IDEAS home Printed from https://ideas.repec.org/p/hal/journl/hal-00989433.html
   My bibliography  Save this paper

Finite horizon stochastic inventory problem with dual sourcing: Near myopic and heuristics bounds

Author

Listed:
  • Ali Cheaitou

    (Industrial Engineering and Management Department, College of Engineering - American University of Sharjah)

  • Christian van Delft

    (GREGH - Groupement de Recherche et d'Etudes en Gestion à HEC - HEC Paris - Ecole des Hautes Etudes Commerciales - CNRS - Centre National de la Recherche Scientifique)

Abstract

We consider a class of multi-periodic non-stationary stochastic single-product inventory planning problems where two procurement modes can be used at each period: a first order with immediate delivery and a second order with a single-period delivery delay. Clearly, the slow delivery mode is less expensive than the fast. We develop a discounted backlog model, with non-stationary procurement, inventory holding and backlog penalty costs proportional to the ordered quantities, inventory levels and number of backlogged units respectively. The demands are defined as non-stationary and independent random variables. We partially characterize the optimal ordering policy structure and we develop theoretical bounds and heuristic approximations for this optimal policy. Efficiency of these approximations is illustrated via extensive numerical experiments.

Suggested Citation

  • Ali Cheaitou & Christian van Delft, 2013. "Finite horizon stochastic inventory problem with dual sourcing: Near myopic and heuristics bounds," Post-Print hal-00989433, HAL.
  • Handle: RePEc:hal:journl:hal-00989433
    DOI: 10.1016/j.ijpe.2012.05.027
    as

    Download full text from publisher

    To our knowledge, this item is not available for download. To find whether it is available, there are three options:
    1. Check below whether another version of this item is available online.
    2. Check on the provider's web page whether it is in fact available.
    3. Perform a search for a similarly titled item that would be available.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Cheaitou, Ali & Cheaytou, Rima, 2019. "A two-stage capacity reservation supply contract with risky supplier and forecast updating," International Journal of Production Economics, Elsevier, vol. 209(C), pages 42-60.
    2. Roni, Mohammad S. & Eksioglu, Sandra D. & Jin, Mingzhou & Mamun, Saleh, 2016. "A hybrid inventory policy with split delivery under regular and surge demand," International Journal of Production Economics, Elsevier, vol. 172(C), pages 126-136.
    3. Han, Guanghua & Dong, Ming & Liu, Shaoxuan, 2014. "Yield and allocation management in a continuous make-to-stock system with demand upgrade substitution," International Journal of Production Economics, Elsevier, vol. 156(C), pages 124-131.
    4. Cheaitou, Ali & Larbi, Rim & Al Housani, Bashayer, 2019. "Decision making framework for tender evaluation and contractor selection in public organizations with risk considerations," Socio-Economic Planning Sciences, Elsevier, vol. 68(C).
    5. Svoboda, Josef & Minner, Stefan & Yao, Man, 2021. "Typology and literature review on multiple supplier inventory control models," European Journal of Operational Research, Elsevier, vol. 293(1), pages 1-23.
    6. Roni, Mohammad S. & Jin, Mingzhou & Eksioglu, Sandra D., 2015. "A hybrid inventory management system responding to regular demand and surge demand," Omega, Elsevier, vol. 52(C), pages 190-200.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:hal:journl:hal-00989433. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: CCSD (email available below). General contact details of provider: https://hal.archives-ouvertes.fr/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.