IDEAS home Printed from https://ideas.repec.org/r/nii/wpaper/415.html
   My bibliography  Save this item

מקבלי דמי אבטלה, 1997

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Kohn, Robert E., 1999. "Thresholds and complementarities in an economic model of preserving and conserving biodiversity," Socio-Economic Planning Sciences, Elsevier, vol. 33(2), pages 151-172, June.
  2. Jaber, Mohamad Y. & Bonney, Maurice, 2001. "Economic lot sizing with learning and continuous time discounting: Is it significant?," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 135-143, May.
  3. Hadjinicola, George C. & Kumar, K. Ravi, 2002. "Modeling manufacturing and marketing options in international operations," International Journal of Production Economics, Elsevier, vol. 75(3), pages 287-304, February.
  4. Sum, Chee-Chuong & Quek, Ser-Aik & Lim, Hoon-Eng, 1999. "Analysing interaction effects on MRP implementation using ACE," International Journal of Production Economics, Elsevier, vol. 58(3), pages 303-318, January.
  5. Jimenez, Javier Salinas & Chaparro, Francisco Pedraja & Smith, Peter C., 2003. "Evaluating the introduction of a quasi-market in community care," Socio-Economic Planning Sciences, Elsevier, vol. 37(1), pages 1-13, March.
  6. Muda, Shaladdin & Hendry, Linda, 2002. "Developing a new world class model for small and medium sized make-to-order companies," International Journal of Production Economics, Elsevier, vol. 78(3), pages 295-310, August.
  7. Avkiran, Necmi K., 2001. "Investigating technical and scale efficiencies of Australian Universities through data envelopment analysis," Socio-Economic Planning Sciences, Elsevier, vol. 35(1), pages 57-80, March.
  8. Huiskonen, Janne, 2001. "Maintenance spare parts logistics: Special characteristics and strategic choices," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 125-133, May.
  9. Bazsa, E. M. & Frenk, J. B. G. & den Iseger, P. W., 2001. "Modeling of inventory control with regenerative processes," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 263-276, May.
  10. Diponegoro, Ahmad & Sarker, Bhaba R., 2002. "Determining manufacturing batch sizes for a lumpy delivery system with trend demand," International Journal of Production Economics, Elsevier, vol. 77(2), pages 131-143, May.
  11. Hinterhuber, Hans H. & Friedrich, Stephan A., 2002. "The technology dimension of strategic leadership : The leadership challenge for production economists," International Journal of Production Economics, Elsevier, vol. 77(3), pages 191-203, June.
  12. Sohal, Amrik S. & Fitzpatrick, Paul, 2002. "IT governance and management in large Australian organisations," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 97-112, January.
  13. Alexander Cotte, Poveda, 2011. "Economic development and growth in Colombia: An empirical analysis with super-efficiency DEA and panel data models," Socio-Economic Planning Sciences, Elsevier, vol. 45(4), pages 154-164, December.
  14. Ng, C. T. & Li, Leon Y. O. & Chakhlevitch, K., 2001. "Coordinated replenishments with alternative supply sources in two-level supply chains," International Journal of Production Economics, Elsevier, vol. 73(3), pages 227-240, October.
  15. Lillrank, Paul & Holopainen, Sami & Paavola, Teemu, 2002. "Analyzing productivity with the enabler-effect map," International Journal of Production Economics, Elsevier, vol. 78(1), pages 69-78, July.
  16. Huiskonen, Janne & Pirttila, Timo, 2002. "Lateral coordination in a logistics outsourcing relationship," International Journal of Production Economics, Elsevier, vol. 78(2), pages 177-185, July.
  17. David, Israel & Levi, Ofer, 2001. "Asset-selling problems with holding costs," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 317-321, May.
  18. Waeyenbergh, Geert & Pintelon, Liliane, 2002. "A framework for maintenance concept development," International Journal of Production Economics, Elsevier, vol. 77(3), pages 299-313, June.
  19. Petroni, Alberto & Rizzi, Antonio, 2002. "A fuzzy logic based methodology to rank shop floor dispatching rules," International Journal of Production Economics, Elsevier, vol. 76(1), pages 99-108, March.
  20. Pennings, Enrico & Natter, Martin, 2001. "Strategic diversification and capacity utilization," International Journal of Production Economics, Elsevier, vol. 72(3), pages 261-272, August.
  21. Segelod, Esbjorn, 2002. "Resource allocation in a few industries: Determinants and trends," International Journal of Production Economics, Elsevier, vol. 77(1), pages 63-70, May.
  22. Blomqvist, K. & Kylaheiko, K. & Virolainen, V. -M., 2002. "Filling a gap in traditional transaction cost economics: : Towards transaction benefits-based analysis," International Journal of Production Economics, Elsevier, vol. 79(1), pages 1-14, September.
  23. Chou, Shuo-Yan & Chang, Sheng-Lin & Yang, Wen-Dwo, 2001. "Optimal multiple delivery schedule for demand in logistic model," International Journal of Production Economics, Elsevier, vol. 73(3), pages 241-249, October.
  24. Ekins, Paul & Simon, Sandrine, 2001. "Estimating sustainability gaps: methods and preliminary applications for the UK and the Netherlands," Ecological Economics, Elsevier, vol. 37(1), pages 5-22, April.
  25. Bayo-Moriones, Alberto & Merino-Diaz de Cerio, Javier, 2001. "Quality management and high performance work practices: Do they coexist?," International Journal of Production Economics, Elsevier, vol. 73(3), pages 251-259, October.
  26. Anjomani, Ardeshir, 2002. "Regional growth and interstate migration," Socio-Economic Planning Sciences, Elsevier, vol. 36(4), pages 239-265, December.
  27. Giannoccaro, Ilaria & Pontrandolfo, Pierpaolo, 2002. "Inventory management in supply chains: a reinforcement learning approach," International Journal of Production Economics, Elsevier, vol. 78(2), pages 153-161, July.
  28. Banerjee, Snehamay & Banerjee, Avijit & Burton, Jonathan & Bistline, William, 2001. "Controlled partial shipments in two-echelon supply chain networks: a simulation study," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 91-100, May.
  29. Nasierowski, W. & Arcelus, F. J., 2003. "On the efficiency of national innovation systems," Socio-Economic Planning Sciences, Elsevier, vol. 37(3), pages 215-234, September.
  30. Rho, Boo-Ho & Park, Kwangtae & Yu, Yung-Mok, 2001. "An international comparison of the effect of manufacturing strategy-implementation gap on business performance," International Journal of Production Economics, Elsevier, vol. 70(1), pages 89-97, March.
  31. Albino, Vito & Pontrandolfo, Pierpaolo & Scozzi, Barbara, 2002. "Analysis of information flows to enhance the coordination of production processes," International Journal of Production Economics, Elsevier, vol. 75(1-2), pages 7-19, January.
  32. de Haan, Job & Yamamoto, Masaru & Lovink, Gerben, 2001. "Production planning in Japan: rediscovering lost experiences or new insights?," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 101-109, May.
  33. Khouja, Moutaz, 2001. "The effect of large order quantities on expected profit in the single-period model," International Journal of Production Economics, Elsevier, vol. 72(3), pages 227-235, August.
  34. Moon, Ilkyeong & A. Silver, Edward, 2001. "Minimizing the expected total value of shortages for a population of items subject to practical restrictions on the reorder points," International Journal of Production Economics, Elsevier, vol. 70(1), pages 45-54, March.
  35. Cote, Murray J., 2005. "A note on "Bed allocation techniques based on census data"," Socio-Economic Planning Sciences, Elsevier, vol. 39(2), pages 183-192, June.
  36. Weng, Michael X. & Lu, John & Ren, Haiying, 2001. "Unrelated parallel machine scheduling with setup consideration and a total weighted completion time objective," International Journal of Production Economics, Elsevier, vol. 70(3), pages 215-226, April.
  37. Correa, Hector, 2001. "An analytic approach to the study of gun control policies," Socio-Economic Planning Sciences, Elsevier, vol. 35(4), pages 253-262, December.
  38. Murillo-Zamorano, Luis R. & Vega-Cervera, Juan A., 2001. "The use of parametric and non-parametric frontier methods to measure the productive efficiency in the industrial sector: A comparative study," International Journal of Production Economics, Elsevier, vol. 69(3), pages 265-275, February.
  39. Garg, Suresh & Vrat, Prem & Kanda, Arun, 2001. "Equipment flexibility vs. inventory: A simulation study of manufacturing systems," International Journal of Production Economics, Elsevier, vol. 70(2), pages 125-143, March.
  40. Ben-Daya, Mohamed, 2002. "The economic production lot-sizing problem with imperfect production processes and imperfect maintenance," International Journal of Production Economics, Elsevier, vol. 76(3), pages 257-264, April.
  41. Riane, F. & Artiba, A. & Iassinovski, S., 2001. "An integrated production planning and scheduling system for hybrid flowshop organizations," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 33-48, December.
  42. Forza, Cipriano & Salvador, Fabrizio, 2002. "Managing for variety in the order acquisition and fulfilment process: The contribution of product configuration systems," International Journal of Production Economics, Elsevier, vol. 76(1), pages 87-98, March.
  43. Hallikas, Jukka & Virolainen, Veli-Matti & Tuominen, Markku, 2002. "Risk analysis and assessment in network environments: A dyadic case study," International Journal of Production Economics, Elsevier, vol. 78(1), pages 45-55, July.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.