IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v103y2006i2p715-725.html
   My bibliography  Save this article

Cyclic production-inventory planning and control in the pre-Deco industry: A case study

Author

Listed:
  • Ashayeri, J.
  • Heuts, R.J.M.
  • Lansdaal, H.G.L.
  • Strijbosch, L.W.G.

Abstract

No abstract is available for this item.

Suggested Citation

  • Ashayeri, J. & Heuts, R.J.M. & Lansdaal, H.G.L. & Strijbosch, L.W.G., 2006. "Cyclic production-inventory planning and control in the pre-Deco industry: A case study," International Journal of Production Economics, Elsevier, vol. 103(2), pages 715-725, October.
  • Handle: RePEc:eee:proeco:v:103:y:2006:i:2:p:715-725
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925-5273(06)00057-0
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. McGee, Victor E. & Pyke, David F., 1996. "Periodic production scheduling at a fastener manufacturer," International Journal of Production Economics, Elsevier, vol. 46(1), pages 65-87, December.
    2. Sox, Charles R. & Jackson, Peter L. & Bowman, Alan & Muckstadt, John A., 1999. "A review of the stochastic lot scheduling problem," International Journal of Production Economics, Elsevier, vol. 62(3), pages 181-200, September.
    3. Brander, Par & Leven, Erik & Segerstedt, Anders, 2005. "Lot sizes in a capacity constrained facility--a simulation study of stationary stochastic demand," International Journal of Production Economics, Elsevier, vol. 93(1), pages 375-386, January.
    4. Derek R. Atkins & Paul O. Iyogun, 1988. "Periodic Versus "Can-Order" Policies for Coordinated Multi-Item Inventory Systems," Management Science, INFORMS, vol. 34(6), pages 791-796, June.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ik Sun Lee, 2016. "Production and shipment policy under dynamic demand in the supply chain environments," International Journal of Applied Management Science, Inderscience Enterprises Ltd, vol. 8(1), pages 1-19.
    2. Jodlbauer, Herbert & Reitner, Sonja, 2012. "Optimizing service-level and relevant cost for a stochastic multi-item cyclic production system," International Journal of Production Economics, Elsevier, vol. 136(2), pages 306-317.
    3. Zied Bahroun & Nidhal Belgacem, 2019. "Determination of dynamic safety stocks for cyclic production schedules," Operations Management Research, Springer, vol. 12(1), pages 62-93, June.
    4. Waldemarsson, Martin & Lidestam, Helene & Karlsson, Magnus, 2017. "How energy price changes can affect production- and supply chain planning – A case study at a pulp company," Applied Energy, Elsevier, vol. 203(C), pages 333-347.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Brander, Par & Forsberg, Rolf, 2006. "Determination of safety stocks for cyclic schedules with stochastic demands," International Journal of Production Economics, Elsevier, vol. 104(2), pages 271-295, December.
    2. Vaughan, Timothy S., 2007. "Cyclical schedules vs. dynamic sequencing: Replenishment dynamics and inventory efficiency," International Journal of Production Economics, Elsevier, vol. 107(2), pages 518-527, June.
    3. Leven, Erik & Segerstedt, Anders, 2007. "A scheduling policy for adjusting economic lot quantities to a feasible solution," European Journal of Operational Research, Elsevier, vol. 179(2), pages 414-423, June.
    4. Winands, E.M.M. & Adan, I.J.B.F. & van Houtum, G.J., 2011. "The stochastic economic lot scheduling problem: A survey," European Journal of Operational Research, Elsevier, vol. 210(1), pages 1-9, April.
    5. Kouki, Chaaben & Babai, M. Zied & Jemai, Zied & Minner, Stefan, 2016. "A coordinated multi-item inventory system for perishables with random lifetime," International Journal of Production Economics, Elsevier, vol. 181(PA), pages 226-237.
    6. Musalem, Eric Porras & Dekker, Rommert, 2005. "Controlling inventories in a supply chain: A case study," International Journal of Production Economics, Elsevier, vol. 93(1), pages 179-188, January.
    7. Kerkkanen, Annastiina, 2007. "Determining semi-finished products to be stocked when changing the MTS-MTO policy: Case of a steel mill," International Journal of Production Economics, Elsevier, vol. 108(1-2), pages 111-118, July.
    8. Mahadevan, B. & Pyke, David F. & Fleischmann, Moritz, 2003. "Periodic review, push inventory policies for remanufacturing," European Journal of Operational Research, Elsevier, vol. 151(3), pages 536-551, December.
    9. Beemsterboer, Bart & Land, Martin & Teunter, Ruud, 2016. "Hybrid MTO-MTS production planning: An explorative study," European Journal of Operational Research, Elsevier, vol. 248(2), pages 453-461.
    10. Olsen, Anne L., 2008. "Inventory replenishment with interdependent ordering costs: An evolutionary algorithm solution," International Journal of Production Economics, Elsevier, vol. 113(1), pages 359-369, May.
    11. Soman, Chetan Anil & Pieter van Donk, Dirk & Gaalman, Gerard, 2006. "Comparison of dynamic scheduling policies for hybrid make-to-order and make-to-stock production systems with stochastic demand," International Journal of Production Economics, Elsevier, vol. 104(2), pages 441-453, December.
    12. Qinan Wang & Sven Axsäter, 2013. "Fixed‐interval joint‐replenishment policies for distribution systems with multiple retailers and stochastic demand," Naval Research Logistics (NRL), John Wiley & Sons, vol. 60(8), pages 637-651, December.
    13. Lopez de Haro, Santiago & Gershwin, Stanley B. & Rosenfield, Donald B., 2009. "Schedule evaluation in unstable manufacturing environments," International Journal of Production Economics, Elsevier, vol. 121(1), pages 183-194, September.
    14. S G Johansen & P Melchiors, 2003. "Can-order policy for the periodic-review joint replenishment problem," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(3), pages 283-290, March.
    15. George Liberopoulos & Dimitrios Pandelis & Olympia Hatzikonstantinou, 2013. "The stochastic economic lot sizing problem for non-stop multi-grade production with sequence-restricted setup changeovers," Annals of Operations Research, Springer, vol. 209(1), pages 179-205, October.
    16. Young Hyeon Yang & Jong Soo Kim, 2020. "An adaptive joint replenishment policy for items with non-stationary demands," Operational Research, Springer, vol. 20(3), pages 1665-1684, September.
    17. Vidal-Carreras, Pilar I. & Garcia-Sabater, Jose P. & Coronado-Hernandez, Jairo R., 2012. "Economic lot scheduling with deliberated and controlled coproduction," European Journal of Operational Research, Elsevier, vol. 219(2), pages 396-404.
    18. Fujimoto, Takahiro & Park, Young Won, 2014. "Balancing supply chain competitiveness and robustness through “virtual dual sourcing”: Lessons from the Great East Japan Earthquake," International Journal of Production Economics, Elsevier, vol. 147(PB), pages 429-436.
    19. Eynan, Amit & Kropp, Dean H., 2007. "Effective and simple EOQ-like solutions for stochastic demand periodic review systems," European Journal of Operational Research, Elsevier, vol. 180(3), pages 1135-1143, August.
    20. Smits, Sanne R. & Wagner, Michael & G. de Kok, Ton, 2004. "Determination of an order-up-to policy in the stochastic economic lot scheduling model," International Journal of Production Economics, Elsevier, vol. 90(3), pages 377-389, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:103:y:2006:i:2:p:715-725. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.