IDEAS home Printed from https://ideas.repec.org/a/eee/ecmode/v35y2013icp112-117.html
   My bibliography  Save this article

Joint determination of rotation cycle time and number of shipments for a multi-item EPQ model with random defective rate

Author

Listed:
  • Chiu, Yuan-Shyi Peter
  • Huang, Chao-Chih
  • Wu, Mei-Fang
  • Chang, Huei-Hsin

Abstract

This paper addresses the joint determination of a rotation cycle time and number of shipments for a multi-item economic production quantity (EPQ) model with random defective rate. The classic EPQ model considers production planning for a single product with a perfect production process and continuous inventory issuing policy for its finished goods. However, in real vendor–buyer integrated systems, the multi-delivery policy is often used in lieu of the continuous issuing policy, and due to various uncontrollable factors, the generation of defective items is inevitable. Furthermore, in order to maximize machine utilization, management often plans the production of m products in turn on a single machine, rather than a single product on one machine, as assumed by the EPQ model. Therefore, by assuming that all defective items produced are scrap, this study aims to jointly determine the optimal rotation cycle time and number of shipments that minimize the long-run average cost for such an imperfect quality multi-item EPQ model. We employ mathematical modeling with the renewal reward theorem and obtain closed-form optimal operating policies for the proposed model. Further, we demonstrate the practical use of the results by using a numerical example and sensitivity analysis.

Suggested Citation

  • Chiu, Yuan-Shyi Peter & Huang, Chao-Chih & Wu, Mei-Fang & Chang, Huei-Hsin, 2013. "Joint determination of rotation cycle time and number of shipments for a multi-item EPQ model with random defective rate," Economic Modelling, Elsevier, vol. 35(C), pages 112-117.
  • Handle: RePEc:eee:ecmode:v:35:y:2013:i:c:p:112-117
    DOI: 10.1016/j.econmod.2013.06.024
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0264999313002423
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.econmod.2013.06.024?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. G. J. Gaalman, 1978. "Optimal Aggregation of Multi-Item Production Smoothing Models," Management Science, INFORMS, vol. 24(16), pages 1733-1739, December.
    2. Bylka, Stanislaw, 2003. "Competitive and cooperative policies for the vendor-buyer system," International Journal of Production Economics, Elsevier, vol. 81(1), pages 533-544, January.
    3. Leroy B. Schwarz & Bryan L. Deuermeyer & Ralph D. Badinelli, 1985. "Fill-Rate Optimization in a One-Warehouse N-Identical Retailer Distribution System," Management Science, INFORMS, vol. 31(4), pages 488-498, April.
    4. Viswanathan, S., 1998. "Optimal strategy for the integrated vendor-buyer inventory model," European Journal of Operational Research, Elsevier, vol. 105(1), pages 38-42, February.
    5. Sila Çetinkaya & Chung-Yee Lee, 2000. "Stock Replenishment and Shipment Scheduling for Vendor-Managed Inventory Systems," Management Science, INFORMS, vol. 46(2), pages 217-232, February.
    6. Sana, Shib Sankar, 2012. "A collaborating inventory model in a supply chain," Economic Modelling, Elsevier, vol. 29(5), pages 2016-2023.
    7. Ertogral, Kadir, 2008. "Multi-item single source ordering problem with transportation cost: A Lagrangian decomposition approach," European Journal of Operational Research, Elsevier, vol. 191(1), pages 156-165, November.
    8. Sarmah, S.P. & Acharya, D. & Goyal, S.K., 2006. "Buyer vendor coordination models in supply chain management," European Journal of Operational Research, Elsevier, vol. 175(1), pages 1-15, November.
    9. David, Israel & Eben-Chaime, Moshe, 2008. "How accurate is the integrated vendor-buyer continuous model?," International Journal of Production Economics, Elsevier, vol. 114(2), pages 805-810, August.
    10. Jodlbauer, Herbert & Reitner, Sonja, 2012. "Optimizing service-level and relevant cost for a stochastic multi-item cyclic production system," International Journal of Production Economics, Elsevier, vol. 136(2), pages 306-317.
    11. Sarkar, Biswajit & Sarkar, Sumon, 2013. "An improved inventory model with partial backlogging, time varying deterioration and stock-dependent demand," Economic Modelling, Elsevier, vol. 30(C), pages 924-932.
    12. Swenseth, Scott R. & Godfrey, Michael R., 2002. "Incorporating transportation costs into inventory replenishment decisions," International Journal of Production Economics, Elsevier, vol. 77(2), pages 113-130, May.
    13. Alghalith, Moawia, 2013. "The interaction among production, hedging and investment decisions," Economic Modelling, Elsevier, vol. 30(C), pages 193-195.
    14. Jaber, M.Y. & Goyal, S.K., 2008. "Coordinating a three-level supply chain with multiple suppliers, a vendor and multiple buyers," International Journal of Production Economics, Elsevier, vol. 116(1), pages 95-103, November.
    15. Robert C. Leachman & André Gascon, 1988. "A Heuristic Scheduling Policy for Multi-Item, Single-Machine Production Systems with Time-Varying, Stochastic Demands," Management Science, INFORMS, vol. 34(3), pages 377-390, March.
    16. Chelbi, Anis & Rezg, Nidhal, 2006. "Analysis of a production/inventory system with randomly failing production unit subjected to a minimum required availability level," International Journal of Production Economics, Elsevier, vol. 99(1-2), pages 131-143, February.
    17. Mordechai Henig & Yigal Gerchak, 1990. "The Structure of Periodic Review Policies in the Presence of Random Yield," Operations Research, INFORMS, vol. 38(4), pages 634-643, August.
    18. Gary L. Bergstrom & Barnard E. Smith, 1970. "Multi-Item Production Planning--An Extension of the HMMS Rules," Management Science, INFORMS, vol. 16(10), pages 614-629, June.
    19. Wee, H.M. & Yu, Jonas & Chen, M.C., 2007. "Optimal inventory model for items with imperfect quality and shortage backordering," Omega, Elsevier, vol. 35(1), pages 7-11, February.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Chiu, Yuan-Shyi Peter & Chen, Yung-Chung & Lin, Hong-Dar & Chang, Huei-Hsin, 2014. "Combining an improved multi-delivery policy into a single-producer multi-retailer integrated inventory system with scrap in production," Economic Modelling, Elsevier, vol. 39(C), pages 163-167.
    2. Tseng, Chao-Tang & Wu, Mei-Fang & Lin, Hong-Dar & Chiu, Yuan-Shyi Peter, 2014. "Solving a vendor–buyer integrated problem with rework and a specific multi-delivery policy by a two-phase algebraic approach," Economic Modelling, Elsevier, vol. 36(C), pages 30-36.
    3. Chiu, Singa Wang & Lin, Li-Wen & Chen, Kuang-Ku & Chou, Chung-Li, 2013. "Determining production–shipment policy for a vendor–buyer integrated system with rework and an amending multi-delivery schedule," Economic Modelling, Elsevier, vol. 33(C), pages 668-675.
    4. Chiu, Singa Wang & Pai, Fan-Yun & Wu, Wen Kuei, 2013. "Alternative approach to determine the common cycle time for a multi-item production system with discontinuous deliveries and failure in rework," Economic Modelling, Elsevier, vol. 35(C), pages 593-596.
    5. Chiu, Singa Wang & Chou, Chung-Li & Wu, Wen-Kuei, 2013. "Optimizing replenishment policy in an EPQ-based inventory model with nonconforming items and breakdown," Economic Modelling, Elsevier, vol. 35(C), pages 330-337.
    6. Glock, Christoph H., 2012. "The joint economic lot size problem: A review," International Journal of Production Economics, Elsevier, vol. 135(2), pages 671-686.
    7. Ben-Daya, M. & Darwish, M. & Ertogral, K., 2008. "The joint economic lot sizing problem: Review and extensions," European Journal of Operational Research, Elsevier, vol. 185(2), pages 726-742, March.
    8. Sancak, Emre & Salman, F. Sibel, 2011. "Multi-item dynamic lot-sizing with delayed transportation policy," International Journal of Production Economics, Elsevier, vol. 131(2), pages 595-603, June.
    9. Bylka, StanisLaw, 2011. "Non-cooperative strategies for production and shipment lot sizing in one vendor-multi-buyer system," International Journal of Production Economics, Elsevier, vol. 131(1), pages 372-382, May.
    10. Darwish, M.A. & Odah, O.M., 2010. "Vendor managed inventory model for single-vendor multi-retailer supply chains," European Journal of Operational Research, Elsevier, vol. 204(3), pages 473-484, August.
    11. Ivan Darma Wangsa & Hui Ming Wee & Shih-Hsien Tseng, 2019. "A coordinated vendor–buyer system considering loss and damage claims, insurance cost and stochastic lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 10(3), pages 384-398, June.
    12. Sarmah, S.P. & Acharya, D. & Goyal, S.K., 2006. "Buyer vendor coordination models in supply chain management," European Journal of Operational Research, Elsevier, vol. 175(1), pages 1-15, November.
    13. Lee, Wenyih, 2005. "A joint economic lot size model for raw material ordering, manufacturing setup, and finished goods delivering," Omega, Elsevier, vol. 33(2), pages 163-174, April.
    14. Xu Zhang & Panlop Zeephongsekul & Maryam Esmaeili, 2012. "Seller ¨C Buyer Supply Chain Games Where Shortage Are Permitted," Journal of Management and Strategy, Journal of Management and Strategy, Sciedu Press, vol. 3(4), pages 1-14, November.
    15. van Norden, Linda & van de Velde, Steef, 2005. "Multi-product lot-sizing with a transportation capacity reservation contract," European Journal of Operational Research, Elsevier, vol. 165(1), pages 127-138, August.
    16. Lee, Shine-Der & Fu, Yen-Chen, 2014. "Joint production and delivery lot sizing for a make-to-order producer–buyer supply chain with transportation cost," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 66(C), pages 23-35.
    17. Ouyang, Liang-Yuh & Wu, Kun-Shan & Ho, Chia-Huei, 2004. "Integrated vendor-buyer cooperative models with stochastic demand in controllable lead time," International Journal of Production Economics, Elsevier, vol. 92(3), pages 255-266, December.
    18. Bylka, Stanislaw, 2009. "Non-cooperative strategies for production and shipments lot sizing in the vendor-buyer system," International Journal of Production Economics, Elsevier, vol. 118(1), pages 243-252, March.
    19. Sarmah, S.P. & Acharya, D. & Goyal, S.K., 2008. "Coordination of a single-manufacturer/multi-buyer supply chain with credit option," International Journal of Production Economics, Elsevier, vol. 111(2), pages 676-685, February.
    20. Beullens, Patrick, 2014. "Revisiting foundations in lot sizing—Connections between Harris, Crowther, Monahan, and Clark," International Journal of Production Economics, Elsevier, vol. 155(C), pages 68-81.

    More about this item

    Keywords

    Multi-item production system; Rotation cycle time; Multi-delivery; Economic production quantity model; Scrap; Vendor–buyer integrated system;
    All these keywords.

    JEL classification:

    • C02 - Mathematical and Quantitative Methods - - General - - - Mathematical Economics
    • M11 - Business Administration and Business Economics; Marketing; Accounting; Personnel Economics - - Business Administration - - - Production Management
    • C44 - Mathematical and Quantitative Methods - - Econometric and Statistical Methods: Special Topics - - - Operations Research; Statistical Decision Theory
    • C61 - Mathematical and Quantitative Methods - - Mathematical Methods; Programming Models; Mathematical and Simulation Modeling - - - Optimization Techniques; Programming Models; Dynamic Analysis

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ecmode:v:35:y:2013:i:c:p:112-117. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/inca/30411 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.