IDEAS home Printed from https://ideas.repec.org/p/hal/journl/hal-01710579.html
   My bibliography  Save this paper

Considering the systems engineering leading indicators to improve project performance measurement

Author

Listed:
  • Li Zheng

    (LAAS-ISI - Équipe Ingénierie Système et Intégration - LAAS - Laboratoire d'analyse et d'architecture des systèmes - UT Capitole - Université Toulouse Capitole - UT - Université de Toulouse - INSA Toulouse - Institut National des Sciences Appliquées - Toulouse - INSA - Institut National des Sciences Appliquées - UT - Université de Toulouse - UT2J - Université Toulouse - Jean Jaurès - UT - Université de Toulouse - UT3 - Université Toulouse III - Paul Sabatier - UT - Université de Toulouse - CNRS - Centre National de la Recherche Scientifique - Toulouse INP - Institut National Polytechnique (Toulouse) - UT - Université de Toulouse)

  • Claude Baron

    (LAAS-ISI - Équipe Ingénierie Système et Intégration - LAAS - Laboratoire d'analyse et d'architecture des systèmes - UT Capitole - Université Toulouse Capitole - UT - Université de Toulouse - INSA Toulouse - Institut National des Sciences Appliquées - Toulouse - INSA - Institut National des Sciences Appliquées - UT - Université de Toulouse - UT2J - Université Toulouse - Jean Jaurès - UT - Université de Toulouse - UT3 - Université Toulouse III - Paul Sabatier - UT - Université de Toulouse - CNRS - Centre National de la Recherche Scientifique - Toulouse INP - Institut National Polytechnique (Toulouse) - UT - Université de Toulouse)

  • Philippe Esteban

    (LAAS-ISI - Équipe Ingénierie Système et Intégration - LAAS - Laboratoire d'analyse et d'architecture des systèmes - UT Capitole - Université Toulouse Capitole - UT - Université de Toulouse - INSA Toulouse - Institut National des Sciences Appliquées - Toulouse - INSA - Institut National des Sciences Appliquées - UT - Université de Toulouse - UT2J - Université Toulouse - Jean Jaurès - UT - Université de Toulouse - UT3 - Université Toulouse III - Paul Sabatier - UT - Université de Toulouse - CNRS - Centre National de la Recherche Scientifique - Toulouse INP - Institut National Polytechnique (Toulouse) - UT - Université de Toulouse)

  • Rui Xue

    (LAAS-ISI - Équipe Ingénierie Système et Intégration - LAAS - Laboratoire d'analyse et d'architecture des systèmes - UT Capitole - Université Toulouse Capitole - UT - Université de Toulouse - INSA Toulouse - Institut National des Sciences Appliquées - Toulouse - INSA - Institut National des Sciences Appliquées - UT - Université de Toulouse - UT2J - Université Toulouse - Jean Jaurès - UT - Université de Toulouse - UT3 - Université Toulouse III - Paul Sabatier - UT - Université de Toulouse - CNRS - Centre National de la Recherche Scientifique - Toulouse INP - Institut National Polytechnique (Toulouse) - UT - Université de Toulouse)

  • Qiang Zhang

Abstract

With a long history in project management practices, project performance measurement (PPM) offers a wide range of methods and good practices which help project managers to effectively monitor the project and evaluate project progress and results. However, several critical issues remain, such as an unbalanced development of KPIs types or a limited availability of leading Key Performance Indicators (KPIs). On the other hand, systems engineering measurement (SEM) is a more recent discipline, with practices and theories that appeared with the emergence of the systems engineering discipline. Moreover, SEM has been much more developed with some practical research results published in several standards and guides. In particular, SEM does not only use lagging indicators, used to track how things are going but defines methods to promote leading indicators, used as precursors to the direction where the engineering is going; indeed, 18 leading indicators (LIs) were recently proposed, validated, and finally engineered in a practical guidance. Our goal being to improve project performance and success rate, one mean is to improve the project performance measurement, on which decisions rely for project management. To achieve this goal, this paper proposes to extend the project performance measurement of indicators by considering how performance is measured in systems engineering.

Suggested Citation

  • Li Zheng & Claude Baron & Philippe Esteban & Rui Xue & Qiang Zhang, 2017. "Considering the systems engineering leading indicators to improve project performance measurement," Post-Print hal-01710579, HAL.
  • Handle: RePEc:hal:journl:hal-01710579
    Note: View the original document on HAL open archive server: https://laas.hal.science/hal-01710579v1
    as

    Download full text from publisher

    File URL: https://laas.hal.science/hal-01710579v1/document
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. Donna H. Rhodes & Ricardo Valerdi & Garry J. Roedler, 2009. "Systems engineering leading indicators for assessing program and technical effectiveness," Systems Engineering, John Wiley & Sons, vol. 12(1), pages 21-35, March.
    2. Li Zheng & Claude Baron & Philippe Esteban & Rui Xue & Qiang Zhang, 2016. "Pointing out the gap between academic research and supporting software tools in the domain of the performance measurement management of engineering projects," Post-Print hal-01496409, HAL.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Li Zheng & Claude Baron & Philippe Esteban & Rui Xue & Qiang Zhang, 2017. "Mapping Systems engineering leading indicators with leading indicators in construction industry projects," Post-Print hal-01709556, HAL.
    2. Michael W. Grenn & Shahram Sarkani & Thomas Mazzuchi, 2014. "The Requirements Entropy Framework in Systems Engineering," Systems Engineering, John Wiley & Sons, vol. 17(4), pages 462-478, December.
    3. Thomas Walworth & Mike Yearworth & Laura Shrieves & Hillary Sillitto, 2016. "Estimating Project Performance through a System Dynamics Learning Model," Systems Engineering, John Wiley & Sons, vol. 19(4), pages 334-350, July.
    4. Ricardo Valerdi & Matthew Dabkowski & Indrajeet Dixit, 2015. "Reliability Improvement of Major Defense Acquisition Program Cost Estimates—Mapping DoDAF to COSYSMO," Systems Engineering, John Wiley & Sons, vol. 18(5), pages 530-547, October.
    5. Li Zheng & Claude Baron & Philippe Esteban & Rui Xue & Qiang Zhang, 2017. "A framework to improve performance measurement in engineering projects," Post-Print hal-01709535, HAL.
    6. Justin W. Eggstaff & Thomas A. Mazzuchi & Shahram Sarkani, 2014. "The Development of Progress Plans Using a Performance‐Based Expert Judgment Model to Assess Technical Performance and Risk," Systems Engineering, John Wiley & Sons, vol. 17(4), pages 375-391, December.

    More about this item

    Keywords

    KPIs; leading indicators; performance measurement; lagging indicators;
    All these keywords.

    NEP fields

    This paper has been announced in the following NEP Reports:

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hal:journl:hal-01710579. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: CCSD (email available below). General contact details of provider: https://hal.archives-ouvertes.fr/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.