IDEAS home Printed from https://ideas.repec.org/a/eee/enepol/v37y2009i11p4549-4556.html
   My bibliography  Save this article

A regional energy paradox--the case of Central Norway

Author

Listed:
  • Sandsmark, Maria

Abstract

Central Norway is expected to have a gap of 8Â TWh in 2010 because of heavy investments in energy-intensive industries. The region has two landing sites for natural gas and a considerable potential for wind power to cover the gap. Small-scale hydropower and upgrading of existing hydropower plants also constitute a regional energy potential. Paradoxically, the most realistic investment prospect seems to be extensive investments in new transmission lines to cover the supply deficit. The aim of this paper is to present a problem of regional supply security and public intervention to illustrate and discuss the challenges of arriving at long-term capacity adequacy in deregulated electricity markets.

Suggested Citation

  • Sandsmark, Maria, 2009. "A regional energy paradox--the case of Central Norway," Energy Policy, Elsevier, vol. 37(11), pages 4549-4556, November.
  • Handle: RePEc:eee:enepol:v:37:y:2009:i:11:p:4549-4556
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0301-4215(09)00425-X
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Nils-Henrik M. von der Fehr, Eirik S. Amundsen and Lars Bergman, 2005. "The Nordic Market: Signs of Stress?," The Energy Journal, International Association for Energy Economics, vol. 0(Special I), pages 71-98.
    2. Bye, Torstein & Bruvoll, Annegrete & Aune, Finn Roar, 2008. "Inflow shortages in deregulated power markets -- Reasons for concern?," Energy Economics, Elsevier, vol. 30(4), pages 1693-1711, July.
    3. Paul Joskow & Jean Tirole, 2005. "Merchant Transmission Investment," Journal of Industrial Economics, Wiley Blackwell, vol. 53(2), pages 233-264, June.
    4. D. Finon & Ta Johnsen & A Midttun, 2004. "Challenges when electricity markets face the investment phase," Post-Print hal-00716551, HAL.
    5. Jamasb, Tooraj & Pollitt, Michael, 2008. "Security of supply and regulation of energy networks," Energy Policy, Elsevier, vol. 36(12), pages 4584-4589, December.
    6. Amundsen, Eirik S. & Bergman, Lars, 2007. "Integration of multiple national markets for electricity: The case of Norway and Sweden," Energy Policy, Elsevier, vol. 35(6), pages 3383-3394, June.
    7. Finon, Dominique & Pignon, Virginie, 2008. "Electricity and long-term capacity adequacy: The quest for regulatory mechanism compatible with electricity market," Utilities Policy, Elsevier, vol. 16(3), pages 143-158, September.
    8. de Vries, Laurens & Heijnen, Petra, 2008. "The impact of electricity market design upon investment under uncertainty: The effectiveness of capacity mechanisms," Utilities Policy, Elsevier, vol. 16(3), pages 215-227, September.
    9. Ruff, Larry E., 2002. "Demand Response: Reality versus "Resource"," The Electricity Journal, Elsevier, vol. 15(10), pages 10-23, December.
    10. Amundsen, Eirik S. & Bergman, Lars, 2006. "Why has the Nordic electricity market worked so well?," Utilities Policy, Elsevier, vol. 14(3), pages 148-157, September.
    11. von Hirschhausen, Christian & Beckers, Thorsten & Brenck, Andreas, 2004. "Infrastructure regulation and investment for the long-term--an introduction," Utilities Policy, Elsevier, vol. 12(4), pages 203-210, December.
    12. Joskow, Paul L., 2008. "Capacity payments in imperfect electricity markets: Need and design," Utilities Policy, Elsevier, vol. 16(3), pages 159-170, September.
    13. Dominique Finon & Virginie Pignon, 2008. "Electricity and long-term capacity adequacy: The quest for regulatory mechanism compatible with electricity market," Post-Print hal-00716312, HAL.
    14. De Vries, Laurens J., 2007. "Generation adequacy: Helping the market do its job," Utilities Policy, Elsevier, vol. 15(1), pages 20-35, March.
    15. Hogan, William W., 2003. "Transmission Market Design," Working Paper Series rwp03-040, Harvard University, John F. Kennedy School of Government.
    16. Finon, Dominique & Johnsen, Tor Arnt & Midttun, Atle, 2004. "Challenges when electricity markets face the investment phase," Energy Policy, Elsevier, vol. 32(12), pages 1355-1362, August.
    17. Johnsen, Tor Arnt, 2003. "Residential Customers and Competitive Electricity Markets: The Case of Norway," The Electricity Journal, Elsevier, vol. 16(1), pages 74-79.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Assefa Hagos, Dejene & Gebremedhin, Alemayehu & Folsland Bolkesjø, Torjus, 2015. "Comparing the value of bioenergy in the heating and transport sectors of an electricity-intensive energy system in Norway," Energy Policy, Elsevier, vol. 85(C), pages 386-396.
    2. Lin, Tyrone T. & Huang, Shio-Ling, 2010. "An entry and exit model on the energy-saving investment strategy with real options," Energy Policy, Elsevier, vol. 38(2), pages 794-802, February.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Keppler, Jan Horst & Quemin, Simon & Saguan, Marcelo, 2022. "Why the sustainable provision of low-carbon electricity needs hybrid markets," Energy Policy, Elsevier, vol. 171(C).
    2. Elberg, Christina, 2014. "Cross-Border Effects of Capacity Mechanisms in Electricity Markets," EWI Working Papers 2014-11, Energiewirtschaftliches Institut an der Universitaet zu Koeln (EWI).
    3. Mastropietro, Paolo & Rodilla, Pablo & Rivier, Michel & Batlle, Carlos, 2024. "Reliability options: Regulatory recommendations for the next generation of capacity remuneration mechanisms," Energy Policy, Elsevier, vol. 185(C).
    4. Nils-Henrik M. von der Fehr & Petter Vegard Hansen, 2010. "Electricity Retailing in Norway," The Energy Journal, International Association for Energy Economics, vol. 0(Number 1), pages 25-46.
    5. Simshauser, Paul, 2020. "Merchant renewables and the valuation of peaking plant in energy-only markets," Energy Economics, Elsevier, vol. 91(C).
    6. Keppler, Jan Horst, 2017. "Rationales for capacity remuneration mechanisms: Security of supply externalities and asymmetric investment incentives," Energy Policy, Elsevier, vol. 105(C), pages 562-570.
    7. Simshauser, Paul, 2022. "Rooftop solar PV and the peak load problem in the NEM's Queensland region," Energy Economics, Elsevier, vol. 109(C).
    8. Paul Simshauser, 2021. "Lessons from Australia's National Electricity Market 1998-2018: strengths and weaknesses of the reform experience," Chapters, in: Jean-Michel Glachant & Paul L. Joskow & Michael G. Pollitt (ed.), Handbook on Electricity Markets, chapter 9, pages 242-286, Edward Elgar Publishing.
    9. Osorio, Sebastian & van Ackere, Ann & Larsen, Erik R., 2017. "Interdependencies in security of electricity supply," Energy, Elsevier, vol. 135(C), pages 598-609.
    10. Petitet, Marie & Finon, Dominique & Janssen, Tanguy, 2017. "Capacity adequacy in power markets facing energy transition: A comparison of scarcity pricing and capacity mechanism," Energy Policy, Elsevier, vol. 103(C), pages 30-46.
    11. Ochoa, Camila & van Ackere, Ann, 2015. "Does size matter? Simulating electricity market coupling between Colombia and Ecuador," Renewable and Sustainable Energy Reviews, Elsevier, vol. 50(C), pages 1108-1124.
    12. Cepeda, Mauricio & Finon, Dominique, 2013. "How to correct for long-term externalities of large-scale wind power development by a capacity mechanism?," Energy Policy, Elsevier, vol. 61(C), pages 671-685.
    13. Weigt, Hannes, 2009. "A Review of Liberalization and Modeling of Electricity Markets," MPRA Paper 65651, University Library of Munich, Germany.
    14. de Vries, Laurens & Heijnen, Petra, 2008. "The impact of electricity market design upon investment under uncertainty: The effectiveness of capacity mechanisms," Utilities Policy, Elsevier, vol. 16(3), pages 215-227, September.
    15. Sebastian Schäfer & Lisa Altvater, 2019. "On the functioning of a capacity market with an increasing share of renewable energy," Journal of Regulatory Economics, Springer, vol. 56(1), pages 59-84, August.
    16. Cepeda, Mauricio & Finon, Dominique, 2011. "Generation capacity adequacy in interdependent electricity markets," Energy Policy, Elsevier, vol. 39(6), pages 3128-3143, June.
    17. Simshauser, Paul & Gilmore, Joel, 2022. "Climate change policy discontinuity & Australia's 2016-2021 renewable investment supercycle," Energy Policy, Elsevier, vol. 160(C).
    18. Nelson, Tim & Reid, Cameron & McNeill, Judith, 2015. "Energy-only markets and renewable energy targets: Complementary policy or policy collision?," Economic Analysis and Policy, Elsevier, vol. 46(C), pages 25-42.
    19. Simshauser, Paul, 2019. "Missing money, missing policy and Resource Adequacy in Australia's National Electricity Market," Utilities Policy, Elsevier, vol. 60(C), pages 1-1.
    20. Becker, Sophia & Schober, Dominik & Wassermann, Sandra, 2016. "How to approach consumers’ nonmonetary evaluation of electricity supply security? The case of Germany from a multidisciplinary perspective," Utilities Policy, Elsevier, vol. 42(C), pages 74-84.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:enepol:v:37:y:2009:i:11:p:4549-4556. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/enpol .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.