IDEAS home Printed from https://ideas.repec.org/p/iim/iimawp/8315.html
   My bibliography  Save this paper

Mega projects in India Environmental and Land Acquisition Issues in the Road Sector

Author

Listed:
  • Raghuram, G.
  • Samantha Bastian
  • Satyam Shivam Sundaram

Abstract

Mega projects (primarily infrastructure) receive a sizable investment (~10%) of the gross fixed capital formation in India. Environmental clearances and land acquisitions have been the two major reasons for delays in the projects. However, there has been a steady increase in the proportion of projects running on schedule and a sharp decline in the proportion of projects with cost overruns. These accomplishments have been achieved due to better financing, project management, and reform in the regulatory frameworks related to environmental and land acquisition aspects. The acceptance of a user fee and development of alternate sources of revenue have helped attract larger investments in mega projects. With increasing private sector participation, delays due to project management are expected to reduce. The modifications in the regulatory framework on environmental and land acquisition issues are moves in the right direction. However, methods used for assessments related to environmental impact and land acquisition are still manual, making the whole process time consuming. Technology could be a good instrument in reducing the time required for these assessments as well as in bringing transparency in the system. Decentralization with capacity building at the state level would also help in the long run in reducing these delays.

Suggested Citation

  • Raghuram, G. & Samantha Bastian & Satyam Shivam Sundaram, 2009. "Mega projects in India Environmental and Land Acquisition Issues in the Road Sector," IIMA Working Papers WP2009-03-07, Indian Institute of Management Ahmedabad, Research and Publication Department.
  • Handle: RePEc:iim:iimawp:8315
    as

    Download full text from publisher

    File URL: https://www.iima.ac.in/sites/default/files/rnpfiles/2009-03-07Raghuram.pdf
    File Function: English Version
    Download Restriction: no
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Yazan Issa Abu Aisheh, 2021. "Lessons Learned, Barriers, and Improvement Factors for Mega Building Construction Projects in Developing Countries: Review Study," Sustainability, MDPI, vol. 13(19), pages 1-17, September.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:iim:iimawp:8315. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: the person in charge (email available below). General contact details of provider: https://edirc.repec.org/data/eciimin.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.