IDEAS home Printed from https://ideas.repec.org/p/pra/mprapa/103532.html
   My bibliography  Save this paper

Practical Solutions to Ensure the Schedule Management of Ho Chi Minh City Urban Railway Project in Vietnam: Survey of Expert's Opinions

Author

Listed:
  • Quang Tran, Phu
  • Thi Quynh Tran, Nhu
  • Nguyen, Phong Thanh

Abstract

The development of the construction industry is considered to be a significant factor contributing to the economic growth of states and countries. However, many studies have shown that the quality of time and schedule management on civil and construction projects has generally been poor. Thus, it is essential to investigate factors that significantly affect the project schedule. This research aims to examine the practice of time management on a particular construction transport project in a developing country, the urban railway project in Ho Chi Minh City, Vietnam, with its six main lines. The implementation of this project began in 2010, but so far, only two lines have been constructed. The implementation process has been struck by many difficulties leading to the slow implementation of the entire urban railway system. To investigate the main causes leading to project delays, a research survey was carried out in three main stages: (1) a questionnaire was designed (2) data was collected with the participation of experts, and (3) an analysis of the data verification of the research model. Then, the analytical hierarchy process approach was applied to assess the priority level of the proposed solutions to ensure the effectiveness of the schedule of the entire urban railway project.

Suggested Citation

  • Quang Tran, Phu & Thi Quynh Tran, Nhu & Nguyen, Phong Thanh, 2020. "Practical Solutions to Ensure the Schedule Management of Ho Chi Minh City Urban Railway Project in Vietnam: Survey of Expert's Opinions," MPRA Paper 103532, University Library of Munich, Germany, revised 28 Jun 2020.
  • Handle: RePEc:pra:mprapa:103532
    as

    Download full text from publisher

    File URL: https://mpra.ub.uni-muenchen.de/103532/1/MPRA_paper_103532.pdf
    File Function: original version
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Nguyen, Phong Thanh & Phu Nguyen, Cuong, 2019. "Risk Management in Engineering and Construction," MPRA Paper 103509, University Library of Munich, Germany, revised 09 Jan 2020.
    2. Duy Chinh Nguyen & Huu Dung Hoang & Huu Tien Hoang & Quang Trung Bui & Lan Phuong Nguyen, 2019. "Modal Preference in Ho Chi Minh City, Vietnam: An Experiment With New Modes of Transport," SAGE Open, , vol. 9(2), pages 21582440198, April.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Nguyen, Phong Thanh & Phu Pham, Cuong & Thanh Phan, Phuong & Bich Vu, Ngoc & Tien Ha Duong, My & Le Hoang Thuy To Nguyen, Quyen, 2020. "Exploring Critical Risk Factors of Office Building Projects," MPRA Paper 109901, University Library of Munich, Germany, revised 30 Dec 2020.
    2. Ngo, Chin & Nguyen, Quyen Le Hoang Thuy To & Nguyen, Phong Thanh, 2020. "Social Capital and Corporate Performance: Evidence from State Capital Enterprises in Vietnam," MPRA Paper 103440, University Library of Munich, Germany, revised 18 Apr 2020.
    3. Thanh NGUYEN, Phong & Le Hoang Thuy To NGUYEN, Quyen, 2020. "Critical Factors Affecting Construction Price Index: An Integrated Fuzzy Logic and Analytical Hierarchy Process," MPRA Paper 103437, University Library of Munich, Germany, revised 31 May 2020.
    4. Yide Liu & Ivan Ka Wai Lai, 2020. "The Effects of Environmental Policy and the Perception of Electric Motorcycles on the Acceptance of Electric Motorcycles: An Empirical Study in Macau," SAGE Open, , vol. 10(1), pages 21582440198, January.
    5. Tien Ha Duong, My & Van Nguyen, Diep & Thanh Nguyen, Phong, 2019. "Using Fuzzy Approach to Model Skill Shortage in Vietnam’s Labor Market in the Context of Industry 4.0," MPRA Paper 103512, University Library of Munich, Germany, revised 07 May 2020.
    6. Hasan Mahmoud & Vian Ahmed & Salwa Beheiry, 2021. "Construction Cash Flow Risk Index," JRFM, MDPI, vol. 14(6), pages 1-17, June.
    7. Quoc Vu, Thong & Phu Pham, Cuong & Anh Nguyen, Thu & Thanh Nguyen, Phong & Thanh Phan, Phuong & Le Hoang Thuy To Nguyen, Quyen, 2020. "Factors Influencing Cost Overruns in Construction Projects of International Contractors in Vietnam," MPRA Paper 103435, University Library of Munich, Germany, revised 28 Jul 2020.

    More about this item

    Keywords

    Analytic Hierarchy Process; Construction Management; Urban Railway; Schedule Management; Project Delay;
    All these keywords.

    JEL classification:

    • H43 - Public Economics - - Publicly Provided Goods - - - Project Evaluation; Social Discount Rate
    • O18 - Economic Development, Innovation, Technological Change, and Growth - - Economic Development - - - Urban, Rural, Regional, and Transportation Analysis; Housing; Infrastructure
    • O2 - Economic Development, Innovation, Technological Change, and Growth - - Development Planning and Policy
    • R42 - Urban, Rural, Regional, Real Estate, and Transportation Economics - - Transportation Economics - - - Government and Private Investment Analysis; Road Maintenance; Transportation Planning

    NEP fields

    This paper has been announced in the following NEP Reports:

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:pra:mprapa:103532. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Joachim Winter (email available below). General contact details of provider: https://edirc.repec.org/data/vfmunde.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.