A forward branch-and-search algorithm and forecast horizon results for the changeover scheduling problem
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- C. R. Glassey, 1968. "Minimum Change-Over Scheduling of Several Products on One Machine," Operations Research, INFORMS, vol. 16(2), pages 342-352, April.
- Marc Salomon & Leo G. Kroon & Roelof Kuik & Luk N. Van Wassenhove, 1991. "Some Extensions of the Discrete Lotsizing and Scheduling Problem," Management Science, INFORMS, vol. 37(7), pages 801-812, July.
- Chung-Yee Lee & Eric V. Denardo, 1986. "Rolling Planning Horizons: Error Bounds for the Dynamic Lot Size Model," Mathematics of Operations Research, INFORMS, vol. 11(3), pages 423-432, August.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Milind Dawande & Srinagesh Gavirneni & Sanjeewa Naranpanawe & Suresh Sethi, 2007. "Forecast Horizons for a Class of Dynamic Lot-Size Problems Under Discrete Future Demand," Operations Research, INFORMS, vol. 55(4), pages 688-702, August.
- Milind Dawande & Srinagesh Gavirneni & Yinping Mu & Suresh Sethi & Chelliah Sriskandarajah, 2010. "On the Interaction Between Demand Substitution and Production Changeovers," Manufacturing & Service Operations Management, INFORMS, vol. 12(4), pages 682-691, September.
- James D. Blocher & Suresh Chand & Kaushik Sengupta, 1999. "The Changeover Scheduling Problem with Time and Cost Considerations: Analytical Results and a Forward Algorithm," Operations Research, INFORMS, vol. 47(4), pages 559-569, August.
- Suresh Chand & Vernon Ning Hsu & Suresh Sethi, 2002. "Forecast, Solution, and Rolling Horizons in Operations Management Problems: A Classified Bibliography," Manufacturing & Service Operations Management, INFORMS, vol. 4(1), pages 25-43, September.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Bruggemann, Wolfgang & Jahnke, Hermann, 2000. "The discrete lot-sizing and scheduling problem: Complexity and modification for batch availability," European Journal of Operational Research, Elsevier, vol. 124(3), pages 511-528, August.
- Kimms, Alf, 1996. "Stability measures for rolling schedules with applications to capacity expansion planning, master production scheduling, and lot sizing," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 418, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Kimms, A, 1998. "Stability Measures for Rolling Schedules with Applications to Capacity Expansion Planning, Master Production Scheduling, and Lot Sizing," Omega, Elsevier, vol. 26(3), pages 355-366, June.
- Sungmin Kang & Kavindra Malik & L. Joseph Thomas, 1999. "Lotsizing and Scheduling on Parallel Machines with Sequence-Dependent Setup Costs," Management Science, INFORMS, vol. 45(2), pages 273-289, February.
- Stanislaw Bylka, 1997. "Strong turnpike policies in the single‐item capacitated lot‐sizing problem with periodical dynamic parameter," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(8), pages 775-790, December.
- Liao, C. J. & Yu, W. C., 1996. "Sequencing heuristics for dependent setups in a continuous process industry," Omega, Elsevier, vol. 24(6), pages 649-659, December.
- Kimms, Alf & Drexl, Andreas, 1996. "Shortcomings of MRP II and a new planning meta-method," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 404, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Michael Bastian, 1992. "A perfect lot‐tree procedure for the discounted dynamic lot‐size problem with speculation," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(5), pages 651-668, August.
- Wolter, Anja & Helber, Stefan, 2013. "Simultaneous Production and Maintenance Planning for a Single Capacitated Resource facing both a Dynamic Demand and Intensive Wear and Tear," Hannover Economic Papers (HEP) dp-522, Leibniz Universität Hannover, Wirtschaftswissenschaftliche Fakultät.
- James C. Bean & Jack R. Lohmann & Robert L. Smith, 1994. "Equipment replacement under technological change," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(1), pages 117-128, February.
- van Hoesel, C.P.M. & Wagelmans, A.P.M., 1997. "Fully Polynomial Approximation Schemes for Single-Item Capacitated Economic Lot-Sizing Problems," Econometric Institute Research Papers EI 9735/A, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Ghadimi, Foad & Aouam, Tarik & Haeussler, Stefan & Uzsoy, Reha, 2022. "Integrated and hierarchical systems for coordinating order acceptance and release planning," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1277-1289.
- Drexl, Andreas & Jordan, Carsten & Kimms, Alf, 1997. "Gruppierungs- und Reihenfolgeprobleme in der Fertigung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 447, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Lee, C.Y. & Cetinkaya, S. & Wagelmans, A.P.M., 1999. "A dynamic lot-sizing model with demand time windows," Econometric Institute Research Papers EI 9948-/A, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Suresh Chand & Vernon Ning Hsu & Suresh Sethi, 2002. "Forecast, Solution, and Rolling Horizons in Operations Management Problems: A Classified Bibliography," Manufacturing & Service Operations Management, INFORMS, vol. 4(1), pages 25-43, September.
- Torpong Cheevaprawatdomrong & Irwin E. Schochetman & Robert L. Smith & Alfredo Garcia, 2007. "Solution and Forecast Horizons for Infinite-Horizon Nonhomogeneous Markov Decision Processes," Mathematics of Operations Research, INFORMS, vol. 32(1), pages 51-72, February.
- Kimms, Alf, 1996. "Improved lower bounds for the proportional lot sizing and scheduling problem," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 414, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Drexl, Andreas & Haase, Knut, 1997. "Vorbeugende Instandhaltung und Eilaufträge in der Produktionsplanung," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 450, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Hoesel C.P.M. van & Wagelmans A.P.M., 1997. "Fully polynomial approximation schemes for single-item capacitated economic lot-sizing problems," Research Memorandum 014, Maastricht University, Maastricht Research School of Economics of Technology and Organization (METEOR).
- Vladimir Krasik & Joseph Leung & Michael Pinedo & Jiawei Zhang, 2008. "Scheduling multiple products on parallel machines with setup costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(7), pages 654-669, October.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:91:y:1996:i:3:p:456-470. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.