IDEAS home Printed from https://ideas.repec.org/p/arx/papers/1708.07305.html
   My bibliography  Save this paper

Optimal firm's policy under lead time-and price-dependent demand: interest of customers rejection policy

Author

Listed:
  • Abduh Sayid

    (G-SCOP\_GCSP)

  • Yannick Frein

    (G-SCOP\_GCSP)

  • Ramzi Hammami

Abstract

Considering a lead-time-and price-sensitive demand, we investigate whether a client rejection policy, modeled as M/M/1/K system, can be more profitable than an all-client acceptance policy, modeled as M/M/1 system. We provide analytical insights for the cases with and without holding and penalty costs by comparing M/M/1/1 to M/M/1 models.

Suggested Citation

  • Abduh Sayid & Yannick Frein & Ramzi Hammami, 2017. "Optimal firm's policy under lead time-and price-dependent demand: interest of customers rejection policy," Papers 1708.07305, arXiv.org.
  • Handle: RePEc:arx:papers:1708.07305
    as

    Download full text from publisher

    File URL: http://arxiv.org/pdf/1708.07305
    File Function: Latest version
    Download Restriction: no
    ---><---

    References listed on IDEAS

    as
    1. So, Kut C. & Song, Jing-Sheng, 1998. "Price, delivery time guarantees and capacity selection," European Journal of Operational Research, Elsevier, vol. 111(1), pages 28-49, November.
    2. Liming Liu & Mahmut Parlar & Stuart X. Zhu, 2007. "Pricing and Lead Time Decisions in Decentralized Supply Chains," Management Science, INFORMS, vol. 53(5), pages 713-725, May.
    3. Abduh Sayid Albana & Yannick Frein & Ramzi Hammami, 2016. "Study of Client Reject Policies under Lead-Time and Price Dependent Demand," Working Papers hal-01250835, HAL.
    4. Roman Kapuscinski & Sridhar Tayur, 2007. "Reliable Due-Date Setting in a Capacitated MTO System with Two Customer Classes," Operations Research, INFORMS, vol. 55(1), pages 56-74, February.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Abduh Sayid & Yannick Frein & Ramzi Hammami, 2016. "Optimal firm's policy under lead time-and price-dependent demand: interest of customers rejection policy," Post-Print hal-01576828, HAL.
    2. Abduh Sayid Albana & Yannick Frein & Ramzi Hammami, 2016. "Study of Client Reject Policies under Lead-Time and Price Dependent Demand," Working Papers hal-01250835, HAL.
    3. Gökçe Kahveciog̃lu & Barış Balcıog̃lu, 2016. "Coping with production time variability via dynamic lead-time quotation," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 38(4), pages 877-898, October.
    4. Zhai, Yue & Hua, Guowei & Cheng, Meng & Cheng, T.C.E., 2023. "Production lead-time hedging and order allocation in an MTO supply chain," European Journal of Operational Research, Elsevier, vol. 311(3), pages 887-905.
    5. Hu, Yinan & Guan, Yongpei & Liu, Tieming, 2011. "Lead-time hedging and coordination between manufacturing and sales departments using Nash and Stackelberg games," European Journal of Operational Research, Elsevier, vol. 210(2), pages 231-240, April.
    6. Xiao, Tiaojun & Choi, Tsan-Ming & Cheng, T.C.E., 2016. "Delivery leadtime and channel structure decisions for make-to-order duopoly under different game scenarios," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 87(C), pages 113-129.
    7. Hammami, Ramzi & Frein, Yannick & Nouira, Imen & Albana, Abduh-Sayid, 2022. "On the interplay between local lead times, overall lead time, prices, and profits in decentralized supply chains," International Journal of Production Economics, Elsevier, vol. 243(C).
    8. A. Baykal Hafızoğlu & Esma S. Gel & Pınar Keskinocak, 2016. "Price and Lead Time Quotation for Contract and Spot Customers," Operations Research, INFORMS, vol. 64(2), pages 406-415, April.
    9. Noori-Daryan, Mahsa & Taleizadeh, Ata Allah & Jolai, Fariborz, 2019. "Analyzing pricing, promised delivery lead time, supplier-selection, and ordering decisions of a multi-national supply chain under uncertain environment," International Journal of Production Economics, Elsevier, vol. 209(C), pages 236-248.
    10. Jiangtao Wang & Yina Li & Fei Ye & Quan Chen, 2017. "Optimal introduction time decision for holiday products with uncertain market demand," International Journal of Production Research, Taylor & Francis Journals, vol. 55(1), pages 161-175, January.
    11. Wang, Fan & Zhuo, Xiaopo & Niu, Baozhuang, 2017. "Strategic entry to regional air cargo market under joint competition of demand and promised delivery time," Transportation Research Part B: Methodological, Elsevier, vol. 104(C), pages 317-336.
    12. Zhao, Jing & Zhang, Qin, 2021. "The effect of contract methods on the lead time of a two-level photovoltaic supply chain: revenue-sharing vs. cost-sharing," Energy, Elsevier, vol. 231(C).
    13. Zhu, Stuart X., 2015. "Integration of capacity, pricing, and lead-time decisions in a decentralized supply chain," International Journal of Production Economics, Elsevier, vol. 164(C), pages 14-23.
    14. Ramzi Hammami & Yannick Frein & Abduh Albana, 2020. "Delivery time quotation and pricing in two-stage supply chains: Centralized decision-making with global and local managerial approaches," Post-Print hal-02898219, HAL.
    15. Seçil Savaşaneril & Paul M. Griffin & Pınar Keskinocak, 2010. "Dynamic Lead-Time Quotation for an M/M/1 Base-Stock Inventory Queue," Operations Research, INFORMS, vol. 58(2), pages 383-395, April.
    16. Niu, Baozhuang & Liu, Jiayun & Zhang, Jianhua & Chen, Kanglin, 2024. "Promised-delivery-time-driven reselling facing global platform's private label competition: Game analysis and data validation," Omega, Elsevier, vol. 123(C).
    17. Sharafali, Moosa & Tarakci, Hakan & Kulkarni, Shailesh & Razack Shahul Hameed, Raja Abdul, 2019. "Optimal delivery due date for a supplier with an unreliable machine under outsourced maintenance," International Journal of Production Economics, Elsevier, vol. 208(C), pages 53-68.
    18. Jiejian Feng & Liming Liu & Xiaoming Liu, 2011. "TECHNICAL NOTE---An Optimal Policy for Joint Dynamic Price and Lead-Time Quotation," Operations Research, INFORMS, vol. 59(6), pages 1523-1527, December.
    19. Kuthambalayan, Thyagaraj S. & Mehta, Peeyush & Shanker, Kripa, 2014. "Integrating operations and marketing decisions using delayed differentiation of products and guaranteed delivery time under stochastic demand," European Journal of Operational Research, Elsevier, vol. 237(2), pages 617-627.
    20. Niu, Baozhuang & Dai, Zhipeng & Zhuo, Xiaopo, 2019. "Co-opetition effect of promised-delivery-time sensitive demand on air cargo carriers’ big data investment and demand signal sharing decisions," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 123(C), pages 29-44.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:arx:papers:1708.07305. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: arXiv administrators (email available below). General contact details of provider: http://arxiv.org/ .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.