IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v186y2008i3p931-952.html
   My bibliography  Save this article

Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed

Author

Listed:
  • Lee, Ik Sun
  • Sung, C.S.

Abstract

No abstract is available for this item.

Suggested Citation

  • Lee, Ik Sun & Sung, C.S., 2008. "Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed," European Journal of Operational Research, Elsevier, vol. 186(3), pages 931-952, May.
  • Handle: RePEc:eee:ejores:v:186:y:2008:i:3:p:931-952
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(07)00234-2
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Kolisch, Rainer, 2000. "Integration of assembly and fabrication for make-to-order production," Publications of Darmstadt Technical University, Institute for Business Studies (BWL) 335, Darmstadt Technical University, Department of Business Administration, Economics and Law, Institute for Business Studies (BWL).
    2. Kolisch, R., 2000. "Integration of assembly and fabrication for make-to-order production," International Journal of Production Economics, Elsevier, vol. 68(3), pages 287-306, December.
    3. Christos Koulamas, 1994. "The Total Tardiness Problem: Review and Extensions," Operations Research, INFORMS, vol. 42(6), pages 1025-1041, December.
    4. Gérard P. Cachon & Patrick T. Harker, 2002. "Competition and Outsourcing with Scale Economies," Management Science, INFORMS, vol. 48(10), pages 1314-1333, October.
    5. Kim, Bowon, 2003. "Dynamic outsourcing to contract manufacturers with different capabilities of reducing the supply cost," International Journal of Production Economics, Elsevier, vol. 86(1), pages 63-80, October.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Lee, Kangbok & Choi, Byung-Cheon, 2011. "Two-stage production scheduling with an outsourcing option," European Journal of Operational Research, Elsevier, vol. 213(3), pages 489-497, September.
    2. Choi, Byung-Cheon & Chung, Jibok, 2011. "Two-machine flow shop scheduling problem with an outsourcing option," European Journal of Operational Research, Elsevier, vol. 213(1), pages 66-72, August.
    3. Thürer, Matthias & Stevenson, Mark & Qu, Ting & Godinho Filho, Moacir, 2014. "The design of simple subcontracting rules for make-to-order shops: An assessment by simulation," European Journal of Operational Research, Elsevier, vol. 239(3), pages 854-864.
    4. Ou, Jinwen & Zhong, Xueling & Wang, Guoqing, 2015. "An improved heuristic for parallel machine scheduling with rejection," European Journal of Operational Research, Elsevier, vol. 241(3), pages 653-661.
    5. Jinwen Ou & Xueling Zhong, 2017. "Order acceptance and scheduling with consideration of service level," Annals of Operations Research, Springer, vol. 248(1), pages 429-447, January.
    6. Zhong, Xueling & Ou, Jinwen & Wang, Guoqing, 2014. "Order acceptance and scheduling with machine availability constraints," European Journal of Operational Research, Elsevier, vol. 232(3), pages 435-441.
    7. Zhong, Xueling & Fan, Jie & Ou, Jinwen, 2022. "Coordinated scheduling of the outsourcing, in-house production and distribution operations," European Journal of Operational Research, Elsevier, vol. 302(2), pages 427-437.
    8. Chung, Dae-Young & Choi, Byung-Cheon, 2013. "Outsourcing and scheduling for two-machine ordered flow shop scheduling problems," European Journal of Operational Research, Elsevier, vol. 226(1), pages 46-52.
    9. Lingfa Lu & Liqi Zhang & Jinwen Ou, 2021. "In-house production and outsourcing under different discount schemes on the total outsourcing cost," Annals of Operations Research, Springer, vol. 298(1), pages 361-374, March.
    10. Qi, Xiangtong, 2011. "Outsourcing and production scheduling for a two-stage flow shop," International Journal of Production Economics, Elsevier, vol. 129(1), pages 43-50, January.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Lee, Ik Sun & Sung, C.S., 2008. "Single machine scheduling with outsourcing allowed," International Journal of Production Economics, Elsevier, vol. 111(2), pages 623-634, February.
    2. Liang Tang & Zhihong Jin & Xuwei Qin & Ke Jing, 2019. "Supply chain scheduling in a collaborative manufacturing mode: model construction and algorithm design," Annals of Operations Research, Springer, vol. 275(2), pages 685-714, April.
    3. Sung, Chang Sup & Juhn, Jaeho, 2009. "Makespan minimization for a 2-stage assembly scheduling problem subject to component available time constraint," International Journal of Production Economics, Elsevier, vol. 119(2), pages 392-401, June.
    4. Li, Haitao & Womer, Keith, 2012. "Optimizing the supply chain configuration for make-to-order manufacturing," European Journal of Operational Research, Elsevier, vol. 221(1), pages 118-128.
    5. Schneeweiss, Christoph & Zimmer, Kirstin, 2004. "Hierarchical coordination mechanisms within the supply chain," European Journal of Operational Research, Elsevier, vol. 153(3), pages 687-703, March.
    6. Jain, Tarun & Hazra, Jishnu, 2017. "Dual sourcing under suppliers' capacity investments," International Journal of Production Economics, Elsevier, vol. 183(PA), pages 103-115.
    7. Wang, Li Ming & Liu, Li Wen & Wang, Yong Jie, 2007. "Capacity decisions and supply price games under flexibility of backward integration," International Journal of Production Economics, Elsevier, vol. 110(1-2), pages 85-96, October.
    8. de Kruijff, Joost T. & Hurkens, Cor A.J. & de Kok, Ton G., 2018. "Integer programming models for mid-term production planning for high-tech low-volume supply chains," European Journal of Operational Research, Elsevier, vol. 269(3), pages 984-997.
    9. Zorzini, M. & Corti, D. & Pozzetti, A., 2008. "Due date (DD) quotation and capacity planning in make-to-order companies: Results from an empirical analysis," International Journal of Production Economics, Elsevier, vol. 112(2), pages 919-933, April.
    10. Sawik, Tadeusz, 2009. "Coordinated supply chain scheduling," International Journal of Production Economics, Elsevier, vol. 120(2), pages 437-451, August.
    11. Pamela C. Nolz, 2021. "Optimizing construction schedules and material deliveries in city logistics: a case study from the building industry," Flexible Services and Manufacturing Journal, Springer, vol. 33(3), pages 846-878, September.
    12. Han, Chaodong & Porterfield, Tobin & Li, Xiaolin, 2012. "Impact of industry competition on contract manufacturing: An empirical study of U.S. manufacturers," International Journal of Production Economics, Elsevier, vol. 138(1), pages 159-169.
    13. Hsieh, Chung-Chi & Wu, Cheng-Han, 2008. "Capacity allocation, ordering, and pricing decisions in a supply chain with demand and supply uncertainties," European Journal of Operational Research, Elsevier, vol. 184(2), pages 667-684, January.
    14. Skintzi, Georgia & Ioannou, George & Prastacos, Gregory, 2008. "Investigating warehousing policies," International Journal of Production Economics, Elsevier, vol. 112(2), pages 955-970, April.
    15. Sawik, Tadeusz, 2007. "A lexicographic approach to bi-objective scheduling of single-period orders in make-to-order manufacturing," European Journal of Operational Research, Elsevier, vol. 180(3), pages 1060-1075, August.
    16. Dongyuan Zhan & Amy R. Ward, 2019. "Staffing, Routing, and Payment to Trade off Speed and Quality in Large Service Systems," Operations Research, INFORMS, vol. 67(6), pages 1738-1751, November.
    17. Hafezalkotob, Ashkan, 2017. "Competition of domestic manufacturer and foreign supplier under sustainable development objectives of government," Applied Mathematics and Computation, Elsevier, vol. 292(C), pages 294-308.
    18. Zhao, Na, 2019. "Managing interactive collaborative mega project supply chains under infectious risks," International Journal of Production Economics, Elsevier, vol. 218(C), pages 275-286.
    19. Alidaee, Bahram & Kochenberger, Gary A. & Amini, Mohammad M., 2001. "Greedy solutions of selection and ordering problems," European Journal of Operational Research, Elsevier, vol. 134(1), pages 203-215, October.
    20. Ullrich, Christian A., 2013. "Integrated machine scheduling and vehicle routing with time windows," European Journal of Operational Research, Elsevier, vol. 227(1), pages 152-165.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:186:y:2008:i:3:p:931-952. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.