My bibliography
Save this item
Models Arising from a Flexible Manufacturing Machine, Part II: Minimization of the Number of Switching Instants
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Atan, Tankut S. & Pandit, Ram, 1996. "Auxiliary tool allocation in flexible manufacturing systems," European Journal of Operational Research, Elsevier, vol. 89(3), pages 642-659, March.
- Crama, Yves & Flippo, Olaf E. & van de Klundert, Joris & Spieksma, Frits C. R., 1997. "The assembly of printed circuit boards: A case with multiple machines and multiple board types," European Journal of Operational Research, Elsevier, vol. 98(3), pages 457-472, May.
- Akhundov, Najmaddin & Ostrowski, James, 2024. "Exploiting symmetry for the job sequencing and tool switching problem," European Journal of Operational Research, Elsevier, vol. 316(3), pages 976-987.
- Moshe Dror & Mohamed Haouari, 2000. "Generalized Steiner Problems and Other Variants," Journal of Combinatorial Optimization, Springer, vol. 4(4), pages 415-436, December.
- Schwerdfeger, Stefan & Boysen, Nils, 2017. "Order picking along a crane-supplied pick face: The SKU switching problem," European Journal of Operational Research, Elsevier, vol. 260(2), pages 534-545.
- Marc Peeters & Zeger Degraeve, 2004. "The Co-Printing Problem: A Packing Problem with a Color Constraint," Operations Research, INFORMS, vol. 52(4), pages 623-638, August.
- Furrer, Martina & Mütze, Torsten, 2017. "An algorithmic framework for tool switching problems with multiple objectives," European Journal of Operational Research, Elsevier, vol. 259(3), pages 1003-1016.
- Chakravarty, Amiya K. & Balakrishnan, Nagraj, 1995. "Impact of job-sequence on the down-time of a deteriorating flexible machine," European Journal of Operational Research, Elsevier, vol. 87(2), pages 299-315, December.
- Khadija Hadj Salem & Vincent Jost & Yann Kieffer & Luc Libralesso & Stéphane Mancini, 2022. "Minimizing makespan under data prefetching constraints for embedded vision systems: a study of optimization methods and their performance," Operational Research, Springer, vol. 22(3), pages 1639-1673, July.
- Meltem Denizel, 2003. "Minimization of the Number of Tool Magazine Setups on Automated Machines: A Lagrangean Decomposition Approach," Operations Research, INFORMS, vol. 51(2), pages 309-320, April.
- Matzliach, Barouch & Tzur, Michal, 2000. "Storage management of items in two levels of availability," European Journal of Operational Research, Elsevier, vol. 121(2), pages 363-379, March.
- Dang, Quang-Vinh & van Diessen, Thijs & Martagan, Tugce & Adan, Ivo, 2021. "A matheuristic for parallel machine scheduling with tool replacements," European Journal of Operational Research, Elsevier, vol. 291(2), pages 640-660.
- Calmels, Dorothea, 2022. "An iterated local search procedure for the job sequencing and tool switching problem with non-identical parallel machines," European Journal of Operational Research, Elsevier, vol. 297(1), pages 66-85.
- Knuutila, Timo & Nevalainen, Olli, 2002. "A reduction technique for weighted grouping problems," European Journal of Operational Research, Elsevier, vol. 140(3), pages 590-605, August.
- Christopher S. Tang, 2017. "OM Forum—Three Simple Approaches for Young Scholars to Identify Relevant and Novel Research Topics in Operations Management," Manufacturing & Service Operations Management, INFORMS, vol. 19(3), pages 338-346, July.
- Soares, Leonardo Cabral R. & Carvalho, Marco Antonio M., 2020. "Biased random-key genetic algorithm for scheduling identical parallel machines with tooling constraints," European Journal of Operational Research, Elsevier, vol. 285(3), pages 955-964.
- Konak, Abdullah & Kulturel-Konak, Sadan & Azizoglu, Meral, 2008. "Minimizing the number of tool switching instants in Flexible Manufacturing Systems," International Journal of Production Economics, Elsevier, vol. 116(2), pages 298-307, December.
- Renato de Matta & Vernon Ning Hsu & Timothy J. Lowe, 1999. "Capacitated selection problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(1), pages 19-37, February.
- Marvizadeh, S. Zamiri & Choobineh, F.F., 2013. "Reducing the number of setups for CNC punch presses," Omega, Elsevier, vol. 41(2), pages 226-235.
- Matthias Kaltenbrunner & Maria Anna Huka & Manfred Gronalt, 2022. "Heuristic based approach for short term production planning in highly automated customer oriented pallet production," Journal of Intelligent Manufacturing, Springer, vol. 33(4), pages 1087-1098, April.
- Sodhi, Manbir S. & Lamond, Bernard F. & Gautier, Antoine & Noel, Martin, 2001. "Heuristics for determining economic processing rates in a flexible manufacturing system," European Journal of Operational Research, Elsevier, vol. 129(1), pages 105-115, February.
- Crama, Yves, 1997. "Combinatorial optimization models for production scheduling in automated manufacturing systems," European Journal of Operational Research, Elsevier, vol. 99(1), pages 136-153, May.
- Nagraj Balakrishnan & Amiya K. Chakravarty, 2001. "Opportunistic retooling of a flexible machine subject to failure," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(1), pages 79-97, February.
- M. Selim Akturk & Jay B. Ghosh & Evrim D. Gunes, 2003. "Scheduling with tool changes to minimize total completion time: A study of heuristics and their performance," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(1), pages 15-30, February.
- Yves Crama & Joris van de Klundert, 1999. "Worst‐case performance of approximation algorithms for tool management problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(5), pages 445-462, August.
- Olivier Goldschmidt & David Nehme & Gang Yu, 1994. "Note: On the set‐union knapsack problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(6), pages 833-842, October.
- Chakravarty, Amiya K. & Balakrishnan, Nagraj, 1997. "Job sequencing rules for minimizing the expected makespan in flexible machines," European Journal of Operational Research, Elsevier, vol. 96(2), pages 274-288, January.