IDEAS home Printed from https://ideas.repec.org/p/enp/wpaper/eprg1617.html
   My bibliography  Save this paper

Questioning the EU Target Electricity Model – how should it be adapted to deliver the Trilemma?

Author

Listed:
  • David Newbery

    (EPRG, Cambridge)

Abstract

Britain considers the energy-only EU Target Electricity Model (TEM) wanting in delivering the trilemma of reliability, sustainability and affordability and argues that a capacity auction with long-term contracts for new entrants is the least-cost solution compared to relying on expectations of future prices to deliver adequate generation and demand side response. The Energy Union argues against feed-in tariffs (FiTs) for renewables, pressing for premium FiTs (pFiTs), just as GB has abandoned PFiTs in favour of FiTs. This paper draws on the GB experience of Electricity Market Reform before and after the 2015 change of government, to highlight promising resolutions of the energy trilemma, and the problems that have arisen between the diagnosis of the problem and the delivery of solutions. It sets out the theory and practice of delivering capacity, energy and quality of supply, gives a brief history of GB electricity from the CEGB to its current unbundled, liberalized and privatized structure. That sheds light on the trilemma problem and discusses possible solutions. The island of Ireland Single Electricity Market reforms illustrate the problem and possible answer of how best to deliver quality of service with high intermittency.
(This abstract was borrowed from another version of this item.)

Suggested Citation

  • David Newbery, 2016. "Questioning the EU Target Electricity Model – how should it be adapted to deliver the Trilemma?," Working Papers EPRG 1617, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
  • Handle: RePEc:enp:wpaper:eprg1617
    as

    Download full text from publisher

    File URL: https://www.jbs.cam.ac.uk/wp-content/uploads/2023/12/eprg-wp1617.pdf
    Download Restriction: no
    ---><---

    Other versions of this item:

    References listed on IDEAS

    as
    1. David M. Newbery, 2005. "Electricity liberalization in Britain: The quest for a satisfactory wholesale market design," The Energy Journal, International Association for Energy Economics, vol. 0(Special I), pages 43-70.
    2. Roques Fabien A. & Newbery David M. & Nuttall William J., 2005. "Investment Incentives and Electricity Market Design: the British Experience," Review of Network Economics, De Gruyter, vol. 4(2), pages 1-36, June.
    3. Fabien A. Roques & William J. Nuttall & David M. Newbery & Richard de Neufville & Stephen Connors, 2006. "Nuclear Power: A Hedge against Uncertain Gas and Carbon Prices?," The Energy Journal, , vol. 27(4), pages 1-24, October.
    4. David M. Newbery, 2012. "Reforming Competitive Electricity Markets to Meet Environmental Targets," Economics of Energy & Environmental Policy, International Association for Energy Economics, vol. 0(Number 1).
    5. Newbery, David M., 2016. "Towards a green energy economy? The EU Energy Union’s transition to a low-carbon zero subsidy electricity system – Lessons from the UK’s Electricity Market Reform," Applied Energy, Elsevier, vol. 179(C), pages 1321-1330.
    6. Newbery, David M., 1998. "The regulator's review of the English Electricity Pool," Utilities Policy, Elsevier, vol. 7(3), pages 129-141, November.
    7. David Newbery and Michael Grubb, 2015. "Security of Supply, the Role of Interconnectors and Option Values : insights from the GB Capacity Auction," Economics of Energy & Environmental Policy, International Association for Energy Economics, vol. 0(Number 2).
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Newbery, David, 2017. "Tales of two islands – Lessons for EU energy policy from electricity market reforms in Britain and Ireland," Energy Policy, Elsevier, vol. 105(C), pages 597-607.
    2. Newbery, David, 2016. "Missing money and missing markets: Reliability, capacity auctions and interconnectors," Energy Policy, Elsevier, vol. 94(C), pages 401-410.
    3. Newbery, David M., 2016. "Towards a green energy economy? The EU Energy Union’s transition to a low-carbon zero subsidy electricity system – Lessons from the UK’s Electricity Market Reform," Applied Energy, Elsevier, vol. 179(C), pages 1321-1330.
    4. Michael G. Pollitt, 2019. "The European Single Market in Electricity: An Economic Assessment," Review of Industrial Organization, Springer;The Industrial Organization Society, vol. 55(1), pages 63-87, August.
    5. David M. Newbery, 2012. "Reforming Competitive Electricity Markets to Meet Environmental Targets," Economics of Energy & Environmental Policy, International Association for Energy Economics, vol. 0(Number 1).
    6. Newbery, David & Strbac, Goran & Viehoff, Ivan, 2016. "The benefits of integrating European electricity markets," Energy Policy, Elsevier, vol. 94(C), pages 253-263.
    7. Simshauser, P., 2020. "Merchant utilities and boundaries of the firm: vertical integration in energy-only markets," Cambridge Working Papers in Economics 2039, Faculty of Economics, University of Cambridge.
    8. Pinho, Joana & Resende, Joana & Soares, Isabel, 2018. "Capacity investment in electricity markets under supply and demand uncertainty," Energy, Elsevier, vol. 150(C), pages 1006-1017.
    9. Michael Grubb & David Newbery, 2018. "UK Electricity Market Reform and the Energy Transition:Emerging Lessons," The Energy Journal, , vol. 39(6), pages 1-26, November.
    10. Hauteclocque, Adrien de & Glachant, Jean-Michel, 2009. "Long-term energy supply contracts in European competition policy: Fuzzy not crazy," Energy Policy, Elsevier, vol. 37(12), pages 5399-5407, December.
    11. David Newbery, 2021. "Strengths and weaknesses of the British market model," Chapters, in: Jean-Michel Glachant & Paul L. Joskow & Michael G. Pollitt (ed.), Handbook on Electricity Markets, chapter 6, pages 156-181, Edward Elgar Publishing.
    12. Fabien Roques & David M. Newbery & William J. Nuttall, 2004. "Generation Adequacy and Investment Incentives in Britain: from the Pool to NETA," Working Papers EP58, Energy Policy Research Group, Cambridge Judge Business School, University of Cambridge.
    13. David Newbery, 2010. "A Nuclear Future? Uk Government Policy And The Role Of The Market," Economic Affairs, Wiley Blackwell, vol. 30(2), pages 21-27, June.
    14. David Newbery and Michael Grubb, 2015. "Security of Supply, the Role of Interconnectors and Option Values : insights from the GB Capacity Auction," Economics of Energy & Environmental Policy, International Association for Energy Economics, vol. 0(Number 2).
    15. Glachant, Jean-Michel, 2016. "Tacking stock of the EU “Power Target Model”… and steering its future course," Energy Policy, Elsevier, vol. 96(C), pages 673-679.
    16. Milstein, Irena & Tishler, Asher, 2012. "The inevitability of capacity underinvestment in competitive electricity markets," Energy Economics, Elsevier, vol. 34(1), pages 62-77.
    17. Tishler, Asher & Milstein, Irena & Woo, Chi-Keung, 2008. "Capacity commitment and price volatility in a competitive electricity market," Energy Economics, Elsevier, vol. 30(4), pages 1625-1647, July.
    18. Chamorro, José M. & Abadie, Luis M. & de Neufville, Richard & Ilić, Marija, 2012. "Market-based valuation of transmission network expansion. A heuristic application in GB," Energy, Elsevier, vol. 44(1), pages 302-320.
    19. Wang, Nan & Mogi, Gento, 2017. "Deregulation, market competition, and innovation of utilities: Evidence from Japanese electric sector," Energy Policy, Elsevier, vol. 111(C), pages 403-413.
    20. Safarzynska, Karolina & van den Bergh, Jeroen C.J.M., 2011. "Industry evolution, rational agents and the transition to sustainable electricity production," Energy Policy, Elsevier, vol. 39(10), pages 6440-6452, October.

    More about this item

    Keywords

    Reliability; sustainability and affordability; capacity auctions; contract design; renewables;
    All these keywords.

    JEL classification:

    • D47 - Microeconomics - - Market Structure, Pricing, and Design - - - Market Design
    • H23 - Public Economics - - Taxation, Subsidies, and Revenue - - - Externalities; Redistributive Effects; Environmental Taxes and Subsidies
    • L94 - Industrial Organization - - Industry Studies: Transportation and Utilities - - - Electric Utilities
    • Q48 - Agricultural and Natural Resource Economics; Environmental and Ecological Economics - - Energy - - - Government Policy
    • Q54 - Agricultural and Natural Resource Economics; Environmental and Ecological Economics - - Environmental Economics - - - Climate; Natural Disasters and their Management; Global Warming

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:enp:wpaper:eprg1617. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Ruth Newman (email available below). General contact details of provider: https://edirc.repec.org/data/jicamuk.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.