Note on “Heuristics with guaranteed performance bounds for a manufacturing system with product recovery”
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ejor.2014.09.061
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Schulz, Tobias & Voigt, Guido, 2014. "A flexibly structured lot sizing heuristic for a static remanufacturing system," Omega, Elsevier, vol. 44(C), pages 21-31.
- Feng, Yan & Viswanathan, S., 2014. "Heuristics with guaranteed performance bounds for a manufacturing system with product recovery," European Journal of Operational Research, Elsevier, vol. 232(2), pages 322-329.
- Choi, Dae-Won & Hwang, Hark & Koh, Shie-Gheun, 2007. "A generalized ordering and recovery policy for reusable items," European Journal of Operational Research, Elsevier, vol. 182(2), pages 764-774, October.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Feng Tao & Tijun Fan & Xuefeng Jia & Kin Keung Lai, 2021. "Optimal production strategy for a manufacturing and remanufacturing system with return policy," Operational Research, Springer, vol. 21(1), pages 251-271, March.
- Hariga, Moncer & As’ad, Rami & Khan, Zeinab, 2017. "Manufacturing-remanufacturing policies for a centralized two stage supply chain under consignment stock partnership," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 362-374.
- Kozlovskaya, Nadezhda & Pakhomova, Nadezhda & Richter, Knut, 2015. "Complete solution of the extended EOQ repair and waste disposal model with switching costs," Discussion Papers 376, European University Viadrina Frankfurt (Oder), Department of Business Administration and Economics.
- Kozlovskaya, Nadezhda & Pakhomova, Nadezhda & Richter, Knut, 2016. "A general production and recovery EOQ model with stationary demand and return rates," Discussion Papers 378, European University Viadrina Frankfurt (Oder), Department of Business Administration and Economics.
- Hong Sun & Yan Li, 2023. "Optimal Acquisition and Production Policies for Remanufacturing with Quality Grading," Mathematics, MDPI, vol. 11(7), pages 1-21, March.
- Soumita Kundu & Tripti Chakrabarti & Dipak Kumar Jana, 2014. "Optimal Manufacturing-Remanufacturing Production Policy for a Closed-Loop Supply Chain under Fill Rate and Budget Constraint in Bifuzzy Environments," International Journal of Mathematics and Mathematical Sciences, Hindawi, vol. 2014, pages 1-14, June.
- Meherishi, Lavanya & Narayana, Sushmita A. & Ranjani, K.S., 2021. "Integrated product and packaging decisions with secondary packaging returns and protective packaging management," European Journal of Operational Research, Elsevier, vol. 292(3), pages 930-952.
- Kumar Jena, Sarat & Sarmah, S.P, 2014. "Price competition and co-operation in a duopoly closed-loop supply chain," International Journal of Production Economics, Elsevier, vol. 156(C), pages 346-360.
- Omar, Mohd & Yeo, Ivan, 2014. "A production–repair inventory model with time-varying demand and multiple setups," International Journal of Production Economics, Elsevier, vol. 155(C), pages 398-405.
- Shi, Jianmai & Zhang, Guoqing & Sha, Jichang, 2011. "Optimal production and pricing policy for a closed loop system," Resources, Conservation & Recycling, Elsevier, vol. 55(6), pages 639-647.
- Konstantaras, I. & Skouri, K., 2010. "Lot sizing for a single product recovery system with variable setup numbers," European Journal of Operational Research, Elsevier, vol. 203(2), pages 326-335, June.
- Bimal Kumar Mawandiya & J. K. Jha & Jitesh J. Thakkar, 2020. "Optimal production-inventory policy for closed-loop supply chain with remanufacturing under random demand and return," Operational Research, Springer, vol. 20(3), pages 1623-1664, September.
- Mitra, Subrata, 2016. "Models to explore remanufacturing as a competitive strategy under duopoly," Omega, Elsevier, vol. 59(PB), pages 215-227.
- Pilar I. Vidal-Carreras & Jose P. Garcia-Sabater & Julio J. Garcia-Sabater, 2017. "A practical model for managing inventories with unknown costs and a budget constraint," International Journal of Production Research, Taylor & Francis Journals, vol. 55(1), pages 118-129, January.
- Deepak Singhal & Sarat Kumar Jena & Satyabrata Aich & Sushanta Tripathy & Hee-Cheol Kim, 2021. "Remanufacturing for Circular Economy: Understanding the Impact of Manufacturer’s Incentive under Price Competition," Sustainability, MDPI, vol. 13(21), pages 1-19, October.
- Hsieh, Chung-Chi & Lathifah, Artya, 2022. "Ordering and waste reuse decisions in a make-to-order system under demand uncertainty," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1290-1303.
- Meng, Kai & Cao, Ying & Peng, Xianghui & Prybutok, Victor & Gupta, Varun, 2020. "Demand-dependent recovery decision-making of a batch of products for sustainability," International Journal of Production Economics, Elsevier, vol. 224(C).
- Jonrinaldi, & Zhang, D.Z., 2013. "An integrated production and inventory model for a whole manufacturing supply chain involving reverse logistics with finite horizon period," Omega, Elsevier, vol. 41(3), pages 598-620.
- Jaber, Mohamad Y. & El Saadany, Ahmed M.A., 2009. "The production, remanufacture and waste disposal model with lost sales," International Journal of Production Economics, Elsevier, vol. 120(1), pages 115-124, July.
- Ferrer, Geraldo & Swaminathan, Jayashankar M., 2010. "Managing new and differentiated remanufactured products," European Journal of Operational Research, Elsevier, vol. 203(2), pages 370-379, June.
More about this item
Keywords
Inventory; Remanufacturing; Product returns; Lot sizing and scheduling; Performance bounds;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:241:y:2015:i:2:p:575-578. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.