A two-stage fuzzy robust integer programming approach for capacity planning of environmental management systems
Author
Abstract
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Huang, Guo H. & Baetz, Brian W. & Patry, Gilles G., 1995. "Grey integer programming: An application to waste management planning under uncertainty," European Journal of Operational Research, Elsevier, vol. 83(3), pages 594-620, June.
- Huang, G. H. & Baetz, B. W. & Patry, G. G., 1995. "Grey fuzzy integer programming: An application to regional waste management planning under uncertainty," Socio-Economic Planning Sciences, Elsevier, vol. 29(1), pages 17-38, March.
- Vassiadou-Zeniou, Christiana & Zenios, Stavros A., 1996. "Robust optimization models for managing callable bond portfolios," European Journal of Operational Research, Elsevier, vol. 91(2), pages 264-273, June.
- Ruszczynski, Andrzej & Swietanowski, Artur, 1997. "Accelerating the regularized decomposition method for two stage stochastic linear problems," European Journal of Operational Research, Elsevier, vol. 101(2), pages 328-342, September.
- Kirca, Omer & Erkip, Nesim, 1988. "Selecting transfer station locations for large solid waste systems," European Journal of Operational Research, Elsevier, vol. 35(3), pages 339-349, June.
- Chang, Ni-Bin & Wang, S.F., 1997. "A fuzzy goal programming approach for the optimal planning of metropolitan solid waste management systems," European Journal of Operational Research, Elsevier, vol. 99(2), pages 303-321, June.
- John M. Mulvey & Robert J. Vanderbei & Stavros A. Zenios, 1995. "Robust Optimization of Large-Scale Systems," Operations Research, INFORMS, vol. 43(2), pages 264-281, April.
- A. Ben-Tal & A. Nemirovski, 1998. "Robust Convex Optimization," Mathematics of Operations Research, INFORMS, vol. 23(4), pages 769-805, November.
- Dawei Bai & Tamra Carpenter & John Mulvey, 1997. "Making a Case for Robust Optimization Models," Management Science, INFORMS, vol. 43(7), pages 895-907, July.
- Birge, John R. & Louveaux, Francois V., 1988. "A multicut algorithm for two-stage stochastic linear programs," European Journal of Operational Research, Elsevier, vol. 34(3), pages 384-392, March.
- Marian Leimbach, 1996. "Development of a Fuzzy optimization model, supporting global warming decision-making," Environmental & Resource Economics, Springer;European Association of Environmental and Resource Economists, vol. 7(2), pages 163-192, March.
- Chanas, Stefan & Zielinski, Pawel, 2000. "On the equivalence of two optimization methods for fuzzy linear programming problems," European Journal of Operational Research, Elsevier, vol. 121(1), pages 56-63, February.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Blossey, Gregor & Hahn, Gerd J. & Koberstein, Achim, 2022. "Planning pharmaceutical manufacturing networks in the light of uncertain production approval times," International Journal of Production Economics, Elsevier, vol. 244(C).
- Jin, S.W. & Li, Y.P. & Huang, G.H. & Nie, S., 2018. "Analyzing the performance of clean development mechanism for electric power systems under uncertain environment," Renewable Energy, Elsevier, vol. 123(C), pages 382-397.
- Xiong, Jie & Ng, Tsan Sheng Adam & Wang, Shuming, 2016. "An optimization model for economic feasibility analysis and design of decentralized waste-to-energy systems," Energy, Elsevier, vol. 101(C), pages 239-251.
- Li, Y.P. & Huang, G.H. & Guo, P. & Yang, Z.F. & Nie, S.L., 2010. "A dual-interval vertex analysis method and its application to environmental decision making under uncertainty," European Journal of Operational Research, Elsevier, vol. 200(2), pages 536-550, January.
- He, Zhou & Xiong, Jie & Ng, Tsan Sheng & Fan, Bo & Shoemaker, Christine A., 2017. "Managing competitive municipal solid waste treatment systems: An agent-based approach," European Journal of Operational Research, Elsevier, vol. 263(3), pages 1063-1077.
- Mavrotas, George & Gakis, Nikos & Skoulaxinou, Sotiria & Katsouros, Vassilis & Georgopoulou, Elena, 2015. "Municipal solid waste management and energy production: Consideration of external cost through multi-objective optimization and its effect on waste-to-energy solutions," Renewable and Sustainable Energy Reviews, Elsevier, vol. 51(C), pages 1205-1222.
- Kůdela, Jakub & Smejkalová, Veronika & Šomplák, Radovan & Nevrlý, Vlastimír, 2020. "Legislation-induced planning of waste processing infrastructure: A case study of the Czech Republic," Renewable and Sustainable Energy Reviews, Elsevier, vol. 132(C).
- Jie Xiong & Shuming Wang & Tsan Sheng Ng, 2021. "Robust Bilevel Resource Recovery Planning," Production and Operations Management, Production and Operations Management Society, vol. 30(9), pages 2962-2992, September.
- Dai, C. & Cai, Y.P. & Li, Y.P. & Sun, W. & Wang, X.W. & Guo, H.C., 2014. "Optimal strategies for carbon capture, utilization and storage based on an inexact mλ-measure fuzzy chance-constrained programming," Energy, Elsevier, vol. 78(C), pages 465-478.
- G Mitchell & J E Beasley, 2011. "Optimisation of sludge treatment and transport," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(6), pages 939-948, June.
- Kamalahmadi, Masoud & Parast, Mahour Mellat, 2017. "An assessment of supply chain disruption mitigation strategies," International Journal of Production Economics, Elsevier, vol. 184(C), pages 210-230.
- Huang, Shanshan & Suo, Cai & Guo, Junhong & Lv, Jing & Jing, Rui & Yu, Lei & Fan, Yurui & Ding, Yanming, 2023. "Balancing the water-energy dilemma in nexus system planning with bi-level and multi-uncertainty," Energy, Elsevier, vol. 278(C).
- A Paucar-Caceres & A Espinosa, 2011. "Management science methodologies in environmental management and sustainability: discourses and applications," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(9), pages 1601-1620, September.
- Tsai, Wen-Hsien & Yang, Chih-Hao & Chang, Jui-Chu & Lee, Hsiu-Li, 2014. "An Activity-Based Costing decision model for life cycle assessment in green building projects," European Journal of Operational Research, Elsevier, vol. 238(2), pages 607-619.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Li, Y.P. & Huang, G.H. & Nie, S.L. & Qin, X.S., 2007. "ITCLP: An inexact two-stage chance-constrained program for planning waste management systems," Resources, Conservation & Recycling, Elsevier, vol. 49(3), pages 284-307.
- Xu, Y. & Huang, G.H. & Qin, X.S. & Cao, M.F., 2009. "SRCCP: A stochastic robust chance-constrained programming model for municipal solid waste management under uncertainty," Resources, Conservation & Recycling, Elsevier, vol. 53(6), pages 352-363.
- Sun, Y. & Huang, G.H. & Li, Y.P., 2010. "ICQSWM: An inexact chance-constrained quadratic solid waste management model," Resources, Conservation & Recycling, Elsevier, vol. 54(10), pages 641-657.
- Maqsood, Imran & Huang, Guo H. & Scott Yeomans, Julian, 2005. "An interval-parameter fuzzy two-stage stochastic program for water resources management under uncertainty," European Journal of Operational Research, Elsevier, vol. 167(1), pages 208-225, November.
- ZhenFang Liu & GuoHe Huang, 2009. "Dual-Interval Two-Stage Optimization for Flood Management and Risk Analyses," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 23(11), pages 2141-2162, September.
- Piao, M.J. & Li, Y.P. & Huang, G.H. & Nie, S., 2015. "Risk analysis for Shanghai's electric power system under multiple uncertainties," Energy, Elsevier, vol. 87(C), pages 104-119.
- Lin, Q.G. & Huang, G.H. & Bass, B. & Qin, X.S., 2009. "IFTEM: An interval-fuzzy two-stage stochastic optimization model for regional energy systems planning under uncertainty," Energy Policy, Elsevier, vol. 37(3), pages 868-878, March.
- Cao, M.F. & Huang, G.H. & Lin, Q.G., 2010. "Integer programming with random-boundary intervals for planning municipal power systems," Applied Energy, Elsevier, vol. 87(8), pages 2506-2516, August.
- Zhou, Feng & Huang, Gordon H. & Chen, Guo-Xian & Guo, Huai-Cheng, 2009. "Enhanced-interval linear programming," European Journal of Operational Research, Elsevier, vol. 199(2), pages 323-333, December.
- Chen, C. & Li, Y.P. & Huang, G.H., 2016. "Interval-fuzzy municipal-scale energy model for identification of optimal strategies for energy management – A case study of Tianjin, China," Renewable Energy, Elsevier, vol. 86(C), pages 1161-1177.
- Zarrinpoor, Naeme & Fallahnezhad, Mohammad Saber & Pishvaee, Mir Saman, 2018. "The design of a reliable and robust hierarchical health service network using an accelerated Benders decomposition algorithm," European Journal of Operational Research, Elsevier, vol. 265(3), pages 1013-1032.
- Cai, Y.P. & Huang, G.H. & Yang, Z.F. & Lin, Q.G. & Tan, Q., 2009. "Community-scale renewable energy systems planning under uncertainty--An interval chance-constrained programming approach," Renewable and Sustainable Energy Reviews, Elsevier, vol. 13(4), pages 721-735, May.
- Chao Lu & Jie Tao & Qiuxian An & Xiaodong Lai, 2020. "A second-order cone programming based robust data envelopment analysis model for the new-energy vehicle industry," Annals of Operations Research, Springer, vol. 292(1), pages 321-339, September.
- David Rosenberg & Jay Lund, 2009. "Modeling Integrated Decisions for a Municipal Water System with Recourse and Uncertainties: Amman, Jordan," Water Resources Management: An International Journal, Published for the European Water Resources Association (EWRA), Springer;European Water Resources Association (EWRA), vol. 23(1), pages 85-115, January.
- Chen, W.T. & Li, Y.P. & Huang, G.H. & Chen, X. & Li, Y.F., 2010. "A two-stage inexact-stochastic programming model for planning carbon dioxide emission trading under uncertainty," Applied Energy, Elsevier, vol. 87(3), pages 1033-1047, March.
- Panos Xidonas & Ralph Steuer & Christis Hassapis, 2020. "Robust portfolio optimization: a categorized bibliographic review," Annals of Operations Research, Springer, vol. 292(1), pages 533-552, September.
- He, Li & Huang, Guo H. & Lu, Hongwei, 2011. "Bivariate interval semi-infinite programming with an application to environmental decision-making analysis," European Journal of Operational Research, Elsevier, vol. 211(3), pages 452-465, June.
- Li, Y.F. & Li, Y.P. & Huang, G.H. & Chen, X., 2010. "Energy and environmental systems planning under uncertainty--An inexact fuzzy-stochastic programming approach," Applied Energy, Elsevier, vol. 87(10), pages 3189-3211, October.
- Li, M.W. & Li, Y.P. & Huang, G.H., 2011. "An interval-fuzzy two-stage stochastic programming model for planning carbon dioxide trading under uncertainty," Energy, Elsevier, vol. 36(9), pages 5677-5689.
- Liu, Y. & Huang, G.H. & Cai, Y.P. & Cheng, G.H. & Niu, Y.T. & An, K., 2009. "Development of an inexact optimization model for coupled coal and power management in North China," Energy Policy, Elsevier, vol. 37(11), pages 4345-4363, November.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:189:y:2008:i:2:p:399-420. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.