IDEAS home Printed from https://ideas.repec.org/h/spr/mgmchp/978-3-030-96725-3_11.html
   My bibliography  Save this book chapter

Case 7: California High Speed Rail Project

In: Project Finance

Author

Listed:
  • B Rajesh Kumar

    (Institute of Management Technology)

Abstract

California High Speed Rail (CAHSR or CHSR) is a publicly funded high speed rail system which is under construction in the US State of California. The system is planned to run from San Francisco to the Los Angeles basin under three hours with speeds of over 200 miles per hour. CHSR in its pathway will connect Anaheim Regional Transportation Intermodal center in Anaheim and Union Station in Downtown Los Angeles with the Salesforce Transit Center in San Francisco via the Central Valley. The system will eventually extend to Sacramento and San Diego covering 800 miles with 24 stations. In order to meet the transportation needs of the modern century, the High Speed Rail Authority have plans to invest billions of dollars in local and regional rail lines. California high speed rail system is aimed to connect the mega regions of the California state and make immense contribution to the economic development of the region in a sustainable environmental context. The aim is also to create jobs and preserve agricultural and protected land. The project is owned and managed by the State of California though the California High Speed Rail Authority (CHSRA). The CAHSRA was established by an act of the California State Legislature and was delegated to present a high speed rail plan. The plan termed Proposition 1 A was approved in the year 2008. Approximately $9 billion bond was issued for the construction of the first leg of the project. The California high speed rail system will connect 8 of the 10 largest cities in the State of California. California’ corridors are among the busiest in the nation with 5.7 million people using train services in 2020. The system is designed in such a way that in blended or shared corridors, trains will be slowed to 110 miles per hour as per regulations and in other areas the train speed will reach 220 miles per hour. High speed rail will be run on 100 per cent renewable electric energy. In 2008, the project was estimated to cost $40 billion. Electrified high-speed trains traveling at speeds of more than 200 miles per hour will connect California’s cities, making a trip between Los Angeles and San Francisco in under three hours.

Suggested Citation

  • B Rajesh Kumar, 2022. "Case 7: California High Speed Rail Project," Management for Professionals, in: Project Finance, chapter 11, pages 123-129, Springer.
  • Handle: RePEc:spr:mgmchp:978-3-030-96725-3_11
    DOI: 10.1007/978-3-030-96725-3_11
    as

    Download full text from publisher

    To our knowledge, this item is not available for download. To find whether it is available, there are three options:
    1. Check below whether another version of this item is available online.
    2. Check on the provider's web page whether it is in fact available.
    3. Perform a search for a similarly titled item that would be available.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:mgmchp:978-3-030-96725-3_11. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.