An Empirical Study on Human Resources Management in Construction Department of EPC Contractors in Petroleum Industries

Author

Listed:
  • Mohammad hossein Mahmoudi Sari

    (University of Art, Tehran)

Abstract

Field survey is carried out in eight large companies involved in a petroleum refinery megaproject in Iran to investigate the effects of human resource management plans on client satisfaction. On the job training of staff as well as economic incentives are applied as the main topics of HRM plans. About 200 questionnaires have been completed along the EPC contractors as well as project client and management consultant. The results of each improving plan inspected during a six-month period and the results are compared. It has been found that there is a meaningful and significant dependence between knowledge based stimuli and client satisfaction. By comparing the financial based and knowledge based incentives, it was found that the technological factors are more important and the results and conclusions are more sensible rather than economic factors. Details of research procedure and differences between economic and technical factors are discussed.

Suggested Citation

  • Mohammad hossein Mahmoudi Sari, 2017. "An Empirical Study on Human Resources Management in Construction Department of EPC Contractors in Petroleum Industries," Proceedings of Business and Management Conferences 5607807, International Institute of Social and Economic Sciences.
  • Handle: RePEc:sek:ibmpro:5607807
    as

    Download full text from publisher

    File URL: https://iises.net/proceedings/6th-business-management-conference-geneva-56/table-of-content/detail?cid=56&iid=010&rid=7807
    File Function: First version, 2017
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Jasper Mbachu & Raymond Nkado, 2006. "Conceptual framework for assessment of client needs and satisfaction in the building development process," Construction Management and Economics, Taylor & Francis Journals, vol. 24(1), pages 31-44.
    2. Helen Clare Lingard & Keith Townsend & Lisa Bradley & Kerry Brown, 2008. "Alternative work schedule interventions in the Australian construction industry: a comparative case study analysis," Construction Management and Economics, Taylor & Francis Journals, vol. 26(10), pages 1101-1112.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Shafaghat, Arezou & Keyvanfar, Ali & Abd. Majid, Muhd Zaimi & Lamit, Hasanuddin Bin & Ahmad, Mohd Hamdan & Ferwati, Mohamed Salim & Ghoshal, Sib Krishna, 2016. "Methods for adaptive behaviors satisfaction assessment with energy efficient building design," Renewable and Sustainable Energy Reviews, Elsevier, vol. 57(C), pages 250-259.
    2. Minyoung Kwon & Hilde Remøy & Andy Van den Dobbelsteen & Ulrich Knaack, 2017. "User-focused design factors of workspace for nearly zero energy office renovation: findings from literature review," ERES eres2017_275, European Real Estate Society (ERES).
    3. Albert P. C. Chan & Yang Yang & Tracy N. Y. Choi & Janet Mayowa Nwaogu, 2022. "Characteristics and Causes of Construction Accidents in a Large-Scale Development Project," Sustainability, MDPI, vol. 14(8), pages 1-25, April.
    4. Zhang, Xiaoling & Shen, Liyin & Chan, Sum Yee, 2012. "The diffusion of solar energy use in HK: What are the barriers?," Energy Policy, Elsevier, vol. 41(C), pages 241-249.
    5. Ali M. Saad & Mohammed Dulaimi & Sambo Lyson Zulu, 2023. "Examining the Influence of UK Public Clients’ Characteristics on Their Own Innovation-Decision towards the Modern Methods of Construction (MMC)," Sustainability, MDPI, vol. 15(5), pages 1-25, February.
    6. Zhang, Xiaoling, 2013. "Going green: Initiatives and technologies in Shanghai World Expo," Renewable and Sustainable Energy Reviews, Elsevier, vol. 25(C), pages 78-88.
    7. Mohammad Tanvi Newaz & Helen Giggins & Udara Ranasinghe, 2022. "A Critical Analysis of Risk Factors and Strategies to Improve Mental Health Issues of Construction Workers," Sustainability, MDPI, vol. 14(20), pages 1-14, October.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:sek:ibmpro:5607807. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Klara Cermakova (email available below). General contact details of provider: https://iises.net/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.