Efficient multi-product multi-BOM batch scheduling for a petrochemical blending plant with a shared pipeline network
Author
Abstract
Suggested Citation
Download full text from publisher
References listed on IDEAS
- Kopanos, Georgios M. & Méndez, Carlos A. & Puigjaner, Luis, 2010. "MIP-based decomposition strategies for large-scale scheduling problems in multiproduct multistage batch plants: A benchmark scheduling problem of the pharmaceutical industry," European Journal of Operational Research, Elsevier, vol. 207(2), pages 644-655, December.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Velez, Sara & Dong, Yachao & Maravelias, Christos T., 2017. "Changeover formulations for discrete-time mixed-integer programming scheduling models," European Journal of Operational Research, Elsevier, vol. 260(3), pages 949-963.
- Miloš Milenković & Susana Val & Nebojša Bojović, 2023. "Simultaneous lot sizing and scheduling in the animal feed premix industry," Operational Research, Springer, vol. 23(2), pages 1-40, June.
- Tom Rihm & Philipp Baumann, 2018. "Staff assignment with lexicographically ordered acceptance levels," Journal of Scheduling, Springer, vol. 21(2), pages 167-189, April.
- Leachman, Robert C. & Johnston, Lenrick & Li, Shan & Shen, Zuo-Jun, 2014. "An automated planning engine for biopharmaceutical production," European Journal of Operational Research, Elsevier, vol. 238(1), pages 327-338.
- Sankaranarayanan, Sriram & Feijoo, Felipe & Siddiqui, Sauleh, 2018. "Sensitivity and covariance in stochastic complementarity problems with an application to North American natural gas markets," European Journal of Operational Research, Elsevier, vol. 268(1), pages 25-36.
- Baumann, Philipp & Trautmann, Norbert, 2014. "A hybrid method for large-scale short-term scheduling of make-and-pack production processes," European Journal of Operational Research, Elsevier, vol. 236(2), pages 718-735.
- Dirk Briskorn & Philipp Zeise, 2019. "A cyclic production scheme for the synchronized and integrated two-level lot-sizing and scheduling problem with no-wait restrictions and stochastic demand," OR Spectrum: Quantitative Approaches in Management, Springer;Gesellschaft für Operations Research e.V., vol. 41(4), pages 895-942, December.
More about this item
Keywords
batch scheduling; chemical blending plant; heuristic;All these keywords.
NEP fields
This paper has been announced in the following NEP Reports:- NEP-CMP-2015-01-31 (Computational Economics)
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:ant:wpaper:2014032. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Joeri Nys (email available below). General contact details of provider: https://edirc.repec.org/data/ftufsbe.html .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.