Transporting jobs through a two‐machine open shop
Author
Abstract
Suggested Citation
DOI: 10.1002/nav.20323
Download full text from publisher
References listed on IDEAS
- Yuan, Jinjiang & Soukhal, Ameur & Chen, Youjun & Lu, Lingfa, 2007. "A note on the complexity of flow shop scheduling with transportation constraints," European Journal of Operational Research, Elsevier, vol. 178(3), pages 918-925, May.
- Soukhal, A. & Oulamara, A. & Martineau, P., 2005. "Complexity of flow shop scheduling problems with transportation constraints," European Journal of Operational Research, Elsevier, vol. 161(1), pages 32-41, February.
- C.A. Glass & C.N. Potts & V.A. Strusevich, 2001. "Scheduling Batches with Sequential Job Processing for Two-Machine Flow and Open Shops," INFORMS Journal on Computing, INFORMS, vol. 13(2), pages 120-137, May.
- Yves Crama & Joris van de Klundert, 1997. "Cyclic Scheduling of Identical Parts in a Robotic Cell," Operations Research, INFORMS, vol. 45(6), pages 952-965, December.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Hosseini, Amir & Otto, Alena & Pesch, Erwin, 2024. "Scheduling in manufacturing with transportation: Classification and solution techniques," European Journal of Operational Research, Elsevier, vol. 315(3), pages 821-843.
- Hans Kellerer & Alan J. Soper & Vitaly A. Strusevich, 2013. "Preemptive scheduling on two identical parallel machines with a single transporter," Journal of Combinatorial Optimization, Springer, vol. 25(2), pages 279-307, February.
- Ahmadian, Mohammad Mahdi & Khatami, Mostafa & Salehipour, Amir & Cheng, T.C.E., 2021. "Four decades of research on the open-shop scheduling problem to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 295(2), pages 399-426.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Ullrich, Christian A., 2013. "Integrated machine scheduling and vehicle routing with time windows," European Journal of Operational Research, Elsevier, vol. 227(1), pages 152-165.
- Zhi-Long Chen, 2010. "Integrated Production and Outbound Distribution Scheduling: Review and Extensions," Operations Research, INFORMS, vol. 58(1), pages 130-148, February.
- Hall, Nicholas G. & Kamoun, Hichem & Sriskandarajah, Chelliah, 1998. "Scheduling in robotic cells: Complexity and steady state analysis," European Journal of Operational Research, Elsevier, vol. 109(1), pages 43-65, August.
- Jason Pan & Chi-Shiang Su, 2015. "Two parallel machines problem with job delivery coordination and availability constraint," Annals of Operations Research, Springer, vol. 235(1), pages 653-664, December.
- Neil Geismar, H. & Dawande, Milind & Sriskandarajah, Chelliah, 2005. "Approximation algorithms for k-unit cyclic solutions in robotic cells," European Journal of Operational Research, Elsevier, vol. 162(2), pages 291-309, April.
- Shen, Liji & Buscher, Udo, 2012. "Solving the serial batching problem in job shop manufacturing systems," European Journal of Operational Research, Elsevier, vol. 221(1), pages 14-26.
- Brauner, Nadia & Finke, Gerd, 2001. "Optimal moves of the material handling system in a robotic cell," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 269-277, December.
- Xin Li & Richard Y. K. Fung, 2016. "Optimal K-unit cycle scheduling of two-cluster tools with residency constraints and general robot moving times," Journal of Scheduling, Springer, vol. 19(2), pages 165-176, April.
- C N Potts & V A Strusevich, 2009. "Fifty years of scheduling: a survey of milestones," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 60(1), pages 41-68, May.
- Yuan, Jinjiang & Soukhal, Ameur & Chen, Youjun & Lu, Lingfa, 2007. "A note on the complexity of flow shop scheduling with transportation constraints," European Journal of Operational Research, Elsevier, vol. 178(3), pages 918-925, May.
- Esswein, Carl & Billaut, Jean-Charles & Strusevich, Vitaly A., 2005. "Two-machine shop scheduling: Compromise between flexibility and makespan value," European Journal of Operational Research, Elsevier, vol. 167(3), pages 796-809, December.
- Vis, Iris F.A., 2006. "Survey of research in the design and control of automated guided vehicle systems," European Journal of Operational Research, Elsevier, vol. 170(3), pages 677-709, May.
- B. Lin & T. Cheng, 2005. "Two-Machine Flowshop Batching and Scheduling," Annals of Operations Research, Springer, vol. 133(1), pages 149-161, January.
- Lushchakova, Irina N. & Strusevich, Vitaly A., 2010. "Scheduling incompatible tasks on two machines," European Journal of Operational Research, Elsevier, vol. 200(2), pages 334-346, January.
- Milind Dawande & Chelliah Sriskandarajah & Suresh Sethi, 2002. "On Throughput Maximization in Constant Travel-Time Robotic Cells," Manufacturing & Service Operations Management, INFORMS, vol. 4(4), pages 296-312, August.
- Gur Mosheiov & Daniel Oron, 2011. "Batch scheduling on a two‐machine jobshop with machine‐dependent setup times," Naval Research Logistics (NRL), John Wiley & Sons, vol. 58(7), pages 676-684, October.
- Drobouchevitch, Inna G. & Sethi, Suresh P. & Sriskandarajah, Chelliah, 2006. "Scheduling dual gripper robotic cell: One-unit cycles," European Journal of Operational Research, Elsevier, vol. 171(2), pages 598-631, June.
- Tharanga Rajapakshe & Milind Dawande & Chelliah Sriskandarajah, 2011. "Quantifying the Impact of Layout on Productivity: An Analysis from Robotic-Cell Manufacturing," Operations Research, INFORMS, vol. 59(2), pages 440-454, April.
- Mohammad Reza Komari Alaei & Mehmet Soysal & Atabak Elmi & Audrius Banaitis & Nerija Banaitiene & Reza Rostamzadeh & Shima Javanmard, 2021. "A Bender’s Algorithm of Decomposition Used for the Parallel Machine Problem of Robotic Cell," Mathematics, MDPI, vol. 9(15), pages 1-15, July.
- Kovalyov, M. Y. & Potts, C. N. & Strusevich, V. A., 2004. "Batching decisions for assembly production systems," European Journal of Operational Research, Elsevier, vol. 157(3), pages 620-642, September.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:56:y:2009:i:1:p:1-18. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.