Why projects often fail, even with high cost‐contingencies

Author

Listed:
  • Edouard Kujawski

Abstract

In this note we assume that the individual risks have been adequately quantified and the total project cost contingency adequately computed to ensure an agreed‐to probability or confidence level that the total project cost estimate will not be exceeded. But even projects that implement such a process are likely to result in significant cost overruns and/or project failure if the project manager allocates the contingencies to the individual subsystems. The intuitive and mathematically valid solution is to maintain a project‐wide contingency and to distribute it to the individual risks on an as‐needed basis. Such an approach ensures cost‐efficient risk management, and projects that implement it are more likely to succeed and to cost less. We illustrate these ideas using a simplified project with two independent risks. The formulation can readily be extended to multiple risks. © 2002 Wiley Periodicals, Inc. Syst Eng 5: 151–155, 2002

Suggested Citation

  • Edouard Kujawski, 2002. "Why projects often fail, even with high cost‐contingencies," Systems Engineering, John Wiley & Sons, vol. 5(2), pages 151-155.
  • Handle: RePEc:wly:syseng:v:5:y:2002:i:2:p:151-155
    DOI: 10.1002/sys.10006
    as

    Download full text from publisher

    File URL: https://doi.org/10.1002/sys.10006
    Download Restriction: no

    File URL: https://libkey.io/10.1002/sys.10006?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Edouard Kujawski, 2002. "Selection of technical risk responses for efficient contingencies," Systems Engineering, John Wiley & Sons, vol. 5(3), pages 194-212.
    2. Alan B. Marchant, 2010. "Obstacles to the flow of requirements verification," Systems Engineering, John Wiley & Sons, vol. 13(1), pages 1-13, March.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:syseng:v:5:y:2002:i:2:p:151-155. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6858 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.