IDEAS home Printed from https://ideas.repec.org/r/nii/wpaper/395.html
   My bibliography  Save this item

גמלאות אמהות 1995‎-1992

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Beach, R. & Muhlemann, A. P. & Price, D. H. R. & Paterson, A. & Sharp, J. A., 2000. "The selection of information systems for production management: An evolving problem," International Journal of Production Economics, Elsevier, vol. 64(1-3), pages 319-329, March.
  2. Forza, C. & Salvador, F., 2001. "Information flows for high-performance manufacturing," International Journal of Production Economics, Elsevier, vol. 70(1), pages 21-36, March.
  3. Schmidt, Gunter, 2000. "Performance guarantee of two simple priority rules for production scheduling," International Journal of Production Economics, Elsevier, vol. 68(2), pages 151-159, November.
  4. Lai, K. K. & Xue, Jue & Zhang, Guoqing, 2002. "Layout design for a paper reel warehouse: A two-stage heuristic approach," International Journal of Production Economics, Elsevier, vol. 75(3), pages 231-243, February.
  5. Schippers, Werner A. J., 2001. "An integrated approach to process control," International Journal of Production Economics, Elsevier, vol. 69(1), pages 93-105, January.
  6. A.M. Lima, Marcos & Resende, Marcelo & Hasenclever, Lia, 2000. "Quality certification and performance of Brazilian firms: An empirical study," International Journal of Production Economics, Elsevier, vol. 66(2), pages 143-147, June.
  7. Kuik, Roelof & Tielemans, Peter F. J., 1999. "Lead-time variability in a homogeneous queueing model of batching," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 435-441, March.
  8. Zhaohui Zeng, Amy & Hayya, Jack C., 1999. "The performance of two popular service measures on management effectiveness in inventory control," International Journal of Production Economics, Elsevier, vol. 58(2), pages 147-158, January.
  9. Jimenez, Javier Salinas & Chaparro, Francisco Pedraja & Smith, Peter C., 2003. "Evaluating the introduction of a quasi-market in community care," Socio-Economic Planning Sciences, Elsevier, vol. 37(1), pages 1-13, March.
  10. Muda, Shaladdin & Hendry, Linda, 2002. "Developing a new world class model for small and medium sized make-to-order companies," International Journal of Production Economics, Elsevier, vol. 78(3), pages 295-310, August.
  11. Dellaert, N. & Jeunet, J. & Jonard, N., 2000. "A genetic algorithm to solve the general multi-level lot-sizing problem with time-varying costs," International Journal of Production Economics, Elsevier, vol. 68(3), pages 241-257, December.
  12. Ammar, Salwa & Wright, Ronald, 2000. "Applying fuzzy-set theory to performance evaluation," Socio-Economic Planning Sciences, Elsevier, vol. 34(4), pages 285-302, December.
  13. Hicks, C. & McGovern, T. & Earl, C. F., 2000. "Supply chain management: A strategic issue in engineer to order manufacturing," International Journal of Production Economics, Elsevier, vol. 65(2), pages 179-190, April.
  14. Chen, Jen-Ming, 1998. "An inventory model for deteriorating items with time-proportional demand and shortages under inflation and time discounting," International Journal of Production Economics, Elsevier, vol. 55(1), pages 21-30, June.
  15. Raab, Raymond & Kotamraju, Pradeep & Haag, Stephen, 2000. "Efficient provision of child quality of life in less developed countries: conventional development indexes versus a programming approach to development indexes," Socio-Economic Planning Sciences, Elsevier, vol. 34(1), pages 51-67, March.
  16. Rolf Färe & Shawna Grosskopf & Gerald Whittaker, 2014. "Network DEA II," International Series in Operations Research & Management Science, in: Wade D. Cook & Joe Zhu (ed.), Data Envelopment Analysis, edition 127, chapter 0, pages 307-327, Springer.
  17. Hinterhuber, Hans H. & Friedrich, Stephan A., 2002. "The technology dimension of strategic leadership : The leadership challenge for production economists," International Journal of Production Economics, Elsevier, vol. 77(3), pages 191-203, June.
  18. Lillrank, Paul & Holopainen, Sami & Paavola, Teemu, 2002. "Analyzing productivity with the enabler-effect map," International Journal of Production Economics, Elsevier, vol. 78(1), pages 69-78, July.
  19. Huiskonen, Janne & Pirttila, Timo, 2002. "Lateral coordination in a logistics outsourcing relationship," International Journal of Production Economics, Elsevier, vol. 78(2), pages 177-185, July.
  20. David, Israel & Levi, Ofer, 2001. "Asset-selling problems with holding costs," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 317-321, May.
  21. Levitin, G. & Meizin, L., 2001. "Structure optimization for continuous production systems with buffers under reliability constraints," International Journal of Production Economics, Elsevier, vol. 70(1), pages 77-87, March.
  22. Da Silveira, Giovani & Borenstein, Denis & Fogliatto, Flavio S., 2001. "Mass customization: Literature review and research directions," International Journal of Production Economics, Elsevier, vol. 72(1), pages 1-13, June.
  23. Albino, Vito & Izzo, Carmen & Kuhtz, Silvana, 2002. "Input-output models for the analysis of a local/global supply chain," International Journal of Production Economics, Elsevier, vol. 78(2), pages 119-131, July.
  24. Segelod, Esbjorn, 2002. "Resource allocation in a few industries: Determinants and trends," International Journal of Production Economics, Elsevier, vol. 77(1), pages 63-70, May.
  25. Beuthe, Michel & Eeckhoudt, Louis & Scannella, Giuseppe, 2000. "A practical multicriteria methodology for assessing risky public investments," Socio-Economic Planning Sciences, Elsevier, vol. 34(2), pages 121-139, June.
  26. Hurley, Simon F. & Clay Whybark, D., 1999. "Inventory and capacity trade-offs in a manufacturing cell," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 203-212, March.
  27. Ekins, Paul & Simon, Sandrine, 2001. "Estimating sustainability gaps: methods and preliminary applications for the UK and the Netherlands," Ecological Economics, Elsevier, vol. 37(1), pages 5-22, April.
  28. Homburg, Carsten, 2001. "Using data envelopment analysis to benchmark activities," International Journal of Production Economics, Elsevier, vol. 73(1), pages 51-58, August.
  29. Anjomani, Ardeshir, 2002. "Regional growth and interstate migration," Socio-Economic Planning Sciences, Elsevier, vol. 36(4), pages 239-265, December.
  30. Giannoccaro, Ilaria & Pontrandolfo, Pierpaolo, 2002. "Inventory management in supply chains: a reinforcement learning approach," International Journal of Production Economics, Elsevier, vol. 78(2), pages 153-161, July.
  31. Kim, Bowon, 1998. "Optimal development of production technology when autonomous and induced learning are present," International Journal of Production Economics, Elsevier, vol. 55(1), pages 39-52, June.
  32. de Haan, Job & Yamamoto, Masaru & Lovink, Gerben, 2001. "Production planning in Japan: rediscovering lost experiences or new insights?," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 101-109, May.
  33. Portnov, Boris A. & Erell, Evyatar, 2004. "Interregional inequalities in Israel, 1948-1995: divergence or convergence?," Socio-Economic Planning Sciences, Elsevier, vol. 38(4), pages 255-289, December.
  34. Khouja, Moutaz, 2001. "The effect of large order quantities on expected profit in the single-period model," International Journal of Production Economics, Elsevier, vol. 72(3), pages 227-235, August.
  35. Jack, Nat & Van der Duyn Schouten, Frank, 2000. "Optimal repair-replace strategies for a warranted product," International Journal of Production Economics, Elsevier, vol. 67(1), pages 95-100, August.
  36. Ouyang, Liang-Yuh & Chang, Hung-Chi, 2002. "A minimax distribution free procedure for mixed inventory models involving variable lead time with fuzzy lost sales," International Journal of Production Economics, Elsevier, vol. 76(1), pages 1-12, March.
  37. Percy, David F. & Kobbacy, Khairy A. H. & Fawzi, Bahir B., 1997. "Setting preventive maintenance schedules when data are sparse," International Journal of Production Economics, Elsevier, vol. 51(3), pages 223-234, September.
  38. Bailey, Keiron & Grossardt, Ted & Pride-Wells, Michaele, 2007. "Community design of a light rail transit-oriented development using casewise visual evaluation (CAVE)," Socio-Economic Planning Sciences, Elsevier, vol. 41(3), pages 235-254, September.
  39. Maffin, David & Braiden, Paul, 2001. "Manufacturing and supplier roles in product development," International Journal of Production Economics, Elsevier, vol. 69(2), pages 205-213, January.
  40. Hallikas, Jukka & Virolainen, Veli-Matti & Tuominen, Markku, 2002. "Risk analysis and assessment in network environments: A dyadic case study," International Journal of Production Economics, Elsevier, vol. 78(1), pages 45-55, July.
  41. Kaya, C. Yalcin, 2004. "Time-optimal switching control for the US cocaine epidemic," Socio-Economic Planning Sciences, Elsevier, vol. 38(1), pages 57-72, March.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.