IDEAS home Printed from https://ideas.repec.org/a/wsi/ijmpcx/v17y2006i06ns0129183106009357.html
   My bibliography  Save this article

Explicit Eighth Order Two-Step Methods With Nine Stages For Integrating Oscillatory Problems

Author

Listed:
  • Ch. TSITOURAS

    (Department of Applied Sciences, TEI of Chalkis, GR34400, Psahna, Greece)

Abstract

We present a new explicit hybrid two step method for the solution of second order initial value problem. It costs only nine function evaluations per step and attains eighth algebraic order so it is the cheapest in the literature. Its coefficients are chosen to reduce amplification and phase errors. Thus the method is well suited for facing problems with oscillatory solutions. After implementing a MATLAB program, we proceed with numerical tests that justify our effort.

Suggested Citation

  • Ch. TSITOURAS, 2006. "Explicit Eighth Order Two-Step Methods With Nine Stages For Integrating Oscillatory Problems," International Journal of Modern Physics C (IJMPC), World Scientific Publishing Co. Pte. Ltd., vol. 17(06), pages 861-876.
  • Handle: RePEc:wsi:ijmpcx:v:17:y:2006:i:06:n:s0129183106009357
    DOI: 10.1142/S0129183106009357
    as

    Download full text from publisher

    File URL: http://www.worldscientific.com/doi/abs/10.1142/S0129183106009357
    Download Restriction: Access to full text is restricted to subscribers

    File URL: https://libkey.io/10.1142/S0129183106009357?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Ramachandran K, 1996. "Strategies of Technology Intensive Firms," IIMA Working Papers WP1996-02-01_01372, Indian Institute of Management Ahmedabad, Research and Publication Department.
    2. anonymous, 1996. "The changing rural economy of the Midwest," Assessing the Midwest Economy 3, Federal Reserve Bank of Chicago.
    3. R. J. M. Vaessens & E. H. L. Aarts & J. K. Lenstra, 1996. "Job Shop Scheduling by Local Search," INFORMS Journal on Computing, INFORMS, vol. 8(3), pages 302-317, August.
    4. Birdsall, Nancy & Deosaran, Ramesh & Tincani, Amos & Suárez, Elena M. & Lewis, David E. & Bloomfield, Richard J. & Rajapatirana, Sarath & Serbin, Andrés & Henrikson, Alan K. & Skeete, Charles A.T. & R, 1996. "Choices and Change: Reflections on the Caribbean," IDB Publications (Books), Inter-American Development Bank, number 233, June.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Tsitouras, Ch., 2014. "On fitted modifications of Runge–Kutta–Nyström pairs," Applied Mathematics and Computation, Elsevier, vol. 232(C), pages 416-423.
    2. Vladislav N. Kovalnogov & Ruslan V. Fedorov & Tamara V. Karpukhina & Theodore E. Simos & Charalampos Tsitouras, 2021. "Sixth Order Numerov-Type Methods with Coefficients Trained to Perform Best on Problems with Oscillating Solutions," Mathematics, MDPI, vol. 9(21), pages 1-12, October.
    3. Vladislav N. Kovalnogov & Ruslan V. Fedorov & Andrey V. Chukalin & Theodore E. Simos & Charalampos Tsitouras, 2021. "Eighth Order Two-Step Methods Trained to Perform Better on Keplerian-Type Orbits," Mathematics, MDPI, vol. 9(23), pages 1-19, November.
    4. Higinio Ramos & Ridwanulahi Abdulganiy & Ruth Olowe & Samuel Jator, 2021. "A Family of Functionally-Fitted Third Derivative Block Falkner Methods for Solving Second-Order Initial-Value Problems with Oscillating Solutions," Mathematics, MDPI, vol. 9(7), pages 1-22, March.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Helena Ramalhinho-Lourenço & Olivier C. Martin & Thomas Stützle, 2000. "Iterated local search," Economics Working Papers 513, Department of Economics and Business, Universitat Pompeu Fabra.
    2. Shiu-Sheng Chen & Tsong-Min Wu, 2010. "Taiwan'S Exchange Rate And Macroeconomic Policies Over The Business Cycle," The Singapore Economic Review (SER), World Scientific Publishing Co. Pte. Ltd., vol. 55(03), pages 435-457.
    3. Rego, César & Duarte, Renato, 2009. "A filter-and-fan approach to the job shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 194(3), pages 650-662, May.
    4. Bürgy, Reinhard & Bülbül, Kerem, 2018. "The job shop scheduling problem with convex costs," European Journal of Operational Research, Elsevier, vol. 268(1), pages 82-100.
    5. Jain, A. S. & Meeran, S., 1999. "Deterministic job-shop scheduling: Past, present and future," European Journal of Operational Research, Elsevier, vol. 113(2), pages 390-434, March.
    6. Raaymakers, W. H. M. & Hoogeveen, J. A., 2000. "Scheduling multipurpose batch process industries with no-wait restrictions by simulated annealing," European Journal of Operational Research, Elsevier, vol. 126(1), pages 131-151, October.
    7. El-Bouri, A. & Azizi, N. & Zolfaghari, S., 2007. "A comparative study of a new heuristic based on adaptive memory programming and simulated annealing: The case of job shop scheduling," European Journal of Operational Research, Elsevier, vol. 177(3), pages 1894-1910, March.
    8. F. Guerriero, 2008. "Hybrid Rollout Approaches for the Job Shop Scheduling Problem," Journal of Optimization Theory and Applications, Springer, vol. 139(2), pages 419-438, November.
    9. Alexander Rizzo & Heather Fulford, 2012. "Understanding Small Business Strategy: A Grounded Theory Study On Small Firms In The E.U. State Of Malta," Journal of Enterprising Culture (JEC), World Scientific Publishing Co. Pte. Ltd., vol. 20(03), pages 287-332.
    10. Renaud Redien-Collot, 2009. "Female Entrepreneurs' Authority: Is The Creative Aspect Of Authority A Masculine Fiction In Managerial And Entrepreneurial Paradigms?," Journal of Enterprising Culture (JEC), World Scientific Publishing Co. Pte. Ltd., vol. 17(04), pages 419-441.
    11. Tarantilis, C. D. & Kiranoudis, C. T., 2002. "A list-based threshold accepting method for job shop scheduling problems," International Journal of Production Economics, Elsevier, vol. 77(2), pages 159-171, May.
    12. Murovec, Bostjan & Suhel, Peter, 2004. "A repairing technique for the local search of the job-shop problem," European Journal of Operational Research, Elsevier, vol. 153(1), pages 220-238, February.
    13. P M E Shutler, 2003. "A priority list based heuristic for the job shop problem," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(6), pages 571-584, June.
    14. Groflin, Heinz & Klinkert, Andreas, 2007. "Feasible insertions in job shop scheduling, short cycles and stable sets," European Journal of Operational Research, Elsevier, vol. 177(2), pages 763-785, March.
    15. Guanxiao Qi & Hongbin Huang & Haijun Wang, 2007. "Size Instabilities In The Ring And Linear Arrays Of Chaotic Systems," Advances in Complex Systems (ACS), World Scientific Publishing Co. Pte. Ltd., vol. 10(03), pages 301-313.
    16. Buscher, Udo & Shen, Liji, 2009. "An integrated tabu search algorithm for the lot streaming problem in job shops," European Journal of Operational Research, Elsevier, vol. 199(2), pages 385-399, December.
    17. Steinhofel, K. & Albrecht, A. & Wong, C. K., 1999. "Two simulated annealing-based heuristics for the job shop scheduling problem," European Journal of Operational Research, Elsevier, vol. 118(3), pages 524-548, November.
    18. Paul M E Shutler, 2004. "A priority list based heuristic for the job shop problem: part 2 tabu search," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 55(7), pages 780-784, July.
    19. Brailsford, Sally C. & Potts, Chris N. & Smith, Barbara M., 1999. "Constraint satisfaction problems: Algorithms and applications," European Journal of Operational Research, Elsevier, vol. 119(3), pages 557-581, December.
    20. Giuseppe Lancia & Franca Rinaldi & Paolo Serafini, 2011. "A time-indexed LP-based approach for min-sum job-shop problems," Annals of Operations Research, Springer, vol. 186(1), pages 175-198, June.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wsi:ijmpcx:v:17:y:2006:i:06:n:s0129183106009357. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Tai Tone Lim (email available below). General contact details of provider: http://www.worldscinet.com/ijmpc/ijmpc.shtml .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.