Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Evan L. Porteus, 1985. "Investing in Reduced Setups in the EOQ Model," Management Science, INFORMS, vol. 31(8), pages 998-1010, August.
- Goyal, S. K., 1995. "A one-vendor multi-buyer integrated inventory model: A comment," European Journal of Operational Research, Elsevier, vol. 82(1), pages 209-210, April.
- Hariga, Moncer & Ben-Daya, Mohamed, 1999. "Some stochastic inventory models with deterministic variable lead time," European Journal of Operational Research, Elsevier, vol. 113(1), pages 42-51, February.
- J C-H Pan & Y-C Hsiao & C-J Lee, 2002. "Inventory models with fixed and variable lead time crash costs considerations," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 53(9), pages 1048-1053, September.
- L-Y Ouyang & C-K Chen & H-C Chang, 1999. "Lead time and ordering cost reductions in continuous review inventory systems with partial backorders," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 50(12), pages 1272-1279, December.
- Hill, Roger M., 1997. "The single-vendor single-buyer integrated production-inventory model with a generalised policy," European Journal of Operational Research, Elsevier, vol. 97(3), pages 493-499, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- K. F. Mary Latha & M. Ganesh Kumar & R. Uthayakumar, 2021. "Two echelon economic lot sizing problems with geometric shipment policy backorder price discount and optimal investment to reduce ordering cost," OPSEARCH, Springer;Operational Research Society of India, vol. 58(4), pages 1133-1163, December.
- Hayya, Jack C. & Harrison, Terry P. & He, X. James, 2011. "The impact of stochastic lead time reduction on inventory cost under order crossover," European Journal of Operational Research, Elsevier, vol. 211(2), pages 274-281, June.
- Ivan Darma Wangsa & Tao Ming Yang & Hui Ming Wee, 2018. "The Effect of Price-Dependent Demand on the Sustainable Electrical Energy Supply Chain," Energies, MDPI, vol. 11(7), pages 1-18, June.
- Ouyang, Liang-Yuh & Wu, Kun-Shan & Ho, Chia-Huei, 2007. "An integrated vendor-buyer inventory model with quality improvement and lead time reduction," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 349-358, July.
- M. Vijayashree & R. Uthayakumar, 2016. "Two-echelon supply chain inventory model with controllable lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 7(1), pages 112-125, December.
- Liu, Xingchu & Cetinkaya, Sila, 2007. "A note on "quality improvement and setup reduction in the joint economic lot size model"," European Journal of Operational Research, Elsevier, vol. 182(1), pages 194-204, October.
- Goyal, S. K., 2000. "On improving the single-vendor single-buyer integrated production inventory model with a generalized policy," European Journal of Operational Research, Elsevier, vol. 125(2), pages 429-430, September.
- Affisco, John F. & Javad Paknejad, M. & Nasri, Farrokh, 2002. "Quality improvement and setup reduction in the joint economic lot size model," European Journal of Operational Research, Elsevier, vol. 142(3), pages 497-508, November.
- Chiou, Chuang-Chun & Yao, Ming-Jong & Tsai, Jenteng, 2007. "A mutually beneficial coordination mechanism for a one-supplier multi-retailers supply chain," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 314-328, July.
- Kaya, Onur & Kubalı, Deniz & Örmeci, Lerzan, 2013. "A coordinated production and shipment model in a supply chain," International Journal of Production Economics, Elsevier, vol. 143(1), pages 120-131.
- Chung, Chun Jen & Wee, Hui Ming, 2007. "Optimizing the economic lot size of a three-stage supply chain with backordering derived without derivatives," European Journal of Operational Research, Elsevier, vol. 183(2), pages 933-943, December.
- Bylka, Stanislaw, 2009. "Non-cooperative strategies for production and shipments lot sizing in the vendor-buyer system," International Journal of Production Economics, Elsevier, vol. 118(1), pages 243-252, March.
- Ho, Chia-Huei & Ouyang, Liang-Yuh & Su, Chia-Hsien, 2008. "Optimal pricing, shipment and payment policy for an integrated supplier-buyer inventory model with two-part trade credit," European Journal of Operational Research, Elsevier, vol. 187(2), pages 496-510, June.
- Abdul-Jalbar, Beatriz & Gutierrez, Jose M. & Sicilia, Joaquin, 2007. "An integrated inventory model for the single-vendor two-buyer problem," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 246-258, July.
- David, Israel & Eben-Chaime, Moshe, 2003. "How far should JIT vendor-buyer relationships go?," International Journal of Production Economics, Elsevier, vol. 81(1), pages 361-368, January.
- Chu, Chi-Leung & Leon, V. Jorge, 2008. "Single-vendor multi-buyer inventory coordination under private information," European Journal of Operational Research, Elsevier, vol. 191(2), pages 485-503, December.
- Huang, Chao-Kuei, 2004. "An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration," International Journal of Production Economics, Elsevier, vol. 91(1), pages 91-98, September.
- Sajadieh, Mohsen S. & Larsen, Christian, 2015. "A coordinated manufacturer-retailer model under stochastic demand and production rate," International Journal of Production Economics, Elsevier, vol. 168(C), pages 64-70.
- Viswanathan, S. & Piplani, Rajesh, 2001. "Coordinating supply chain inventories through common replenishment epochs," European Journal of Operational Research, Elsevier, vol. 129(2), pages 277-286, March.
- YuJan Shen & KuanFu Shen & ChihTe Yang, 2019. "A Production Inventory Model for Deteriorating Items with Collaborative Preservation Technology Investment Under Carbon Tax," Sustainability, MDPI, vol. 11(18), pages 1-18, September.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:170:y:2006:i:2:p:481-495. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.