Improved Heuristics for Multi-Stage Requirements Planning Systems

Author

Listed:
  • Joseph D. Blackburn

    (Vanderbilt University)

  • Robert A. Millen

    (Northeastern University)

Abstract

Most of the recent studies of heuristic lot-sizing techniques for multi-stage material requirements planning systems have investigated the problem in the context of a single stage. In this paper, the multi-stage problem is first modeled analytically to indicate the potential errors inherent in the commonly proposed single-pass, stage-by-stage approaches (e.g., Wagner-Whitin). Then, based on this analysis, several simple cost modifications are suggested to improve the global optimality of these procedures. The effectiveness of these alternative modifications is tested through a series of simulation experiments. It is concluded that some of these modifications consistently improve the performance of the stage-by-stage approaches.

Suggested Citation

  • Joseph D. Blackburn & Robert A. Millen, 1982. "Improved Heuristics for Multi-Stage Requirements Planning Systems," Management Science, INFORMS, vol. 28(1), pages 44-56, January.
  • Handle: RePEc:inm:ormnsc:v:28:y:1982:i:1:p:44-56
    DOI: 10.1287/mnsc.28.1.44
    as

    Download full text from publisher

    File URL: http://dx.doi.org/10.1287/mnsc.28.1.44
    Download Restriction: no

    File URL: https://libkey.io/10.1287/mnsc.28.1.44?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Dellaert, N. & Jeunet, J. & Jonard, N., 2000. "A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs," International Journal of Production Economics, Elsevier, vol. 68(3), pages 241-257, December.
    2. Chu, Chi-Leung & Leon, V. Jorge, 2009. "Scalable methodology for supply chain inventory coordination with private information," European Journal of Operational Research, Elsevier, vol. 195(1), pages 262-279, May.
    3. Meller, Russell D., 1995. "The impact of multiple stocking points on system profitability," International Journal of Production Economics, Elsevier, vol. 38(2-3), pages 209-214, March.
    4. N.C. Simpson & S. Selcuk Erenguc, 2005. "Modeling multiple stage manufacturing systems with generalized costs and capacity issues," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(6), pages 560-570, September.
    5. Wen-Tsung Ho & Shu-Fang Lai & Yun-Kuei Huang, 2014. "An Optimal Mixed Batch Shipment Policy for Multiple Items in a Single-Supplier Multiple-Retailer Integrated System," Journal of Optimization Theory and Applications, Springer, vol. 160(2), pages 636-658, February.
    6. Erenguc, S. Selcuk & Simpson, N. C. & Vakharia, Asoo J., 1999. "Integrated production/distribution planning in supply chains: An invited review," European Journal of Operational Research, Elsevier, vol. 115(2), pages 219-236, June.
    7. Dellaert, Nico & Jeunet, Jully, 2003. "Controlling multi-level production in a rolling-schedule environment," International Journal of Production Economics, Elsevier, vol. 85(1), pages 113-121, July.
    8. Gencer, Cevriye & Erol, Serpil & Erol, Yalcin, 1999. "A decision network algorithm for multi-stage dynamic lot sizing problems," International Journal of Production Economics, Elsevier, vol. 62(3), pages 281-285, September.
    9. Wee, H. M. & Yang, P. C., 2004. "The optimal and heuristic solutions of a distribution network," European Journal of Operational Research, Elsevier, vol. 158(3), pages 626-632, November.
    10. Zhao, Xiande & Lam, Kokin, 1997. "Lot-sizing rules and freezing the master production schedule in material requirements planning systems," International Journal of Production Economics, Elsevier, vol. 53(3), pages 281-305, December.
    11. Simpson, N. C., 1999. "Multiple level production planning in rolling horizon assembly environments," European Journal of Operational Research, Elsevier, vol. 114(1), pages 15-28, April.
    12. Elena Katok & Holly S. Lewis & Terry P. Harrison, 1998. "Lot Sizing in General Assembly Systems with Setup Costs, Setup Times, and Multiple Constrained Resources," Management Science, INFORMS, vol. 44(6), pages 859-877, June.
    13. Xiao, Yiyong & Kaku, Ikou & Zhao, Qiuhong & Zhang, Renqian, 2011. "A reduced variable neighborhood search algorithm for uncapacitated multilevel lot-sizing problems," European Journal of Operational Research, Elsevier, vol. 214(2), pages 223-231, October.
    14. Sahin, Funda & Powell Robinson, E. & Gao, Li-Lian, 2008. "Master production scheduling policy and rolling schedules in a two-stage make-to-order supply chain," International Journal of Production Economics, Elsevier, vol. 115(2), pages 528-541, October.
    15. Dellaert, N. P. & Jeunet, J., 2003. "Randomized multi-level lot-sizing heuristics for general product structures," European Journal of Operational Research, Elsevier, vol. 148(1), pages 211-228, July.
    16. Kimms, Alf & Drexl, Andreas, 1996. "Multi-level lot sizing: A literature survey," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 405, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
    17. Xiao, Yiyong & Zhang, Renqian & Zhao, Qiuhong & Kaku, Ikou & Xu, Yuchun, 2014. "A variable neighborhood search with an effective local search for uncapacitated multilevel lot-sizing problems," European Journal of Operational Research, Elsevier, vol. 235(1), pages 102-114.
    18. Pundoor, Guruprasad & Chen, Zhi-Long, 2009. "Joint cyclic production and delivery scheduling in a two-stage supply chain," International Journal of Production Economics, Elsevier, vol. 119(1), pages 55-74, May.
    19. Jans, Raf & Degraeve, Zeger, 2007. "Meta-heuristics for dynamic lot sizing: A review and comparison of solution approaches," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1855-1875, March.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:inm:ormnsc:v:28:y:1982:i:1:p:44-56. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Asher (email available below). General contact details of provider: https://edirc.repec.org/data/inforea.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.