IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v83y1995i2p320-329.html
   My bibliography  Save this article

Scheduling jobs within time windows on identical parallel machines: New model and algorithms

Author

Listed:
  • Gabrel, Virginie

Abstract

No abstract is available for this item.

Suggested Citation

  • Gabrel, Virginie, 1995. "Scheduling jobs within time windows on identical parallel machines: New model and algorithms," European Journal of Operational Research, Elsevier, vol. 83(2), pages 320-329, June.
  • Handle: RePEc:eee:ejores:v:83:y:1995:i:2:p:320-329
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/0377-2217(95)00010-N
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Jansen, Klaus, 1994. "An approximation algorithm for the license and shift class design problem," European Journal of Operational Research, Elsevier, vol. 73(1), pages 127-131, February.
    2. V. R. Dondeti & Hamilton Emmons, 1992. "Fixed Job Scheduling with Two Types of Processors," Operations Research, INFORMS, vol. 40(1-supplem), pages 76-85, February.
    3. Kolen, Antoon W. J. & Kroon, Leo G., 1993. "On the computational complexity of (maximum) shift class scheduling," European Journal of Operational Research, Elsevier, vol. 64(1), pages 138-151, January.
    4. Cheng, T. C. E. & Sin, C. C. S., 1990. "A state-of-the-art review of parallel-machine scheduling research," European Journal of Operational Research, Elsevier, vol. 47(3), pages 271-292, August.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Antoon W.J. Kolen & Jan Karel Lenstra & Christos H. Papadimitriou & Frits C.R. Spieksma, 2007. "Interval scheduling: A survey," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(5), pages 530-543, August.
    2. W L Pearn & S H Chung & M H Yang & Y H Chen, 2004. "Algorithms for the wafer probing scheduling problem with sequence-dependent set-up time and due date restrictions," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(11), pages 1194-1207, November.
    3. Jonathan F. Bard & Siwate Rojanasoonthon, 2006. "A branch‐and‐price algorithm for parallel machine scheduling with time windows and job priorities," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(1), pages 24-44, February.
    4. Vladimir Krasik & Joseph Leung & Michael Pinedo & Jiawei Zhang, 2008. "Scheduling multiple products on parallel machines with setup costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(7), pages 654-669, October.
    5. Siwate Rojanasoonthon & Jonathan Bard, 2005. "A GRASP for Parallel Machine Scheduling with Time Windows," INFORMS Journal on Computing, INFORMS, vol. 17(1), pages 32-51, February.
    6. Yu Fu & Amarnath Banerjee, 2020. "Heuristic/meta-heuristic methods for restricted bin packing problem," Journal of Heuristics, Springer, vol. 26(5), pages 637-662, October.
    7. Crevits, Igor & Debernard, Serge & Denecker, Pascal, 2002. "Model building for air-traffic controllers' workload regulation," European Journal of Operational Research, Elsevier, vol. 136(2), pages 324-332, January.
    8. S Rojanasoonthon & J F Bard & S D Reddy, 2003. "Algorithms for parallel machine scheduling: a case study of the tracking and data relay satellite system," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(8), pages 806-821, August.
    9. Kovalyov, Mikhail Y. & Ng, C.T. & Cheng, T.C. Edwin, 2007. "Fixed interval scheduling: Models, applications, computational complexity and algorithms," European Journal of Operational Research, Elsevier, vol. 178(2), pages 331-342, April.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Antoon W.J. Kolen & Jan Karel Lenstra & Christos H. Papadimitriou & Frits C.R. Spieksma, 2007. "Interval scheduling: A survey," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(5), pages 530-543, August.
    2. Siwate Rojanasoonthon & Jonathan Bard, 2005. "A GRASP for Parallel Machine Scheduling with Time Windows," INFORMS Journal on Computing, INFORMS, vol. 17(1), pages 32-51, February.
    3. Kroon, Leo G. & Edwin Romeijn, H. & Zwaneveld, Peter J., 1997. "Routing trains through railway stations: complexity issues," European Journal of Operational Research, Elsevier, vol. 98(3), pages 485-498, May.
    4. Yalaoui, F. & Chu, C., 2006. "New exact method to solve the Pm/rj/[summation operator]Cj schedule problem," International Journal of Production Economics, Elsevier, vol. 100(1), pages 168-179, March.
    5. Lin, Hung-Tso & Liao, Ching-Jong, 2003. "A case study in a two-stage hybrid flow shop with setup time and dedicated machines," International Journal of Production Economics, Elsevier, vol. 86(2), pages 133-143, November.
    6. Biber Nurit & Mor Baruch & Schlissel Yitzhak & Shapira Dana, 2023. "Lot scheduling involving completion time problems on identical parallel machines," Operational Research, Springer, vol. 23(1), pages 1-29, March.
    7. George L. Vairaktarakis, 2003. "The Value of Resource Flexibility in the Resource-Constrained Job Assignment Problem," Management Science, INFORMS, vol. 49(6), pages 718-732, June.
    8. Anurag Agarwal & Varghese S. Jacob & Hasan Pirkul, 2006. "An Improved Augmented Neural-Network Approach for Scheduling Problems," INFORMS Journal on Computing, INFORMS, vol. 18(1), pages 119-128, February.
    9. Kloster, Konstantin & Moeini, Mahdi & Vigo, Daniele & Wendt, Oliver, 2023. "The multiple traveling salesman problem in presence of drone- and robot-supported packet stations," European Journal of Operational Research, Elsevier, vol. 305(2), pages 630-643.
    10. Borgonjon, Tessa & Maenhout, Broos, 2022. "An exact approach for the personnel task rescheduling problem with task retiming," European Journal of Operational Research, Elsevier, vol. 296(2), pages 465-484.
    11. Lee, Soonhui & Turner, Jonathan & Daskin, Mark S. & Homem-de-Mello, Tito & Smilowitz, Karen, 2012. "Improving fleet utilization for carriers by interval scheduling," European Journal of Operational Research, Elsevier, vol. 218(1), pages 261-269.
    12. Henrich, Peter & Land, Martin & Gaalman, Gerard, 2006. "Grouping machines for effective workload control," International Journal of Production Economics, Elsevier, vol. 104(1), pages 125-142, November.
    13. Jun-Ho Lee & Hyun-Jung Kim, 2021. "A heuristic algorithm for identical parallel machine scheduling: splitting jobs, sequence-dependent setup times, and limited setup operators," Flexible Services and Manufacturing Journal, Springer, vol. 33(4), pages 992-1026, December.
    14. D Biskup & M Feldmann, 2006. "Lot streaming with variable sublots: an integer programming formulation," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(3), pages 296-303, March.
    15. Shi, Yuhui & Reich, Daniel & Epelman, Marina & Klampfl, Erica & Cohn, Amy, 2017. "An analytical approach to prototype vehicle test scheduling," Omega, Elsevier, vol. 67(C), pages 168-176.
    16. Lagodimos, A. G. & Leopoulos, V., 2000. "Greedy heuristic algorithms for manpower shift planning," International Journal of Production Economics, Elsevier, vol. 68(1), pages 95-106, October.
    17. Wang, Haibo & Alidaee, Bahram, 2019. "Effective heuristic for large-scale unrelated parallel machines scheduling problems," Omega, Elsevier, vol. 83(C), pages 261-274.
    18. Zhang, Mingyuan & Yang, Xiangjie & Zhang, Juan & Li, Gang, 2022. "Post-earthquake resilience optimization of a rural “road-bridge†transportation network system," Reliability Engineering and System Safety, Elsevier, vol. 225(C).
    19. Li, Zhaolong & Jin, Chun & Hu, Pan & Wang, Cong, 2019. "Resilience-based transportation network recovery strategy during emergency recovery phase under uncertainty," Reliability Engineering and System Safety, Elsevier, vol. 188(C), pages 503-514.
    20. Lagodimos, A. G. & Mihiotis, A. N. & Kosmidis, V. C., 2004. "Scheduling a multi-stage fabrication shop for efficient subsequent assembly operations," International Journal of Production Economics, Elsevier, vol. 90(3), pages 345-359, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:83:y:1995:i:2:p:320-329. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.