Coordinated overhaul scheduling of production units
Author
Abstract
Suggested Citation
DOI: 10.1002/1520-6750(199406)41:43.0.CO;2-Q
Download full text from publisher
References listed on IDEAS
- Escudero, L. F., 1982. "On maintenance scheduling of production units," European Journal of Operational Research, Elsevier, vol. 9(3), pages 264-274, March.
- Robin Roundy, 1989. "Rounding Off to Powers of Two in Continuous Relaxations of Capacitated Lot Sizing Problems," Management Science, INFORMS, vol. 35(12), pages 1433-1442, December.
- William L. Maxwell & John A. Muckstadt, 1985. "Establishing Consistent and Realistic Reorder Intervals in Production-Distribution Systems," Operations Research, INFORMS, vol. 33(6), pages 1316-1341, December.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Adeinat, Hamza & Pazhani, Subramanian & Mendoza, Abraham & Ventura, Jose A., 2022. "Coordination of pricing and inventory replenishment decisions in a supply chain with multiple geographically dispersed retailers," International Journal of Production Economics, Elsevier, vol. 248(C).
- Luca Bertazzi & Maria Grazia Speranza & Walter Ukovich, 2000. "Exact and Heuristic Solutions for a Shipment Problem with Given Frequencies," Management Science, INFORMS, vol. 46(7), pages 973-988, July.
- Mark Goh & Ou Jihong & Teo Chung‐Piaw, 2001. "Warehouse sizing to minimize inventory and storage costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 48(4), pages 299-312, June.
- Chung-Piaw Teo & Dimitris Bertsimas, 2001. "Multistage Lot Sizing Problems via Randomized Rounding," Operations Research, INFORMS, vol. 49(4), pages 599-608, August.
- Retsef Levi & Thomas Magnanti & Jack Muckstadt & Danny Segev & Eric Zarybnisky, 2014. "Maintenance scheduling for modular systems: Modeling and algorithms," Naval Research Logistics (NRL), John Wiley & Sons, vol. 61(6), pages 472-488, September.
- Bertazzi, Luca, 2003. "Rounding off the optimal solution of the economic lot size problem," International Journal of Production Economics, Elsevier, vol. 81(1), pages 385-392, January.
- Kimms, Alf & Drexl, Andreas, 1996. "Multi-level lot sizing: A literature survey," Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel 405, Christian-Albrechts-Universität zu Kiel, Institut für Betriebswirtschaftslehre.
- Li, Xiuhui & Wang, Qinan, 2007. "Coordination mechanisms of supply chain systems," European Journal of Operational Research, Elsevier, vol. 179(1), pages 1-16, May.
- Mili Mehrotra & Milind Dawande & Srinagesh Gavirneni & Mehmet Demirci & Sridhar Tayur, 2011. "OR PRACTICE---Production Planning with Patterns: A Problem from Processed Food Manufacturing," Operations Research, INFORMS, vol. 59(2), pages 267-282, April.
- Vroblefski, Mark & Ramesh, R. & Zionts, Stanley, 2000. "Efficient lot-sizing under a differential transportation cost structure for serially distributed warehouses," European Journal of Operational Research, Elsevier, vol. 127(3), pages 574-593, December.
- Brian Q. Rieksts & José A. Ventura & Yale T. Herer & Daning Sun, 2007. "Technical note: Worst‐case performance of power‐of‐two policies for serial inventory systems with incremental quantity discounts," Naval Research Logistics (NRL), John Wiley & Sons, vol. 54(5), pages 583-587, August.
- Sin-Hoon Hum & Moosa Sharafali & Chung-Piaw Teo, 2005. "Staggering Periodic Replenishment in Multivendor JIT Environments," Operations Research, INFORMS, vol. 53(4), pages 698-710, August.
- Guillermo Gallego & Robin Roundy, 1992. "The economic lot scheduling problem with finite backorder costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(5), pages 729-739, August.
- Peter L. Jackson & John A. Muckstadt, 1989. "Risk pooling in a two‐period, two‐echelon inventory stocking and allocation problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 36(1), pages 1-26, February.
- Sodhi, ManMohan S. & Sodhi, Navdeep S. & Tang, Christopher S., 2014. "An EOQ model for MRO customers under stochastic price to quantify bullwhip effect for the manufacturer," International Journal of Production Economics, Elsevier, vol. 155(C), pages 132-142.
- Ian R. Webb & Bruce R. Buzby & Gerard M. Campbell, 1997. "Cyclical schedules for the joint replenishment problem with dynamic demands," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(6), pages 577-589, September.
- Bollapragada, Srinivas & Gupta, Aparna & Lawsirirat, Chaipat, 2007. "Managing a portfolio of long term service agreements," European Journal of Operational Research, Elsevier, vol. 182(3), pages 1399-1411, November.
- Erenguc, S. Selcuk & Simpson, N. C. & Vakharia, Asoo J., 1999. "Integrated production/distribution planning in supply chains: An invited review," European Journal of Operational Research, Elsevier, vol. 115(2), pages 219-236, June.
- Wei Huang & H. Edwin Romeijn & Joseph Geunes, 2005. "The continuous‐time single‐sourcing problem with capacity expansion opportunities," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(3), pages 193-211, April.
- Fangruo Chen, 1999. "94%-Effective Policies for a Two-Stage Serial Inventory System with Stochastic Demand," Management Science, INFORMS, vol. 45(12), pages 1679-1696, December.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:41:y:1994:i:4:p:565-577. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.