Transmission expansion in Argentina 2: The Fourth Line revisited

Author

Listed:
  • Littlechild, Stephen C.
  • Skerk, Carlos J.

Abstract

In 1992, Argentina introduced the Public Contest method, which required transmission users to propose, vote and pay for major expansions of the electricity transmission system. Economists, consultants, the regulator and others held the application of this method to be unsuccessful, mainly on the ground that "for many years" it delayed investment in a "much needed" Fourth Line to Buenos Aires. The commentators blamed externalities, free-rider problems, the Area of Influence method used to define voting rights, and transactions costs. This paper re-examines the history and economics of the Fourth Line. The delay to the Fourth Line was short (a year and a half rather than many years) and enabled a significant reduction in construction costs. Externalities, free-riding, the Area of Influence method and transactions costs were not problematic. The Fourth Line was initially rejected because it was unprofitable to key beneficiaries. Far from being much needed, the Fourth Line was not economic because the congestion it avoided was worth less than the cost of building it. It had become more economic to transport gas to generate electricity near Buenos Aires than to transmit electricity over long distances. The location of subsequent power stations reflected this. Even though the presence of a subsidy meant that the Public Contest method did not prevent the building of the Fourth Line, it nonetheless forced a much-needed reappraisal of traditional transmission investment policy.

Suggested Citation

  • Littlechild, Stephen C. & Skerk, Carlos J., 2008. "Transmission expansion in Argentina 2: The Fourth Line revisited," Energy Economics, Elsevier, vol. 30(4), pages 1385-1419, July.
  • Handle: RePEc:eee:eneeco:v:30:y:2008:i:4:p:1385-1419
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0140-9883(08)00007-8
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Manuel Angel Abdala & Andres Chambouleyron, 1999. "Transmission Investment in Competitive Power Systems : Decentralizing decisions in Argentina," World Bank Publications - Reports 11466, The World Bank Group.
    2. Chisari, Omar O. & Dal-Bo, Pedro & Romero, Carlos A., 2001. "High-tension electricity network expansions in Argentina: decision mechanisms and willingness-to-pay revelation," Energy Economics, Elsevier, vol. 23(6), pages 697-715, November.
    3. Bushnell, James B. & Stoft, Steven E., 1997. "Improving private incentives for electric grid investment," Resource and Energy Economics, Elsevier, vol. 19(1-2), pages 85-108, March.
    4. Paul Joskow & Jean Tirole, 2005. "Merchant Transmission Investment," Journal of Industrial Economics, Wiley Blackwell, vol. 53(2), pages 233-264, June.
    5. S. Littlechild, 2004. "Regulated and merchant interconnectors in Australia: SNI and Murraylink revisited," Working Papers EP37, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
    6. Paul L. Joskow, 2006. "Incentive Regulation for Electricity Networks," ifo DICE Report, ifo Institute - Leibniz Institute for Economic Research at the University of Munich, vol. 4(02), pages 3-9, July.
    7. Pollitt, Michael, 2008. "Electricity reform in Argentina: Lessons for developing countries," Energy Economics, Elsevier, vol. 30(4), pages 1536-1567, July.
    8. Paul L. Joskow, 2014. "Incentive Regulation in Theory and Practice: Electricity Distribution and Transmission Networks," NBER Chapters, in: Economic Regulation and Its Reform: What Have We Learned?, pages 291-344, National Bureau of Economic Research, Inc.
    9. Hogan, William W, 1992. "Contract Networks for Electric Power Transmission," Journal of Regulatory Economics, Springer, vol. 4(3), pages 211-242, September.
    10. Littlechild, Stephen C. & Skerk, Carlos J., 2008. "Transmission expansion in Argentina 3: The evolution of policy," Energy Economics, Elsevier, vol. 30(4), pages 1420-1461, July.
    11. Rotger, José A. & Felder, Frank A., 2001. "Reconciling Market-Based Transmission and Transmission Planning, , , , , ," The Electricity Journal, Elsevier, vol. 14(9), pages 31-43, November.
    12. Littlechild, Stephen C. & Ponzano, Eduardo A., 2008. "Transmission expansion in Argentina 5: The regional electricity forum of Buenos Aires province," Energy Economics, Elsevier, vol. 30(4), pages 1491-1526, July.
    13. Littlechild, Stephen C. & Skerk, Carlos J., 2008. "Transmission expansion in Argentina 4: A review of performance," Energy Economics, Elsevier, vol. 30(4), pages 1462-1490, July.
    14. Abdala, Manuel A., 2008. "Transmission pricing in privately-owned electricity grids: An illustration from the Argentine electricity pool," Energy Economics, Elsevier, vol. 30(4), pages 1284-1305, July.
    15. repec:ces:ifodic:v:4:y:2006:i:2:p:14567496 is not listed on IDEAS
    16. Thomas-Olivier Leautier, 2000. "Regulation of an Electric Power Transmission Company," The Energy Journal, International Association for Energy Economics, vol. 0(Number 4), pages 61-92.
    17. Littlechild, Stephen C. & Skerk, Carlos J., 2008. "Transmission expansion in Argentina 1: The origins of policy," Energy Economics, Elsevier, vol. 30(4), pages 1367-1384, July.
    18. Paul L. Joskow, 2006. "Incentive Regulation for Electricity Networks," ifo DICE Report, ifo Institute - Leibniz Institute for Economic Research at the University of Munich, vol. 4(2), pages 3-9, 07.
    19. Stephen C. Littlechild & Carlos J. Skerk, 2004. "Regulation of transmission expansion in Argentina Part I: State ownership, reform and the Fourth Line," Working Papers EP61, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
    20. Ronald Coase, 2006. "The Conduct of Economics: The Example of Fisher Body and General Motors," Journal of Economics & Management Strategy, Wiley Blackwell, vol. 15(2), pages 255-278, June.
    21. Chao, Hung-Po & Peck, Stephen, 1996. "A Market Mechanism for Electric Power Transmission," Journal of Regulatory Economics, Springer, vol. 10(1), pages 25-59, July.
    22. Vogelsang, Ingo, 2001. "Price Regulation for Independent Transmission Companies," Journal of Regulatory Economics, Springer, vol. 20(2), pages 141-165, September.
    23. Abdala, Manuel A., 2008. "Governance of competitive transmission investment in weak institutional systems," Energy Economics, Elsevier, vol. 30(4), pages 1306-1320, July.
    24. Bushnell, James B & Stoft, Steven E, 1996. "Electric Grid Investment under a Contract Network Regime," Journal of Regulatory Economics, Springer, vol. 10(1), pages 61-79, July.
    25. Antonio Estache & Martin Rodriguez-Pardina, 1996. "Regulatory Lessons from Argentina's Power Concessions," World Bank Publications - Reports 11609, The World Bank Group.
    26. Littlechild, Stephen C. & Skerk, Carlos J., 2008. "Transmission expansion in Argentina 6: Distribution companies, regulation and the Public Contest method," Energy Economics, Elsevier, vol. 30(4), pages 1527-1535, July.
    27. Stephen C. Stephen C. & Carlos J. Skerk, 2004. "Regulation of Transmission Expansion in Argentina: Part II – Developments Since the Fourth Line," Working Papers EP62, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
    28. Leautier, Thomas-Olivier, 2001. "Transmission Constraints and Imperfect Markets for Power," Journal of Regulatory Economics, Springer, vol. 19(1), pages 27-54, January.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Littlechild, Stephen C. & Skerk, Carlos J., 2008. "Transmission expansion in Argentina 4: A review of performance," Energy Economics, Elsevier, vol. 30(4), pages 1462-1490, July.
    2. Littlechild, Stephen C. & Skerk, Carlos J., 2008. "Transmission expansion in Argentina 3: The evolution of policy," Energy Economics, Elsevier, vol. 30(4), pages 1420-1461, July.
    3. Littlechild, Stephen C. & Ponzano, Eduardo A., 2008. "Transmission expansion in Argentina 5: The regional electricity forum of Buenos Aires province," Energy Economics, Elsevier, vol. 30(4), pages 1491-1526, July.
    4. Stephen Littlechild, 2012. "Merchant and regulated transmission: theory, evidence and policy," Journal of Regulatory Economics, Springer, vol. 42(3), pages 308-335, December.
    5. Strbac, Goran & Pollitt, Michael & Konstantinidis, Christos Vasilakos & Konstantelos, Ioannis & Moreno, Rodrigo & Newbery, David & Green, Richard, 2014. "Electricity transmission arrangements in Great Britain: Time for change?," Energy Policy, Elsevier, vol. 73(C), pages 298-311.
    6. Littlechild, Stephen C. & Skerk, Carlos J., 2008. "Transmission expansion in Argentina 1: The origins of policy," Energy Economics, Elsevier, vol. 30(4), pages 1367-1384, July.
    7. Pollitt, Michael, 2008. "Electricity reform in Argentina: Lessons for developing countries," Energy Economics, Elsevier, vol. 30(4), pages 1536-1567, July.
    8. Erdogdu, Erkan, 2013. "Essays on Electricity Market Reforms: A Cross-Country Applied Approach," MPRA Paper 47139, University Library of Munich, Germany.
    9. Littlechild, Stephen C. & Skerk, Carlos J., 2008. "Transmission expansion in Argentina 6: Distribution companies, regulation and the Public Contest method," Energy Economics, Elsevier, vol. 30(4), pages 1527-1535, July.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Stephen Littlechild, 2012. "Merchant and regulated transmission: theory, evidence and policy," Journal of Regulatory Economics, Springer, vol. 42(3), pages 308-335, December.
    2. Stephen C. Littlechild & Carlos J. Skerk, 2004. "Regulation of transmission expansion in Argentina Part I: State ownership, reform and the Fourth Line," Working Papers EP61, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
    3. Littlechild, Stephen C. & Ponzano, Eduardo A., 2008. "Transmission expansion in Argentina 5: The regional electricity forum of Buenos Aires province," Energy Economics, Elsevier, vol. 30(4), pages 1491-1526, July.
    4. Littlechild, Stephen C. & Skerk, Carlos J., 2008. "Transmission expansion in Argentina 1: The origins of policy," Energy Economics, Elsevier, vol. 30(4), pages 1367-1384, July.
    5. Littlechild, Stephen C. & Skerk, Carlos J., 2008. "Transmission expansion in Argentina 3: The evolution of policy," Energy Economics, Elsevier, vol. 30(4), pages 1420-1461, July.
    6. Littlechild, Stephen C. & Skerk, Carlos J., 2008. "Transmission expansion in Argentina 4: A review of performance," Energy Economics, Elsevier, vol. 30(4), pages 1462-1490, July.
    7. Thomas-Olivier Léautier & Véronique Thelen, 2009. "Optimal expansion of the power transmission grid: why not?," Journal of Regulatory Economics, Springer, vol. 36(2), pages 127-153, October.
    8. Rosellon, Juan, 2007. "An incentive mechanism for electricity transmission expansion in Mexico," Energy Policy, Elsevier, vol. 35(5), pages 3003-3014, May.
    9. Pollitt, Michael, 2008. "Electricity reform in Argentina: Lessons for developing countries," Energy Economics, Elsevier, vol. 30(4), pages 1536-1567, July.
    10. Abdala, Manuel A., 2008. "Governance of competitive transmission investment in weak institutional systems," Energy Economics, Elsevier, vol. 30(4), pages 1306-1320, July.
    11. Richard O’Neill & Emily Fisher & Benjamin Hobbs & Ross Baldick, 2008. "Towards a complete real-time electricity market design," Journal of Regulatory Economics, Springer, vol. 34(3), pages 220-250, December.
    12. Brunekreeft, Gert & Neuhoff, Karsten & Newbery, David, 2005. "Electricity transmission: An overview of the current debate," Utilities Policy, Elsevier, vol. 13(2), pages 73-93, June.
    13. Paul Joskow & Jean Tirole, 2005. "Merchant Transmission Investment," Journal of Industrial Economics, Wiley Blackwell, vol. 53(2), pages 233-264, June.
    14. Makoto TANAKA, 2005. "Optimal Transmission Capacity under Nodal Pricing and Incentive Regulation for Transco," Discussion papers 05021, Research Institute of Economy, Trade and Industry (RIETI).
    15. Matsukawa, Isamu, 2008. "The effects of average revenue regulation on electricity transmission investment and pricing," Energy Economics, Elsevier, vol. 30(3), pages 696-714, May.
    16. William Hogan & Juan Rosellón & Ingo Vogelsang, 2010. "Toward a combined merchant-regulatory mechanism for electricity transmission expansion," Journal of Regulatory Economics, Springer, vol. 38(2), pages 113-143, October.
    17. Ingo Vogelsang, 2006. "Electricity Transmission Pricing and Performance-based Regulation," The Energy Journal, International Association for Energy Economics, vol. 0(Number 4), pages 97-126.
    18. Juan Rosellón, Ingo Vogelsang, and Hannes Weigt, 2012. "Long-run Cost Functions for Electricity Transmission," The Energy Journal, International Association for Energy Economics, vol. 0(Number 1).
    19. Ruderer, Dominik & Zöttl, Gregor, 2018. "Transmission pricing and investment incentives," Utilities Policy, Elsevier, vol. 55(C), pages 14-30.
    20. Rosellon, Juan & Tregear, Juan & Zenon, Eric, 2010. "El modelo HRV para expansión óptima de redes de transmisión: una aplicación a la red eléctrica de Ontario [The HRV Model for the Optimal Expansion of Transmission Networks: an Application to the On," MPRA Paper 26471, University Library of Munich, Germany.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:eneeco:v:30:y:2008:i:4:p:1385-1419. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eneco .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.