Auction approaches of long-term contracts to ensure generation investment in electricity markets: Lessons from the Brazilian and Chilean experiences
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Peter Cramton & Steven Stoft, 2006. "The Convergence of Market Designs for Adequate Generating Capacity," Papers of Peter Cramton 06mdfra, University of Maryland, Department of Economics - Peter Cramton, revised 2006.
- Cramton, Peter & Stoft, Steven, 2005.
"A Capacity Market that Makes Sense,"
The Electricity Journal, Elsevier, vol. 18(7), pages 43-54.
- Peter Cramton & Steven Stoft, 2005. "A Capacity Market that Makes Sense," Papers of Peter Cramton 05licap, University of Maryland, Department of Economics - Peter Cramton, revised 2005.
- Colin Loxley & David Salant, 2004. "Default Service Auctions," Journal of Regulatory Economics, Springer, vol. 26(2), pages 201-229, September.
- de Castro, Luciano & Negrete-Pincetic, Matias & Gross, George, 2008. "Product Definition for Future Electricity Supply Auctions: The 2006 Illinois Experience," The Electricity Journal, Elsevier, vol. 21(7), pages 50-62.
- Hugh Rudnick & Juan-Pablo Montero, 2002.
"Second Generation Electricity Reforms in Latin America and the California Paradigm,"
Journal of Industry, Competition and Trade, Springer, vol. 2(1), pages 159-172, June.
- Juan-Pablo Montero & Hugh Rudnick, 2002. "Second Generation Electricity Reforms in Latin America and the California Paradigm," Documentos de Trabajo 216, Instituto de Economia. Pontificia Universidad Católica de Chile..
- Armstrong, Mark, 2006. "Price discrimination," MPRA Paper 4693, University Library of Munich, Germany.
- Oren, Shmuel S., 2005. "Generation Adequacy via Call Options Obligations: Safe Passage to the Promised Land," The Electricity Journal, Elsevier, vol. 18(9), pages 28-42, November.
- Soledad Arellano, M. & Serra, Pablo, 2010. "Long-term contract auctions and market power in regulated power industries," Energy Policy, Elsevier, vol. 38(4), pages 1759-1763, April.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Peter Cramton & Axel Ockenfels & Steven Stoft, 2013. "Capacity Market Fundamentals," Economics of Energy & Environmental Policy, International Association for Energy Economics, vol. 0(Number 2).
- Finon, Dominique & Pignon, Virginie, 2008. "Electricity and long-term capacity adequacy: The quest for regulatory mechanism compatible with electricity market," Utilities Policy, Elsevier, vol. 16(3), pages 143-158, September.
- Peter Cramton & Axel Ockenfels, 2012. "Economics and Design of Capacity Markets for the Power Sector," Papers of Peter Cramton 12cocap, University of Maryland, Department of Economics - Peter Cramton, revised 2012.
- Juha Teirilä and Robert A. Ritz, 2019.
"Strategic Behaviour in a Capacity Market? The New Irish Electricity Market Design,"
The Energy Journal, International Association for Energy Economics, vol. 0(The New E).
- Juha Teirilä & Robert A. Ritz, 2019. "Strategic Behaviour in a Capacity Market? The New Irish Electricity Market Design," The Energy Journal, , vol. 40(1_suppl), pages 105-126, June.
- Juha Teirilä & Robert A. Ritz, 2018. "Strategic behaviour in a capacity market? The new Irish electricity market design," Working Papers EPRG 1833, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Teirilä, J. & Ritz, R., 2018. "Strategic behaviour in a capacity market? The new Irish electricity market design," Cambridge Working Papers in Economics 1863, Faculty of Economics, University of Cambridge.
- Ochoa, Camila & van Ackere, Ann, 2015. "Winners and losers of market coupling," Energy, Elsevier, vol. 80(C), pages 522-534.
- Meyer, Roland & Gore, Olga, 2015. "Cross-border effects of capacity mechanisms: Do uncoordinated market design changes contradict the goals of the European market integration?," Energy Economics, Elsevier, vol. 51(C), pages 9-20.
- Brown, David P. & Eckert, Andrew & Olmstead, Derek E.H., 2022.
"Procurement auctions for regulated retail service contracts in restructured electricity markets,"
Energy Economics, Elsevier, vol. 116(C).
- Brown, David P. & Eckert, Andrew & Olmstead, Derek E.H., 2021. "Procurement Auctions for Regulated Retail Service Contracts in Restructured Electricity Markets," Working Papers 2021-14, University of Alberta, Department of Economics.
- Elberg, Christina & Kranz, Sebastian, 2013.
"Capacity Mechanisms and Effects on Market Structure,"
VfS Annual Conference 2013 (Duesseldorf): Competition Policy and Regulation in a Global Economic Order
79811, Verein für Socialpolitik / German Economic Association.
- Elberg, Christina & Kranz, Sebastian, 2014. "Capacity Mechanisms and Effects on Market Structure," EWI Working Papers 2014-4, Energiewirtschaftliches Institut an der Universitaet zu Koeln (EWI).
- Cramton, Peter & Stoft, Steven, 2008.
"Forward reliability markets: Less risk, less market power, more efficiency,"
Utilities Policy, Elsevier, vol. 16(3), pages 194-201, September.
- Peter Cramton & Steven Stoft, 2008. "Forward Reliability Markets: Less Risk, Less Market Power, More Efficiency," Papers of Peter Cramton 08frm, University of Maryland, Department of Economics - Peter Cramton, revised 2008.
- Heikki Peura & Derek W. Bunn, 2015. "Dynamic Pricing of Peak Production," Operations Research, INFORMS, vol. 63(6), pages 1262-1279, December.
- Gürkan, G. & Ozdemir, O. & Smeers, Y., 2013. "Generation Capacity Investments in Electricity Markets : Perfect Competition," Discussion Paper 2013-045, Tilburg University, Center for Economic Research.
- Peña, Juan Ignacio & Rodriguez, Rosa, 2018. "Default supply auctions in electricity markets: Challenges and proposals," Energy Policy, Elsevier, vol. 122(C), pages 142-151.
- Simshauser, Paul, 2020.
"Merchant renewables and the valuation of peaking plant in energy-only markets,"
Energy Economics, Elsevier, vol. 91(C).
- Paul Simshauser, 2020. "Merchant renewables and the valuation of peaking plant in energy-only markets," Working Papers EPRG2002, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Simshauser, P., 2020. "Merchant renewables and the valuation of peaking plant in energy-only markets," Cambridge Working Papers in Economics 2002, Faculty of Economics, University of Cambridge.
- Roques, Fabien A., 2008.
"Market design for generation adequacy: Healing causes rather than symptoms,"
Utilities Policy, Elsevier, vol. 16(3), pages 171-183, September.
- Roques, F.A., 2008. "Market Design for Generation Adequacy: Healing Causes rather than Symptoms," Cambridge Working Papers in Economics 0821, Faculty of Economics, University of Cambridge.
- Fontini, Fulvio & Vargiolu, Tiziano & Zormpas, Dimitrios, 2021. "Investing in electricity production under a reliability options scheme," Journal of Economic Dynamics and Control, Elsevier, vol. 126(C).
- Simshauser, Paul, 2022.
"Rooftop solar PV and the peak load problem in the NEM's Queensland region,"
Energy Economics, Elsevier, vol. 109(C).
- Paul Simshauser, 2021. "Rooftop solar PV and the peak load problem in the NEM’s Queensland region," Working Papers EPRG2125, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
- Simshauser, P., 2021. "Rooftop Solar PV and the Peak Load Problem in the NEM's Queensland Region," Cambridge Working Papers in Economics 2180, Faculty of Economics, University of Cambridge.
- Wolfgang Buchholz & Jonas Frank & Hans-Dieter Karl & Johannes Pfeiffer & Karen Pittel & Ursula Triebswetter & Jochen Habermann & Wolfgang Mauch & Thomas Staudacher, 2012. "Die Zukunft der Energiemärkte: Ökonomische Analyse und Bewertung von Potenzialen und Handlungsmöglichkeiten," ifo Forschungsberichte, ifo Institute - Leibniz Institute for Economic Research at the University of Munich, number 57, July.
- Ausubel, Lawrence M. & Cramton, Peter, 2010.
"Using forward markets to improve electricity market design,"
Utilities Policy, Elsevier, vol. 18(4), pages 195-200, December.
- Lawrence M. Ausubel & Peter Cramton, 2009. "Using Forward Markets to Improve Electricity Market Design," Papers of Peter Cramton 09ufm, University of Maryland, Department of Economics - Peter Cramton, revised 2009.
- Heidarizadeh, Mohammad & Ahmadian, Mohammad, 2019. "Capacity certificate mechanism: A step forward toward a market based generation capacity incentive," Energy, Elsevier, vol. 172(C), pages 45-56.
- Gürkan, G. & Ozdemir, O. & Smeers, Y., 2013. "Generation Capacity Investments in Electricity Markets : Perfect Competition," Other publications TiSEM 97828b2c-3630-4b66-8ac9-f, Tilburg University, School of Economics and Management.
More about this item
Keywords
Long-term contract Auction design Generation investment;Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:enepol:v:38:y:2010:i:10:p:5758-5769. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/enpol .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.