IDEAS home Printed from https://ideas.repec.org/h/spr/isochp/978-1-4419-8191-2_2.html
   My bibliography  Save this book chapter

Production Planning and Scheduling: Interaction and Coordination

In: Planning Production and Inventories in the Extended Enterprise

Author

Listed:
  • Yiwei Cai
  • Erhan Kutanoglu

    (The University of Texas at Austin)

  • John Hasenbein

Abstract

In many organizations, production planning is part of a hierarchical planning, capacity/resource allocation, scheduling and control framework. The production plan considers resource capacities, time periods, supply and demand over a reasonably long planning horizon at a high level. Its decision then forms the input to the more detailed, shorter-term functions such as scheduling and control at the lower level, which usually have more accurate estimates of supply, demand, and capacity levels. Hence, interaction between production planning and production scheduling/control is inevitable, not only because the scheduling/control decisions are constrained by the planning decisions, but also because disruptions occurring in the execution/control stage (usually after schedule generation) may affect the optimality and/or feasibility of both the plan and the schedule. If the overall performance of the production system is to be improved, disruptions must be managed effectively, with careful consideration of both planning and scheduling decisions. This chapter focuses on the interaction between production planning and scheduling, emphasizing the coordination of decisions, with special emphasis on making robust decisions at both levels in the face of unexpected disruptions. We provide examples and realistic scenarios from semiconductor manufacturing.

Suggested Citation

  • Yiwei Cai & Erhan Kutanoglu & John Hasenbein, 2011. "Production Planning and Scheduling: Interaction and Coordination," International Series in Operations Research & Management Science, in: Karl G Kempf & Pınar Keskinocak & Reha Uzsoy (ed.), Planning Production and Inventories in the Extended Enterprise, chapter 0, pages 15-42, Springer.
  • Handle: RePEc:spr:isochp:978-1-4419-8191-2_2
    DOI: 10.1007/978-1-4419-8191-2_2
    as

    Download full text from publisher

    To our knowledge, this item is not available for download. To find whether it is available, there are three options:
    1. Check below whether another version of this item is available online.
    2. Check on the provider's web page whether it is in fact available.
    3. Perform a search for a similarly titled item that would be available.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Batur, Demet & Bekki, Jennifer M. & Chen, Xi, 2018. "Quantile regression metamodeling: Toward improved responsiveness in the high-tech electronics manufacturing industry," European Journal of Operational Research, Elsevier, vol. 264(1), pages 212-224.
    2. Phillip O. Kriett & Sebastian Eirich & Martin Grunow, 2017. "Cycle time-oriented mid-term production planning for semiconductor wafer fabrication," International Journal of Production Research, Taylor & Francis Journals, vol. 55(16), pages 4662-4679, August.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:isochp:978-1-4419-8191-2_2. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.