Bottom-up vs. top-down approaches to supply chain management and modeling
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Axsater, Sven & Jonsson, Henrik, 1984. "Aggregation and disaggregation in hierarchical production planning," European Journal of Operational Research, Elsevier, vol. 17(3), pages 338-350, September.
- Stephen C. Graves, 1982. "Using Lagrangean Techniques to Solve Hierarchical Production Planning Problems," Management Science, INFORMS, vol. 28(3), pages 260-275, March.
- Paul Zipkin, 1982. "Exact and Approximate Cost Functions for Product Aggregates," Management Science, INFORMS, vol. 28(9), pages 1002-1012, September.
- Miguel Taube-Netto, 1996. "Integrated Planning for Poultry Production at Sadia," Interfaces, INFORMS, vol. 26(1), pages 38-53, February.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Huang, Hai-Jun & Xu, Gang, 1998. "Aggregate scheduling and network solving of multi-stage and multi-item manufacturing systems," European Journal of Operational Research, Elsevier, vol. 105(1), pages 52-65, February.
- Selcuk, B. & Fransoo, J.C. & De Kok, A.G., 2006. "The effect of updating lead times on the performance of hierarchical planning systems," International Journal of Production Economics, Elsevier, vol. 104(2), pages 427-440, December.
- Bitran, Gabriel R. & Tirupati, Devanath., 1989. "Hierarchical production planning," Working papers 3017-89., Massachusetts Institute of Technology (MIT), Sloan School of Management.
- Peiling Wu & Joseph C. Hartman & George R. Wilson, 2005. "An Integrated Model and Solution Approach for Fleet Sizing with Heterogeneous Assets," Transportation Science, INFORMS, vol. 39(1), pages 87-103, February.
- Lee, L. H. & Chew, E. P. & Ng, T. S., 2005. "Production planning with approved vendor matrices for a hard-disk drive manufacturer," European Journal of Operational Research, Elsevier, vol. 162(2), pages 310-324, April.
- Awi Federgruen & Joern Meissner & Michal Tzur, 2007.
"Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems,"
Operations Research, INFORMS, vol. 55(3), pages 490-502, June.
- Awi Federgruen & Joern Meissner & Michal Tzur, 2002. "Progressive Interval Heuristics for Multi-Item Capacitated Lot-Sizing Problems," Working Papers MRG/0001, Department of Management Science, Lancaster University, revised Nov 2004.
- Awi Federgruen & Michal Tzur, 1993. "The dynamic lot‐sizing model with backlogging: A simple o(n log n) algorithm and minimal forecast horizon procedure," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(4), pages 459-478, June.
- Yossi Aviv & Awi Federgruen, 2001. "Design for Postponement: A Comprehensive Characterization of Its Benefits Under Unknown Demand Distributions," Operations Research, INFORMS, vol. 49(4), pages 578-598, August.
- Ng, T.S. & Lee, L.H. & Chew, E.P., 2006. "Build-pack planning for hard disk drive assembly with approved vendor matrices and stochastic demands," European Journal of Operational Research, Elsevier, vol. 175(2), pages 1117-1140, December.
- Özalp Özer, 2003. "Replenishment Strategies for Distribution Systems Under Advance Demand Information," Management Science, INFORMS, vol. 49(3), pages 255-272, March.
- Kopanos, Georgios M. & Méndez, Carlos A. & Puigjaner, Luis, 2010. "MIP-based decomposition strategies for large-scale scheduling problems in multiproduct multistage batch plants: A benchmark scheduling problem of the pharmaceutical industry," European Journal of Operational Research, Elsevier, vol. 207(2), pages 644-655, December.
- Peter C. Bell & Chris K. Anderson, 2002. "In Search of Strategic Operations Research/Management Science," Interfaces, INFORMS, vol. 32(2), pages 28-40, April.
- Xue, Guisen & Felix Offodile, O. & Zhou, Hong & Troutt, Marvin D., 2011. "Integrated production planning with sequence-dependent family setup times," International Journal of Production Economics, Elsevier, vol. 131(2), pages 674-681, June.
- Jaya Singhal & Kalyan Singhal, 2008. "A Noniterative Algorithm for the Linear-Quadratic Profit-Maximization Model for Smoothing Multiproduct Production," INFORMS Journal on Computing, INFORMS, vol. 20(2), pages 169-178, May.
- Fumero, Francesca & Vercellis, Carlo, 1997. "Integrating distribution, machine assignment and lot-sizing via Lagrangean relaxation," International Journal of Production Economics, Elsevier, vol. 49(1), pages 45-54, March.
- Barbarosoglu, Gulay & Ozgur, Demet, 1999. "Hierarchical design of an integrated production and 2-echelon distribution system," European Journal of Operational Research, Elsevier, vol. 118(3), pages 464-484, November.
- Wang, Wei & Wang, Dingwei & Ip, W. H., 1999. "JIT production planning approach with fuzzy due date for OKP manufacturing systems," International Journal of Production Economics, Elsevier, vol. 58(2), pages 209-215, January.
- Long Gao & Jim (Junmin) Shi & Michael F. Gorman & Ting Luo, 2020. "Business Analytics for Intermodal Capacity Management," Manufacturing & Service Operations Management, INFORMS, vol. 22(2), pages 310-329, March.
- Ichimura, Takaya, 1996. "The elements and functions of hierarchical scheduling system of order production," International Journal of Production Economics, Elsevier, vol. 44(1-2), pages 73-81, June.
- Jans, R.F. & Degraeve, Z., 2005. "Modeling Industrial Lot Sizing Problems: A Review," ERIM Report Series Research in Management ERS-2005-049-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
More about this item
Keywords
HD28 .M414 no.4017-98;JEL classification:
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:mit:sloanp:2710. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: None (email available below). General contact details of provider: https://edirc.repec.org/data/ssmitus.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.