My bibliography
Save this item
Rounding Off to Powers of Two in Continuous Relaxations of Capacitated Lot Sizing Problems
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Luca Bertazzi & Maria Grazia Speranza & Walter Ukovich, 2000. "Exact and Heuristic Solutions for a Shipment Problem with Given Frequencies," Management Science, INFORMS, vol. 46(7), pages 973-988, July.
- B.C. Giri & I. Moon & W.Y. Yun, 2003. "Scheduling economic lot sizes in deteriorating production systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(6), pages 650-661, September.
- M Khouja, 2003. "Synchronization in supply chains: implications for design and management," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(9), pages 984-994, September.
- Salvietti, Luciano & Smith, Neale R., 2008. "A profit-maximizing economic lot scheduling problem with price optimization," European Journal of Operational Research, Elsevier, vol. 184(3), pages 900-914, February.
- Bertazzi, Luca, 2003. "Rounding off the optimal solution of the economic lot size problem," International Journal of Production Economics, Elsevier, vol. 81(1), pages 385-392, January.
- Qinan Wang, 2001. "Coordinating Independent Buyers in a Distribution System to Increase a Vendor's Profits," Manufacturing & Service Operations Management, INFORMS, vol. 3(4), pages 337-348, May.
- Porras, Eric & Dekker, Rommert, 2008. "A solution method for the joint replenishment problem with correction factor," International Journal of Production Economics, Elsevier, vol. 113(2), pages 834-851, June.
- Wang, Qinan & Chay, Yiowmin & Wu, Zhang, 2011. "Streamlining inventory flows with time discounts to improve the profits of a decentralized supply chain," International Journal of Production Economics, Elsevier, vol. 132(2), pages 230-239, August.
- Carstensen, Peter, 1997. "Das Economic Lot Scheduling Problem: Überblick und LP-basiertes Verfahren," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 465, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Mark Goh & Ou Jihong & Teo Chung‐Piaw, 2001. "Warehouse sizing to minimize inventory and storage costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(4), pages 299-312, June.
- Chung-Piaw Teo & Dimitris Bertsimas, 2001. "Multistage Lot Sizing Problems via Randomized Rounding," Operations Research, INFORMS, vol. 49(4), pages 599-608, August.
- McGee, Victor E. & Pyke, David F., 1996. "Periodic production scheduling at a fastener manufacturer," International Journal of Production Economics, Elsevier, vol. 46(1), pages 65-87, December.
- Khouja, Moutaz, 1997. "The scheduling of economic lot sizes on volume flexible production systems," International Journal of Production Economics, Elsevier, vol. 48(1), pages 73-86, January.
- Retsef Levi & Thomas Magnanti & Jack Muckstadt & Danny Segev & Eric Zarybnisky, 2014. "Maintenance scheduling for modular systems: Modeling and algorithms," Naval Research Logistics (NRL), John Wiley & Sons, vol. 61(6), pages 472-488, September.
- Kimms, Alf & Drexl, Andreas, 1996. "Multi-level lot sizing: A literature survey," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 405, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Sodhi, ManMohan S. & Sodhi, Navdeep S. & Tang, Christopher S., 2014. "An EOQ model for MRO customers under stochastic price to quantify bullwhip effect for the manufacturer," International Journal of Production Economics, Elsevier, vol. 155(C), pages 132-142.
- Serge M. Karalli & A. Dale Flowers, 2006. "The Multiple-Family ELSP with Safety Stocks," Operations Research, INFORMS, vol. 54(3), pages 523-531, June.
- Adeinat, Hamza & Pazhani, Subramanian & Mendoza, Abraham & Ventura, Jose A., 2022. "Coordination of pricing and inventory replenishment decisions in a supply chain with multiple geographically dispersed retailers," International Journal of Production Economics, Elsevier, vol. 248(C).
- Sin-Hoon Hum & Moosa Sharafali & Chung-Piaw Teo, 2005. "Staggering Periodic Replenishment in Multivendor JIT Environments," Operations Research, INFORMS, vol. 53(4), pages 698-710, August.
- Mili Mehrotra & Milind Dawande & Srinagesh Gavirneni & Mehmet Demirci & Sridhar Tayur, 2011. "OR PRACTICE---Production Planning with Patterns: A Problem from Processed Food Manufacturing," Operations Research, INFORMS, vol. 59(2), pages 267-282, April.
- Khouja, Moutaz & Michalewicz, Zgibniew & Wilmot, Michael, 1998. "The use of genetic algorithms to solve the economic lot size scheduling problem," European Journal of Operational Research, Elsevier, vol. 110(3), pages 509-524, November.
- Guillermo Gallego & Robin Roundy, 1992. "The economic lot scheduling problem with finite backorder costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(5), pages 729-739, August.
- Porras Musalem, E. & Dekker, R., 2005. "Generalized Solutions for the joint replenishment problem with correction factor," Econometric Institute Research Papers EI 2005-19, Erasmus University Rotterdam, Erasmus School of Economics (ESE), Econometric Institute.
- Moncer Hariga, 1994. "Coordinated overhaul scheduling of production units," Naval Research Logistics (NRL), John Wiley & Sons, vol. 41(4), pages 565-577, June.
- Rappold, James A. & Yoho, Keenan D., 2014. "Setting safety stocks for stable rotation cycle schedules," International Journal of Production Economics, Elsevier, vol. 156(C), pages 146-158.
- Li, Xiuhui & Wang, Qinan, 2007. "Coordination mechanisms of supply chain systems," European Journal of Operational Research, Elsevier, vol. 179(1), pages 1-16, May.