IDEAS home Printed from https://ideas.repec.org/r/inm/ormnsc/v36y1990i11p1329-1338.html
   My bibliography  Save this item

Modelling Emergency Lateral Transshipments in Inventory Systems

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. van Wijk, A.C.C. & Adan, I.J.B.F. & van Houtum, G.J., 2012. "Approximate evaluation of multi-location inventory models with lateral transshipments and hold back levels," European Journal of Operational Research, Elsevier, vol. 218(3), pages 624-635.
  2. Tiacci, Lorenzo & Saetta, Stefano, 2011. "Reducing the mean supply delay of spare parts using lateral transshipments policies," International Journal of Production Economics, Elsevier, vol. 133(1), pages 182-191, September.
  3. Guangyuan Yang & Rommert Dekker, 2010. "Service Parts Inventory Control with Lateral Transshipment that takes Time," Tinbergen Institute Discussion Papers 10-025/4, Tinbergen Institute, revised 10 Mar 2010.
  4. Tiemessen, H.G.H. & Fleischmann, M. & van Houtum, G.J. & van Nunen, J.A.E.E. & Pratsini, E., 2013. "Dynamic demand fulfillment in spare parts networks with multiple customer classes," European Journal of Operational Research, Elsevier, vol. 228(2), pages 367-380.
  5. Paterson, Colin & Kiesmüller, Gudrun & Teunter, Ruud & Glazebrook, Kevin, 2011. "Inventory models with lateral transshipments: A review," European Journal of Operational Research, Elsevier, vol. 210(2), pages 125-136, April.
  6. Olsson, Fredrik, 2009. "Optimal policies for inventory systems with lateral transshipments," International Journal of Production Economics, Elsevier, vol. 118(1), pages 175-184, March.
  7. Fritzsche, R., 2012. "Cost adjustment for single item pooling models using a dynamic failure rate: A calculation for the aircraft industry," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 48(6), pages 1065-1079.
  8. Hossein Abouee-Mehrizi & Oded Berman & Shrutivandana Sharma, 2015. "Optimal Joint Replenishment and Transshipment Policies in a Multi-Period Inventory System with Lost Sales," Operations Research, INFORMS, vol. 63(2), pages 342-350, April.
  9. Yang, Guangyuan & Dekker, Rommert & Gabor, Adriana F. & Axsäter, Sven, 2013. "Service parts inventory control with lateral transshipment and pipeline stockflexibility," International Journal of Production Economics, Elsevier, vol. 142(2), pages 278-289.
  10. Craig C. Sherbrooke, 1992. "Multiechelon inventory systems with lateral supply," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(1), pages 29-40, February.
  11. Xinxin Hu & Izak Duenyas & Roman Kapuscinski, 2008. "Optimal Joint Inventory and Transshipment Control Under Uncertain Capacity," Operations Research, INFORMS, vol. 56(4), pages 881-897, August.
  12. Xu, Kefeng & Evers, Philip T. & Fu, Michael C., 2003. "Estimating customer service in a two-location continuous review inventory model with emergency transshipments," European Journal of Operational Research, Elsevier, vol. 145(3), pages 569-584, March.
  13. Tang, Shao-Long & Yan, Hong, 2010. "Pre-distribution vs. post-distribution for cross-docking with transshipments," Omega, Elsevier, vol. 38(3-4), pages 192-202, June.
  14. Seifert, Ralf W. & Thonemann, Ulrich W. & Sieke, Marcel A., 2006. "Integrating direct and indirect sales channels under decentralized decision-making," International Journal of Production Economics, Elsevier, vol. 103(1), pages 209-229, September.
  15. Axsater, Sven, 2003. "Evaluation of unidirectional lateral transshipments and substitutions in inventory systems," European Journal of Operational Research, Elsevier, vol. 149(2), pages 438-447, September.
  16. Wong, Hartanto & Cattrysse, Dirk & Van Oudheusden, Dirk, 2005. "Inventory pooling of repairable spare parts with non-zero lateral transshipment time and delayed lateral transshipments," European Journal of Operational Research, Elsevier, vol. 165(1), pages 207-218, August.
  17. Ching, Wai Ki, 1997. "Markov-modulated Poisson processes for multi-location inventory problems," International Journal of Production Economics, Elsevier, vol. 53(2), pages 217-223, November.
  18. Minner, Stefan & Silver, Edward A. & Robb, David J., 2003. "An improved heuristic for deciding on emergency transshipments," European Journal of Operational Research, Elsevier, vol. 148(2), pages 384-400, July.
  19. Yale T. Herer & Ayelet Rashit, 1999. "Lateral stock transshipments in a two‐location inventory system with fixed and joint replenishment costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 46(5), pages 525-547, August.
  20. De‐bi Cao & Edward A. Silver, 2005. "A dynamic allocation heuristic for centralized safety stock," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(6), pages 513-526, September.
  21. Kochel, Peter, 1996. "On queueing models for some multi-location problems," International Journal of Production Economics, Elsevier, vol. 45(1-3), pages 429-433, August.
  22. Baskaya, Serhat & Ertem, Mustafa Alp & Duran, Serhan, 2017. "Pre-positioning of relief items in humanitarian logistics considering lateral transhipment opportunities," Socio-Economic Planning Sciences, Elsevier, vol. 57(C), pages 50-60.
  23. Alvarez, E.M. & van der Heijden, M.C. & Vliegen, I.M.H. & Zijm, W.H.M., 2014. "Service differentiation through selective lateral transshipments," European Journal of Operational Research, Elsevier, vol. 237(3), pages 824-835.
  24. Paterson, Colin & Teunter, Ruud & Glazebrook, Kevin, 2012. "Enhanced lateral transshipments in a multi-location inventory system," European Journal of Operational Research, Elsevier, vol. 221(2), pages 317-327.
  25. Tagaras, George, 1999. "Pooling in multi-location periodic inventory distribution systems," Omega, Elsevier, vol. 27(1), pages 39-59, February.
  26. Tiacci, Lorenzo & Saetta, Stefano, 2011. "A heuristic for balancing the inventory level of different locations through lateral shipments," International Journal of Production Economics, Elsevier, vol. 131(1), pages 87-95, May.
  27. Lee, Young Hae & Jung, Jung Woo & Jeon, Young Sang, 2007. "An effective lateral transshipment policy to improve service level in the supply chain," International Journal of Production Economics, Elsevier, vol. 106(1), pages 115-126, March.
  28. Diks, E. B. & de Kok, A. G. & Lagodimos, A. G., 1996. "Multi-echelon systems: A service measure perspective," European Journal of Operational Research, Elsevier, vol. 95(2), pages 241-263, December.
  29. Jason Acimovic & Stephen C. Graves, 2015. "Making Better Fulfillment Decisions on the Fly in an Online Retail Environment," Manufacturing & Service Operations Management, INFORMS, vol. 17(1), pages 34-51, February.
  30. Zhang, Jiaqi & Archibald, Thomas W., 2011. "A semi-Markov model with holdout transshipment policy and phase-type exponential lead time," European Journal of Operational Research, Elsevier, vol. 211(3), pages 650-657, June.
  31. Satır, Benhür & Savasaneril, Secil & Serin, Yasemin, 2012. "Pooling through lateral transshipments in service parts systems," European Journal of Operational Research, Elsevier, vol. 220(2), pages 370-377.
  32. Seidscher, Arkadi & Minner, Stefan, 2013. "A Semi-Markov decision problem for proactive and reactive transshipments between multiple warehouses," European Journal of Operational Research, Elsevier, vol. 230(1), pages 42-52.
  33. Amy Cohn, 2006. "Composite-variable modeling for service parts logistics," Annals of Operations Research, Springer, vol. 144(1), pages 17-32, April.
  34. Kilpi, Jani & Töyli, Juuso & Vepsäläinen, Ari, 2009. "Cooperative strategies for the availability service of repairable aircraft components," International Journal of Production Economics, Elsevier, vol. 117(2), pages 360-370, February.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.