Controlling for supplier switching in the presence of real options and asymmetric information
Author
Abstract
Suggested Citation
DOI: 10.1016/j.ejor.2012.07.018
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- McIvor, Ronan, 2008. "What is the right outsourcing strategy for your process," European Management Journal, Elsevier, vol. 26(1), pages 24-34, February.
- Ernst, Ricardo & Kamrad, Bardia & Ord, Keith, 2007. "Delivery performance in vendor selection decisions," European Journal of Operational Research, Elsevier, vol. 176(1), pages 534-541, January.
- Antle, Rick & Bogetoft, Peter & Stark, Andrew W., 2001.
"Information systems, incentives and the timing of investments,"
Journal of Accounting and Public Policy, Elsevier, vol. 20(4-5), pages 267-294.
- Antle, Rick & Bogetoft, Peter & Stark, Andrew W., 2000. "Information Systems, Incentives and the Timing of Investment," Unit of Economics Working Papers 24201, Royal Veterinary and Agricultural University, Food and Resource Economic Institute.
- Avinash K. Dixit & Robert S. Pindyck, 1994. "Investment under Uncertainty," Economics Books, Princeton University Press, edition 1, number 5474.
- Weber, Charles A. & Current, John R. & Benton, W. C., 1991. "Vendor selection criteria and methods," European Journal of Operational Research, Elsevier, vol. 50(1), pages 2-18, January.
- Frascatore, Mark R. & Mahmoodi, Farzad, 2008. "Long-term and penalty contracts in a two-stage supply chain with stochastic demand," European Journal of Operational Research, Elsevier, vol. 184(1), pages 147-156, January.
- Grenadier, Steven R. & Wang, Neng, 2005.
"Investment timing, agency, and information,"
Journal of Financial Economics, Elsevier, vol. 75(3), pages 493-533, March.
- Steven R. Grenadier & Neng Wang, 2005. "Investment Timing, Agency, and Information," NBER Working Papers 11148, National Bureau of Economic Research, Inc.
- Pfeiffer, Thomas, 2010. "A dynamic model of supplier switching," European Journal of Operational Research, Elsevier, vol. 207(2), pages 697-710, December.
- Wu, D. J. & Kleindorfer, P. R. & Zhang, Jin E., 2002. "Optimal bidding and contracting strategies for capital-intensive goods," European Journal of Operational Research, Elsevier, vol. 137(3), pages 657-676, March.
- Stanley Baiman & Paul E. Fischer & Madhav V. Rajan, 2000. "Information, Contracting, and Quality Costs," Management Science, INFORMS, vol. 46(6), pages 776-789, June.
- Zhao, Yingxue & Wang, Shouyang & Cheng, T.C.E. & Yang, Xiaoqi & Huang, Zhimin, 2010. "Coordination of supply chains by option contracts: A cooperative game theory approach," European Journal of Operational Research, Elsevier, vol. 207(2), pages 668-675, December.
- Wei Shi Lim, 2001. "Producer-Supplier Contracts with Incomplete Information," Management Science, INFORMS, vol. 47(5), pages 709-715, May.
- Terry A. Taylor, 2006. "Sale Timing in a Supply Chain: When to Sell to the Retailer," Manufacturing & Service Operations Management, INFORMS, vol. 8(1), pages 23-42, November.
- Özalp Özer & Wei Wei, 2006. "Strategic Commitments for an Optimal Capacity Decision Under Asymmetric Forecast Information," Management Science, INFORMS, vol. 52(8), pages 1238-1257, August.
- Myerson, Roger B, 1979.
"Incentive Compatibility and the Bargaining Problem,"
Econometrica, Econometric Society, vol. 47(1), pages 61-73, January.
- Roger B. Myerson, 1977. "Incentive Compatability and the Bargaining Problem," Discussion Papers 284, Northwestern University, Center for Mathematical Studies in Economics and Management Science.
- Charles J. Corbett & Deming Zhou & Christopher S. Tang, 2004. "Designing Supply Contracts: Contract Type and Information Asymmetry," Management Science, INFORMS, vol. 50(4), pages 550-559, April.
- Ho, William & Xu, Xiaowei & Dey, Prasanta K., 2010. "Multi-criteria decision making approaches for supplier evaluation and selection: A literature review," European Journal of Operational Research, Elsevier, vol. 202(1), pages 16-24, April.
- Arya, Anil & Mittendorf, Brian, 2010. "Input Markets and the Strategic Organization of the Firm," Foundations and Trends(R) in Accounting, now publishers, vol. 5(1), pages 1-97, December.
- Charles J. Corbett & Xavier de Groote, 2000. "A Supplier's Optimal Quantity Discount Policy Under Asymmetric Information," Management Science, INFORMS, vol. 46(3), pages 444-450, March.
- Rick Antle & Peter Bogetoft & Andrew W. Stark, 2007.
"Incentive Problems and Investment Timing Options,"
Springer Books, in: Rick Antle & Frøystein Gjesdal & Pierre Jinghong Liang (ed.), Essays in Accounting Theory in Honour of Joel S. Demski, chapter 0, pages 145-168,
Springer.
- Antle, Rick & Bogetoft, Peter & Stark, Andrew W., 2001. "Incentive Problems and Investment Timing Options," Unit of Economics Working Papers 24192, Royal Veterinary and Agricultural University, Food and Resource Economic Institute.
- Z. Degraeve & Eva Labro & F. Roodhooft, 2005. "Constructing a Total Cost of Ownership supplier selection methodology based on Activity-Based Costing and mathematical programming," Accounting and Business Research, Taylor & Francis Journals, vol. 35(1), pages 3-27.
- Anil Arya & Jonathan Glover, 2001. "Option Value to Waiting Created by a Control Problem," Journal of Accounting Research, Wiley Blackwell, vol. 39(3), pages 405-415, December.
- Degraeve, Zeger & Labro, Eva & Roodhooft, Filip, 2000. "An evaluation of vendor selection models from a total cost of ownership perspective," European Journal of Operational Research, Elsevier, vol. 125(1), pages 34-58, August.
- Wagner, Stephan M. & Friedl, Gunther, 2007. "Supplier switching decisions," European Journal of Operational Research, Elsevier, vol. 183(2), pages 700-717, December.
- Lin, Zhibing & Cai, Chen & Xu, Baoguang, 2010. "Supply chain coordination with insurance contract," European Journal of Operational Research, Elsevier, vol. 205(2), pages 339-345, September.
- Ozer, Ozalp & Uncu, Onur & Wei, Wei, 2007. "Selling to the "Newsvendor" with a forecast update: Analysis of a dual purchase contract," European Journal of Operational Research, Elsevier, vol. 182(3), pages 1150-1176, November.
- Thomas Pfeiffer & Georg Schneider, 2007. "Residual Income-Based Compensation Plans for Controlling Investment Decisions Under Sequential Private Information," Management Science, INFORMS, vol. 53(3), pages 495-507, March.
- Gérard P. Cachon & Martin A. Lariviere, 2005. "Supply Chain Coordination with Revenue-Sharing Contracts: Strengths and Limitations," Management Science, INFORMS, vol. 51(1), pages 30-44, January.
- Li, Shanling & Murat, Alper & Huang, Wanzhen, 2009. "Selection of contract suppliers under price and demand uncertainty in a dynamic market," European Journal of Operational Research, Elsevier, vol. 198(3), pages 830-847, November.
- Joel S. Demski & David E.M. Sappington & Pablo T. Spiller, 1987. "Managing Supplier Switching," RAND Journal of Economics, The RAND Corporation, vol. 18(1), pages 77-97, Spring.
- Corbett, Charles J. & DeCroix, Gregory A. & Ha, Albert Y., 2005. "Optimal shared-savings contracts in supply chains: Linear contracts and double moral hazard," European Journal of Operational Research, Elsevier, vol. 163(3), pages 653-667, June.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Charalambides, Marios & Koussis, Nicos, 2018. "A stochastic model with interacting managerial operating options and debt rescheduling," European Journal of Operational Research, Elsevier, vol. 267(1), pages 236-249.
- Zhang, Jianxiong & Tang, Wansheng & Hu, Mingmao, 2015. "Optimal supplier switching with volume-dependent switching costs," International Journal of Production Economics, Elsevier, vol. 161(C), pages 96-104.
- Singham, D.I., 2019. "Sample average approximation for the continuous type principal-agent problem," European Journal of Operational Research, Elsevier, vol. 275(3), pages 1050-1057.
- Zhou, Jianheng & Luo, Yao, 2023. "Bayes information updating and multiperiod supply chain screening," International Journal of Production Economics, Elsevier, vol. 256(C).
- Matsui, Kenji, 2019. "A supply chain member should set its margin later if another member's cost is highly uncertain," European Journal of Operational Research, Elsevier, vol. 275(1), pages 127-138.
- Trigeorgis, Lenos & Tsekrekos, Andrianos E., 2018. "Real Options in Operations Research: A Review," European Journal of Operational Research, Elsevier, vol. 270(1), pages 1-24.
- Tsekrekos, Andrianos E. & Yannacopoulos, Athanasios N., 2016. "Optimal switching decisions under stochastic volatility with fast mean reversion," European Journal of Operational Research, Elsevier, vol. 251(1), pages 148-157.
- Di Corato, Luca & Dosi, Cesare & Moretto, Michele, 2018. "Multidimensional auctions for long-term procurement contracts with early-exit options: The case of conservation contracts," European Journal of Operational Research, Elsevier, vol. 267(1), pages 368-380.
- Zhou, Jianheng & Zhao, Ruijuan & Wang, Weishen, 2019. "Pricing decision of a manufacturer in a dual-channel supply chain with asymmetric information," European Journal of Operational Research, Elsevier, vol. 278(3), pages 809-820.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Clemens Löffler & Thomas Pfeiffer & Georg Schneider, 2013. "The irreversibility effect and agency conflicts," Theory and Decision, Springer, vol. 74(2), pages 219-239, February.
- Li, Ying & Gupta, Sudheer, 2011. "Strategic capability investments and competition for supply contracts," European Journal of Operational Research, Elsevier, vol. 214(2), pages 273-283, October.
- Ruina Yang & Lijun Ma, 2017. "Two-part tariff contracting with competing unreliable suppliers in a supply chain under asymmetric information," Annals of Operations Research, Springer, vol. 257(1), pages 559-585, October.
- Pfeiffer, Thomas, 2010. "A dynamic model of supplier switching," European Journal of Operational Research, Elsevier, vol. 207(2), pages 697-710, December.
- Nicole Bastian Johnson & Thomas Pfeiffer & Georg Schneider, 2013. "Multistage Capital Budgeting for Shared Investments," Management Science, INFORMS, vol. 59(5), pages 1213-1228, May.
- Wagner, Stephan M. & Friedl, Gunther, 2007. "Supplier switching decisions," European Journal of Operational Research, Elsevier, vol. 183(2), pages 700-717, December.
- Gérard P. Cachon & Fuqiang Zhang, 2006. "Procuring Fast Delivery: Sole Sourcing with Information Asymmetry," Management Science, INFORMS, vol. 52(6), pages 881-896, June.
- Murat Kaya & Özalp Özer, 2009. "Quality risk in outsourcing: Noncontractible product quality and private quality cost information," Naval Research Logistics (NRL), John Wiley & Sons, vol. 56(7), pages 669-685, October.
- Roemer, Nils & Müller, Sven & Voigt, Guido, 2023. "A choice-based optimization approach for contracting in supply chains," European Journal of Operational Research, Elsevier, vol. 305(1), pages 271-286.
- Mobini, Zahra & van den Heuvel, Wilco & Wagelmans, Albert, 2019.
"Designing multi-period supply contracts in a two-echelon supply chain with asymmetric information,"
European Journal of Operational Research, Elsevier, vol. 277(2), pages 542-560.
- Mobini, Z. & van den Heuvel, W. & Wagelmans, A.P.M., 2014. "Designing multi-period supply contracts in a two-echelon supply chain with asymmetric information," Econometric Institute Research Papers EI2014-28, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- David Martimort & Stéphane Straub, 2016.
"How To Design Infrastructure Contracts In A Warming World: A Critical Appraisal Of Public–Private Partnerships,"
International Economic Review, Department of Economics, University of Pennsylvania and Osaka University Institute of Social and Economic Research Association, vol. 57, pages 61-88, February.
- Martimort, David & Straub, Stéphane, 2012. "How to Design Infrastructure Contracts in a Warming World? A Critical Appraisal of Public-Private Partnerships," TSE Working Papers 12-315, Toulouse School of Economics (TSE).
- Martimort, David & Straub, Stéphane, 2012. "How to Design Infrastructure Contracts in a Warming World? A Critical Appraisal of Public-Private Partnerships," IDEI Working Papers 724, Institut d'Économie Industrielle (IDEI), Toulouse.
- David Martimort & Stephane Straub, 2016. "How to design infrastructure contracts in a warning world: a critical appraisal of public-private partnerships," PSE-Ecole d'économie de Paris (Postprint) halshs-01328640, HAL.
- David Martimort & Stephane Straub, 2016. "How to design infrastructure contracts in a warning world: a critical appraisal of public-private partnerships," Post-Print halshs-01328640, HAL.
- Haresh Gurnani & Murat Erkoc, 2008. "Supply contracts in manufacturer‐retailer interactions with manufacturer‐quality and retailer effort‐induced demand," Naval Research Logistics (NRL), John Wiley & Sons, vol. 55(3), pages 200-217, April.
- Avinadav, Tal & Chernonog, Tatyana & Fruchter, Gila E. & Prasad, Ashutosh, 2020. "Contract design when quality is co-created in a supply chain," European Journal of Operational Research, Elsevier, vol. 286(3), pages 908-918.
- Wu, Zhengping & Crama, Pascale & Zhu, Wanshan, 2012. "The newsvendor’s optimal incentive contracts for multiple advertisers," European Journal of Operational Research, Elsevier, vol. 220(1), pages 171-181.
- Sang-Hyun Kim & Serguei Netessine, 2013. "Collaborative Cost Reduction and Component Procurement Under Information Asymmetry," Management Science, INFORMS, vol. 59(1), pages 189-206, November.
- Zhibin (Ben) Yang & Göker Ayd{i}n & Volodymyr Babich & Damian R. Beil, 2009. "Supply Disruptions, Asymmetric Information, and a Backup Production Option," Management Science, INFORMS, vol. 55(2), pages 192-209, February.
- Thomas Pfeiffer & Georg Schneider, 2007. "Residual Income-Based Compensation Plans for Controlling Investment Decisions Under Sequential Private Information," Management Science, INFORMS, vol. 53(3), pages 495-507, March.
- Mingzhu Yu & Ruina Yang & Zelong Yi & Xuwen Cong, 2020. "Contracting in Ocean Shipping Market Under Asymmetric Information," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 37(02), pages 1-24, March.
- Yang, Fiona X. & Zhang, Rachel Q. & Zhu, Kaijie, 2017. "Should purchasing activities be outsourced along with production?," European Journal of Operational Research, Elsevier, vol. 257(2), pages 468-482.
- Lusheng Shao & Xiaole Wu & Fuqiang Zhang, 2020. "Sourcing Competition under Cost Uncertainty and Information Asymmetry," Production and Operations Management, Production and Operations Management Society, vol. 29(2), pages 447-461, February.
More about this item
Keywords
Supplier switching; Supply chain contracts; Information asymmetry; Real options;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:223:y:2012:i:3:p:690-700. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.