Scheduling to minimize the total resource consumption with a constraint on the sum of completion times
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Janiak, Adam, 1991. "Single machine scheduling problem with a common deadline and resource dependent release dates," European Journal of Operational Research, Elsevier, vol. 53(3), pages 317-325, August.
- Michael R. Garey & Robert E. Tarjan & Gordon T. Wilfong, 1988. "One-Processor Scheduling with Symmetric Earliness and Tardiness Penalties," Mathematics of Operations Research, INFORMS, vol. 13(2), pages 330-348, May.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Chase Rainwater & Joseph Geunes & H. Edwin Romeijn, 2014. "Resource-Constrained Assignment Problems with Shared Resource Consumption and Flexible Demand," INFORMS Journal on Computing, INFORMS, vol. 26(2), pages 290-302, May.
- Ventura, Jose A. & Kim, Daecheol & Garriga, Frederic, 2002. "Single machine earliness-tardiness scheduling with resource-dependent release dates," European Journal of Operational Research, Elsevier, vol. 142(1), pages 52-69, October.
- Cheng, T.C. Edwin & Kovalyov, Mikhail Y. & Shakhlevich, Natalia V., 2006. "Scheduling with controllable release dates and processing times: Makespan minimization," European Journal of Operational Research, Elsevier, vol. 175(2), pages 751-768, December.
- Vasilev, Stanislav H. & Foote, Bob L., 1997. "On minimizing resource consumption with constraints on the makespan and the total completion time," European Journal of Operational Research, Elsevier, vol. 96(3), pages 612-621, February.
- Cheng, T.C. Edwin & Kovalyov, Mikhail Y. & Shakhlevich, Natalia V., 2006. "Scheduling with controllable release dates and processing times: Total completion time minimization," European Journal of Operational Research, Elsevier, vol. 175(2), pages 769-781, December.
- Chung‐Lun Li & Edward C. Sewell & T. C. E. Cheng, 1995. "Scheduling to minimize release‐time resource consumption and tardiness penalties," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(6), pages 949-966, September.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Ventura, Jose A. & Kim, Daecheol & Garriga, Frederic, 2002. "Single machine earliness-tardiness scheduling with resource-dependent release dates," European Journal of Operational Research, Elsevier, vol. 142(1), pages 52-69, October.
- Cheng, T. C. Edwin & Janiak, Adam & Kovalyov, Mikhail Y., 2001. "Single machine batch scheduling with resource dependent setup and processing times," European Journal of Operational Research, Elsevier, vol. 135(1), pages 177-183, November.
- Kate, H.A. ten & Wijngaard, J. & Zijm, W.H.M., 1995. "Minimizing weighted total earliness, total tardiness and setup costs," Research Report 95A37, University of Groningen, Research Institute SOM (Systems, Organisations and Management).
- Baptiste, Philippe & Sadykov, Ruslan, 2010. "Time-indexed formulations for scheduling chains on a single machine: An application to airborne radars," European Journal of Operational Research, Elsevier, vol. 203(2), pages 476-483, June.
- Ventura, Jose A. & Radhakrishnan, Sanjay, 2003. "Single machine scheduling with symmetric earliness and tardiness penalties," European Journal of Operational Research, Elsevier, vol. 144(3), pages 598-612, February.
- Azeddine Cheref & Alessandro Agnetis & Christian Artigues & Jean-Charles Billaut, 2017. "Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence," Journal of Scheduling, Springer, vol. 20(6), pages 681-693, December.
- Kolahan, F. & Liang, M., 1998. "An adaptive TS approach to JIT sequencing with variable processing times and sequence-dependent setups," European Journal of Operational Research, Elsevier, vol. 109(1), pages 142-159, August.
- Chung‐Lun Li & Edward C. Sewell & T. C. E. Cheng, 1995. "Scheduling to minimize release‐time resource consumption and tardiness penalties," Naval Research Logistics (NRL), John Wiley & Sons, vol. 42(6), pages 949-966, September.
- Koulamas, Christos, 1996. "Single-machine scheduling with time windows and earliness/tardiness penalties," European Journal of Operational Research, Elsevier, vol. 91(1), pages 190-202, May.
- Dvir Shabtay & Moshe Kaspi, 2006. "Minimizing the makespan in open‐shop scheduling problems with a convex resource consumption function," Naval Research Logistics (NRL), John Wiley & Sons, vol. 53(3), pages 204-216, April.
- Kyung Sung Jung & Milind Dawande & H. Neil Geismar & V. Daniel R. Guide & Chelliah Sriskandarajah, 2016. "Supply planning models for a remanufacturer under just-in-time manufacturing environment with reverse logistics," Annals of Operations Research, Springer, vol. 240(2), pages 533-581, May.
- Kerem Bülbül & Safia Kedad-Sidhoum & Halil Şen, 2019. "Single-machine common due date total earliness/tardiness scheduling with machine unavailability," Journal of Scheduling, Springer, vol. 22(5), pages 543-565, October.
- Joaquín Bautista & Ramon Companys & Albert Corominas, 1997. "Modelling and solving the production rate variation problem (PRVP)," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 5(2), pages 221-239, December.
- Mosheiov, Gur & Shadmon, Michal, 2001. "Minmax earliness-tardiness costs with unit processing time jobs," European Journal of Operational Research, Elsevier, vol. 130(3), pages 638-652, May.
- Sourd, Francis, 2005. "Punctuality and idleness in just-in-time scheduling," European Journal of Operational Research, Elsevier, vol. 167(3), pages 739-751, December.
- Hendel, Yann & Sourd, Francis, 2006. "Efficient neighborhood search for the one-machine earliness-tardiness scheduling problem," European Journal of Operational Research, Elsevier, vol. 173(1), pages 108-119, August.
- Simon Thevenin & Nicolas Zufferey & Marino Widmer, 2016. "Order acceptance and scheduling with earliness and tardiness penalties," Journal of Heuristics, Springer, vol. 22(6), pages 849-890, December.
- Zhi-Long Chen, 1997. "Scheduling with batch setup times and earliness-tardiness penalties," European Journal of Operational Research, Elsevier, vol. 96(3), pages 518-537, February.
- Chung‐Lun Li, 1994. "Scheduling with resource‐dependent release dates—a comparison of two different resource consumption functions," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(6), pages 807-819, October.
- Jaw‐Yeh Chen & Sheng‐Fuu Lin, 2002. "Minimizing weighted earliness and tardiness penalties in single‐machine scheduling with idle time permitted," Naval Research Logistics (NRL), John Wiley & Sons, vol. 49(8), pages 760-780, December.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:80:y:1995:i:2:p:381-388. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.