Alternative approach to determine the common cycle time for a multi-item production system with discontinuous deliveries and failure in rework
Author
Abstract
Suggested Citation
DOI: 10.1016/j.econmod.2013.08.017
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Awi Federgruen & Joern Meissner & Michal Tzur, 2007.
"Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems,"
Operations Research, INFORMS, vol. 55(3), pages 490-502, June.
- Awi Federgruen & Joern Meissner & Michal Tzur, 2002. "Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems," Working Papers MRG/0001, Department of Management Science, Lancaster University, revised Nov 2004.
- Chiu, Singa Wang & Lin, Li-Wen & Chen, Kuang-Ku & Chou, Chung-Li, 2013. "Determining production–shipment policy for a vendor–buyer integrated system with rework and an amending multi-delivery schedule," Economic Modelling, Elsevier, vol. 33(C), pages 668-675.
- Sana, Shib Sankar, 2012. "A collaborating inventory model in a supply chain," Economic Modelling, Elsevier, vol. 29(5), pages 2016-2023.
- Grubbstrom, Robert W. & Erdem, Asli, 1999. "The EOQ with backlogging derived without derivatives," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 529-530, March.
- Alghalith, Moawia, 2013. "The interaction among production, hedging and investment decisions," Economic Modelling, Elsevier, vol. 30(C), pages 193-195.
- Anthony Zahorik & L. Joseph Thomas & William W. Trigeiro, 1984. "Network Programming Models for Production Scheduling in Multi-Stage, Multi-Item Capacitated Systems," Management Science, INFORMS, vol. 30(3), pages 308-325, March.
- Evan L. Porteus, 1986. "Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction," Operations Research, INFORMS, vol. 34(1), pages 137-144, February.
- Robert C. Leachman & André Gascon, 1988. "A Heuristic Scheduling Policy for Multi-Item, Single-Machine Production Systems with Time-Varying, Stochastic Demands," Management Science, INFORMS, vol. 34(3), pages 377-390, March.
- Gary L. Bergstrom & Barnard E. Smith, 1970. "Multi-Item Production Planning--An Extension of the HMMS Rules," Management Science, INFORMS, vol. 16(10), pages 614-629, June.
- Wee, H.M. & Yu, Jonas & Chen, M.C., 2007. "Optimal inventory model for items with imperfect quality and shortage backordering," Omega, Elsevier, vol. 35(1), pages 7-11, February.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Hesham K. Alfares & Ahmed M. Attia, 2017. "A supply chain model with vendor-managed inventory, consignment, and quality inspection errors," International Journal of Production Research, Taylor & Francis Journals, vol. 55(19), pages 5706-5727, October.
- Chiu, Yuan-Shyi Peter & Chen, Yung-Chung & Lin, Hong-Dar & Chang, Huei-Hsin, 2014. "Combining an improved multi-delivery policy into a single-producer multi-retailer integrated inventory system with scrap in production," Economic Modelling, Elsevier, vol. 39(C), pages 163-167.
- Shima Shafiee-Gol & Mohammad Mahdi Nasiri & Ata Allah Taleizadeh, 2016. "Pricing and production decisions in multi-product single machine manufacturing system with discrete delivery and rework," OPSEARCH, Springer;Operational Research Society of India, vol. 53(4), pages 873-888, December.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Tseng, Chao-Tang & Wu, Mei-Fang & Lin, Hong-Dar & Chiu, Yuan-Shyi Peter, 2014. "Solving a vendor–buyer integrated problem with rework and a specific multi-delivery policy by a two-phase algebraic approach," Economic Modelling, Elsevier, vol. 36(C), pages 30-36.
- Chiu, Yuan-Shyi Peter & Huang, Chao-Chih & Wu, Mei-Fang & Chang, Huei-Hsin, 2013. "Joint determination of rotation cycle time and number of shipments for a multi-item EPQ model with random defective rate," Economic Modelling, Elsevier, vol. 35(C), pages 112-117.
- Chang, Hung-Chi & Ho, Chia-Huei, 2010. "Exact closed-form solutions for "optimal inventory model for items with imperfect quality and shortage backordering"," Omega, Elsevier, vol. 38(3-4), pages 233-237, June.
- Chiu, Yuan-Shyi Peter & Chang, Huei-Hsin, 2014. "Optimal run time for EPQ model with scrap, rework and stochastic breakdowns: A note," Economic Modelling, Elsevier, vol. 37(C), pages 143-148.
- Hsu, Jia-Tzer & Hsu, Lie-Fern, 2013. "An EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns," International Journal of Production Economics, Elsevier, vol. 143(1), pages 162-170.
- Tien-Yu Lin & Kuo-Lung Hou, 2015. "An imperfect quality economic order quantity with advanced receiving," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 23(2), pages 535-551, July.
- Yoo, Seung Ho & Kim, DaeSoo & Park, Myung-Sub, 2009. "Economic production quantity model with imperfect-quality items, two-way imperfect inspection and sales return," International Journal of Production Economics, Elsevier, vol. 121(1), pages 255-265, September.
- Chiu, Singa Wang & Chou, Chung-Li & Wu, Wen-Kuei, 2013. "Optimizing replenishment policy in an EPQ-based inventory model with nonconforming items and breakdown," Economic Modelling, Elsevier, vol. 35(C), pages 330-337.
- Chiu, Yuan-Shyi Peter & Chen, Yung-Chung & Lin, Hong-Dar & Chang, Huei-Hsin, 2014. "Combining an improved multi-delivery policy into a single-producer multi-retailer integrated inventory system with scrap in production," Economic Modelling, Elsevier, vol. 39(C), pages 163-167.
- Chiu, Singa Wang & Liang, Gang-Ming & Chiu, Yuan-Shyi Peter & Chiu, Tiffany, 2019. "Production planning incorporating issues of reliability and backlogging with service level constraint," Operations Research Perspectives, Elsevier, vol. 6(C).
- Ivan Darma Wangsa & Hui Ming Wee & Shih-Hsien Tseng, 2019. "A coordinated vendor–buyer system considering loss and damage claims, insurance cost and stochastic lead time," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 10(3), pages 384-398, June.
- Milind Dawande & Srinagesh Gavirneni & Yinping Mu & Suresh Sethi & Chelliah Sriskandarajah, 2010. "On the Interaction Between Demand Substitution and Production Changeovers," Manufacturing & Service Operations Management, INFORMS, vol. 12(4), pages 682-691, September.
- Asif Iqbal Malik & Biswajit Sarkar, 2019. "Coordinating Supply-Chain Management under Stochastic Fuzzy Environment and Lead-Time Reduction," Mathematics, MDPI, vol. 7(5), pages 1-28, May.
- Chiu, Singa Wang & Lin, Li-Wen & Chen, Kuang-Ku & Chou, Chung-Li, 2013. "Determining production–shipment policy for a vendor–buyer integrated system with rework and an amending multi-delivery schedule," Economic Modelling, Elsevier, vol. 33(C), pages 668-675.
- Kevin Hsu, Wen-Kai & Yu, Hong-Fwu, 2009. "EOQ model for imperfective items under a one-time-only discount," Omega, Elsevier, vol. 37(5), pages 1018-1026, October.
- Nita Shah & Monika Naik, 2019. "Coordinated production, ordering, shipment and pricing model for supplier-retailer inventory system under trade credit," Operations Research and Decisions, Wroclaw University of Science and Technology, Faculty of Management, vol. 29(2), pages 55-76.
- Wakhid Ahmad Jauhari & I Nyoman Pujawan & Mokh Suef, 2023. "Sustainable inventory management with hybrid production system and investment to reduce defects," Annals of Operations Research, Springer, vol. 324(1), pages 543-572, May.
- Taleizadeh, Ata Allah & Khanbaglo, Mahboobeh Perak Sari & Cárdenas-Barrón, Leopoldo Eduardo, 2016. "An EOQ inventory model with partial backordering and reparation of imperfect products," International Journal of Production Economics, Elsevier, vol. 182(C), pages 418-434.
- Kim, DaeSoo & Lee, Won J., 1998. "Optimal joint pricing and lot sizing with fixed and variable capacity," European Journal of Operational Research, Elsevier, vol. 109(1), pages 212-227, August.
- Dhouib, K. & Gharbi, A. & Ben Aziza, M.N., 2012. "Joint optimal production control/preventive maintenance policy for imperfect process manufacturing cell," International Journal of Production Economics, Elsevier, vol. 137(1), pages 126-136.
More about this item
Keywords
Multi-item production; Common cycle time; Discontinuous deliveries; Failure in rework; Algebraic approach; Scrap;All these keywords.
JEL classification:
- M11 - Business Administration and Business Economics; Marketing; Accounting; Personnel Economics - - Business Administration - - - Production Management
- C02 - Mathematical and Quantitative Methods - - General - - - Mathematical Economics
- C44 - Mathematical and Quantitative Methods - - Econometric and Statistical Methods: Special Topics - - - Operations Research; Statistical Decision Theory
- C61 - Mathematical and Quantitative Methods - - Mathematical Methods; Programming Models; Mathematical and Simulation Modeling - - - Optimization Techniques; Programming Models; Dynamic Analysis
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ecmode:v:35:y:2013:i:c:p:593-596. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/inca/30411 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.