IDEAS home Printed from https://ideas.repec.org/r/eee/proeco/v87y2004i1p25-37.html
   My bibliography  Save this item

A replenishment model for the supply-uncertainty problem

Citations

Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
as


Cited by:

  1. Sanjoy Kumar Paul & Ruhul Sarker & Daryl Essam, 2018. "A reactive mitigation approach for managing supply disruption in a three-tier supply chain," Journal of Intelligent Manufacturing, Springer, vol. 29(7), pages 1581-1597, October.
  2. Zhu, Stuart X., 2015. "Dynamic replenishment from two sources with different yields, costs, and leadtimes," International Journal of Production Economics, Elsevier, vol. 165(C), pages 79-89.
  3. Saeed Poormoaied & Ece Zeliha Demirci, 2021. "Analysis of an inventory system with emergency ordering option at the time of supply disruption," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 43(4), pages 1007-1045, December.
  4. Rabta, Boualem & AIssani, Djamil, 2005. "Strong stability in an (R,s,S) inventory model," International Journal of Production Economics, Elsevier, vol. 97(2), pages 159-171, August.
  5. Cheaitou, Ali & Cheaytou, Rima, 2019. "A two-stage capacity reservation supply contract with risky supplier and forecast updating," International Journal of Production Economics, Elsevier, vol. 209(C), pages 42-60.
  6. Bendre, Abhijit Bhagwan & Nielsen, Lars Relund, 2013. "Inventory control in a lost-sales setting with information about supply lead times," International Journal of Production Economics, Elsevier, vol. 142(2), pages 324-331.
  7. Baruah, Pundarikaksha, 2006. "Supply Chains Facing Atypical Demand: Optimal Operational Policies And Benefits Under Information Sharing," MPRA Paper 16101, University Library of Munich, Germany.
  8. A. Thangam, 2017. "Retailer’s optimal replenishment policy in a two-echelon supply chain under two-part delay in payments and disruption in delivery," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(1), pages 26-46, January.
  9. Konstantaras, I. & Skouri, K. & Lagodimos, A.G., 2019. "EOQ with independent endogenous supply disruptions," Omega, Elsevier, vol. 83(C), pages 96-106.
  10. Hu, Benyong & Feng, Yi, 2017. "Optimization and coordination of supply chain with revenue sharing contracts and service requirement under supply and demand uncertainty," International Journal of Production Economics, Elsevier, vol. 183(PA), pages 185-193.
  11. Jason Chang, S.K. & Chuang, Jones P.C. & Chen, Hsiao-Jung, 2005. "Short comments on technical note--The EOQ and EPQ models with shortages derived without derivatives," International Journal of Production Economics, Elsevier, vol. 97(2), pages 241-243, August.
  12. Fianu, Sefakor & Davis, Lauren B., 2018. "A Markov decision process model for equitable distribution of supplies under uncertainty," European Journal of Operational Research, Elsevier, vol. 264(3), pages 1101-1115.
  13. Luangkesorn, K.L. & Klein, G. & Bidanda, B., 2016. "Analysis of production systems with potential for severe disruptions," International Journal of Production Economics, Elsevier, vol. 171(P4), pages 478-486.
  14. Mohebbi, Esmail & Hao, Daipeng, 2006. "When supplier's availability affects the replenishment lead time--An extension of the supply-interruption problem," European Journal of Operational Research, Elsevier, vol. 175(2), pages 992-1008, December.
  15. Mohebbi, Esmail, 2006. "A production-inventory model with randomly changing environmental conditions," European Journal of Operational Research, Elsevier, vol. 174(1), pages 539-552, October.
  16. Serel, Dogan A., 2008. "Inventory and pricing decisions in a single-period problem involving risky supply," International Journal of Production Economics, Elsevier, vol. 116(1), pages 115-128, November.
  17. Ahiska, S. Sebnem & Appaji, Samyuktha R. & King, Russell E. & Warsing, Donald P., 2013. "A Markov decision process-based policy characterization approach for a stochastic inventory control problem with unreliable sourcing," International Journal of Production Economics, Elsevier, vol. 144(2), pages 485-496.
  18. Kamath B, Narasimha & Bhattacharya, Subir, 2007. "Lead time minimization of a multi-product, single-processor system: A comparison of cyclic policies," International Journal of Production Economics, Elsevier, vol. 106(1), pages 28-40, March.
  19. Montanari, Roberto & Bottani, Eleonora & Shekarian, Ehsan & Kazemi, Nima, 2017. "A model for the analysis of procurement strategies in the economic order interval environment," Mathematics and Computers in Simulation (MATCOM), Elsevier, vol. 134(C), pages 79-98.
  20. Bijvank, Marco & Vis, Iris F.A., 2011. "Lost-sales inventory theory: A review," European Journal of Operational Research, Elsevier, vol. 215(1), pages 1-13, November.
  21. Nader Azad & Elkafi Hassini, 2019. "A Benders Decomposition Method for Designing Reliable Supply Chain Networks Accounting for Multimitigation Strategies and Demand Losses," Transportation Science, INFORMS, vol. 53(5), pages 1287-1312, September.
  22. Taleizadeh, Ata Allah & Tafakkori, Keivan & Thaichon, Park, 2021. "Resilience toward supply disruptions: A stochastic inventory control model with partial backordering under the base stock policy," Journal of Retailing and Consumer Services, Elsevier, vol. 58(C).
  23. Nader Azad & Georgios Saharidis & Hamid Davoudpour & Hooman Malekly & Seyed Yektamaram, 2013. "Strategies for protecting supply chain networks against facility and transportation disruptions: an improved Benders decomposition approach," Annals of Operations Research, Springer, vol. 210(1), pages 125-163, November.
  24. Paul, Sanjoy Kumar & Sarker, Ruhul & Essam, Daryl, 2014. "Real time disruption management for a two-stage batch production–inventory system with reliability considerations," European Journal of Operational Research, Elsevier, vol. 237(1), pages 113-128.
  25. Saedi, Samira & Kundakcioglu, O. Erhun & Henry, Andrea C., 2016. "Mitigating the impact of drug shortages for a healthcare facility: An inventory management approach," European Journal of Operational Research, Elsevier, vol. 251(1), pages 107-123.
  26. Snyder, Lawrence V., 2014. "A tight approximation for an EOQ model with supply disruptions," International Journal of Production Economics, Elsevier, vol. 155(C), pages 91-108.
  27. Mohebbi, Esmail & Hao, Daipeng, 2008. "An inventory model with non-resuming randomly interruptible lead time," International Journal of Production Economics, Elsevier, vol. 114(2), pages 755-768, August.
  28. Sevgen, Arya & Sargut, F. Zeynep, 2019. "May reorder point help under disruptions?," International Journal of Production Economics, Elsevier, vol. 209(C), pages 61-69.
  29. Hishamuddin, H. & Sarker, R.A. & Essam, D., 2012. "A disruption recovery model for a single stage production-inventory system," European Journal of Operational Research, Elsevier, vol. 222(3), pages 464-473.
IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.