My bibliography
Save this item
Planning Horizon Procedures for Machine Replacement Models
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Tim McClurg & Suresh Chand, 2002. "A parallel machine replacement model," Naval Research Logistics (NRL), John Wiley & Sons, vol. 49(3), pages 275-287, April.
- A. Bensoussan & Q. Feng & S. P. Sethi, 2022. "Integrating equipment investment strategy with maintenance operations under uncertain failures," Annals of Operations Research, Springer, vol. 317(2), pages 353-386, October.
- Israel David & Eitan Greenshtein & Avraham Mehrez, 1997. "A dynamic‐programming approach to continuous‐review obsolescent inventory problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 44(8), pages 757-774, December.
- Phuc Hong Nguyen & Kung-Jeng Wang, 2019. "Strategic capacity portfolio planning under demand uncertainty and technological change," Flexible Services and Manufacturing Journal, Springer, vol. 31(4), pages 926-944, December.
- Suresh Chand & Tim McClurg & Jim Ward, 1993. "A single‐machine replacement model with learning," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(2), pages 175-192, March.
- Fuying Jing & Zirui Lan, 2017. "Forecast horizon of multi-item dynamic lot size model with perishable inventory," PLOS ONE, Public Library of Science, vol. 12(11), pages 1-15, November.
- Tzvi Goldstein & Shaul P. Ladany & Abraham Mehrez, 1988. "A discounted machine‐replacement model with an expected future technological breakthrough," Naval Research Logistics (NRL), John Wiley & Sons, vol. 35(2), pages 209-220, April.
- Yatsenko, Yuri & Hritonenko, Natali, 2015. "Algorithms for asset replacement under limited technological forecast," International Journal of Production Economics, Elsevier, vol. 160(C), pages 26-33.
- Yu. Yatsenko & N. Hritonenko, 2007. "Network economics and optimal replacement of age-structured IT capital," Mathematical Methods of Operations Research, Springer;Gesellschaft für Operations Research (GOR);Nederlands Genootschap voor Besliskunde (NGB), vol. 65(3), pages 483-497, June.
- Awi Federgruen & Michal Tzur, 1996. "Detection of minimal forecast horizons in dynamic programs with multiple indicators of the future," Naval Research Logistics (NRL), John Wiley & Sons, vol. 43(2), pages 169-189, March.
- Yatsenko, Yuri & Hritonenko, Natali, 2017. "Machine replacement under evolving deterministic and stochastic costs," International Journal of Production Economics, Elsevier, vol. 193(C), pages 491-501.
- Yatsenko, Yuri & Hritonenko, Natali, 2008. "Properties of optimal service life under technological change," International Journal of Production Economics, Elsevier, vol. 114(1), pages 230-238, July.
- Wang, Kung-Jeng & Nguyen, Phuc Hong, 2017. "Capacity planning with technology replacement by stochastic dynamic programming," European Journal of Operational Research, Elsevier, vol. 260(2), pages 739-750.
- Mørch, Ove & Fagerholt, Kjetil & Pantuso, Giovanni & Rakke, Jørgen, 2017. "Maximizing the rate of return on the capital employed in shipping capacity renewal," Omega, Elsevier, vol. 67(C), pages 42-53.
- Hartman, Joseph C., 2004. "Multiple asset replacement analysis under variable utilization and stochastic demand," European Journal of Operational Research, Elsevier, vol. 159(1), pages 145-165, November.
- Yuri Yatsenko & Natali Hritonenko, 2016. "Asset replacement under improving operating and capital costs: a practical approach," International Journal of Production Research, Taylor & Francis Journals, vol. 54(10), pages 2922-2933, May.
- S. Bylka & S. Sethi & G. Sorger, 1992. "Minimal forecast horizons in equipment replacement models with multiple technologies and general switching costs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(4), pages 487-507, June.
- Adkins, Roger & Paxson, Dean, 2013. "Deterministic models for premature and postponed replacement," Omega, Elsevier, vol. 41(6), pages 1008-1019.
- Ali Dogramaci & Nelson M. Fraiman, 2004. "Replacement Decisions with Maintenance Under Uncertainty: An Imbedded Optimal Control Model," Operations Research, INFORMS, vol. 52(5), pages 785-794, October.
- Wallace J. Hopp & Suresh K. Nair, 1991. "Timing replacement decisions under discontinuous technological change," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(2), pages 203-220, April.
- Yatsenko, Yuri & Hritonenko, Natali, 2011. "Economic life replacement under improving technology," International Journal of Production Economics, Elsevier, vol. 133(2), pages 596-602, October.
- M. S. Krishnan & Tridas Mukhopadhyay & Charles H. Kriebel, 2004. "A Decision Model for Software Maintenance," Information Systems Research, INFORMS, vol. 15(4), pages 396-412, December.
- Philip C. Jones & James L. Zydiak & Wallace J. Hopp, 1991. "Parallel machine replacement," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(3), pages 351-365, June.
- Suresh P. Sethi & Sushil Gupta & Vipin K. Agrawal & Vijay K. Agrawal, 2022. "Nobel laureates’ contributions to and impacts on operations management," Production and Operations Management, Production and Operations Management Society, vol. 31(12), pages 4283-4303, December.
- Bauer, L. & Mumey, G.A. & Lohr, W., 1989. "Economic Replacement Strategies for Dairy Cattle," Project Report Series 232069, University of Alberta, Department of Resource Economics and Environmental Sociology.
- Zhi‐Long Chen, 1998. "Solution algorithms for the parallel replacement problem under economy of scale," Naval Research Logistics (NRL), John Wiley & Sons, vol. 45(3), pages 279-295, April.
- Suresh Chand & Vernon Ning Hsu & Suresh Sethi, 2002. "Forecast, Solution, and Rolling Horizons in Operations Management Problems: A Classified Bibliography," Manufacturing & Service Operations Management, INFORMS, vol. 4(1), pages 25-43, September.
- Chand, Suresh & McClurg, Tim & Ward, Jim, 2000. "A model for parallel machine replacement with capacity expansion," European Journal of Operational Research, Elsevier, vol. 121(3), pages 519-531, March.
- Öner, K.B. & Kiesmüller, G.P. & van Houtum, G.J., 2015. "On the upgrading policy after the redesign of a component for reliability improvement," European Journal of Operational Research, Elsevier, vol. 244(3), pages 867-880.