Das Roy & Shib Sankar Sana, 2021. "Inter-dependent lead-time and ordering cost reduction strategy: a supply chain model with quality control, lead-time dependent backorder and price-sensitive stochastic demand," OPSEARCH, Springer;Operational Research Society of India, vol. 58(3), pages 690-710, September.
- Sajadieh, Mohsen S. & Larsen, Christian, 2015. "A coordinated manufacturer-retailer model under stochastic demand and production rate," International Journal of Production Economics, Elsevier, vol. 168(C), pages 64-70.
- Feng, Xuehao & Moon, Ilkyeong & Ryu, Kwangyeol, 2017. "Warehouse capacity sharing via transshipment for an integrated two-echelon supply chain," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 104(C), pages 17-35.
- Po-Yu Chen, 2017. "Optimal Retail Price Model for Partial Consignment to Multiple Retailers," Complexity, Hindawi, vol. 2017, pages 1-11, December.
- Chen, Liang-Hsuan & Kang, Fu-Sen, 2010. "Integrated inventory models considering the two-level trade credit policy and a price-negotiation scheme," European Journal of Operational Research, Elsevier, vol. 205(1), pages 47-58, August.
- Seifert, Daniel & Seifert, Ralf W. & Protopappa-Sieke, Margarita, 2013. "A review of trade credit literature: Opportunities for research in operations," European Journal of Operational Research, Elsevier, vol. 231(2), pages 245-256.
- Hoque, M.A., 2011. "Generalized single-vendor multi-buyer integrated inventory supply chain models with a better synchronization," International Journal of Production Economics, Elsevier, vol. 131(2), pages 463-472, June.
- Yu, Yugang & Huang, George Q., 2010. "Nash game model for optimizing market strategies, configuration of platform products in a Vendor Managed Inventory (VMI) supply chain for a product family," European Journal of Operational Research, Elsevier, vol. 206(2), pages 361-373, October.
- Chang, Chun-Tao & Teng, Jinn-Tsair & Chern, Maw-Sheng, 2010. "Optimal manufacturer's replenishment policies for deteriorating items in a supply chain with up-stream and down-stream trade credits," International Journal of Production Economics, Elsevier, vol. 127(1), pages 197-202, September.
- Tarhini, Hussein & Karam, Mario & Jaber, Mohamad Y., 2020. "An integrated single-vendor multi-buyer production inventory model with transshipments between buyers," International Journal of Production Economics, Elsevier, vol. 225(C).
More about this item
Keywords
Inventory model Order-processing cost Permissible delay in payments Single-vendor single-buyer;Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:128:y:2010:i:1:p:445-451. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.