IDEAS home Printed from https://ideas.repec.org/a/wly/navres/v56y2009i1p1-18.html
   My bibliography  Save this article

Transporting jobs through a two‐machine open shop

Author

Listed:
  • Irina N. Lushchakova
  • Alan J. Soper
  • Vitaly A. Strusevich

Abstract

We consider the two‐machine open shop scheduling problem in which the jobs are brought to the system by a single transporter and moved between the processing machines by the same transporter. The purpose is to split the jobs into batches and to find the sequence of moves of the transporter so that the time by which the completed jobs are collected together on board the transporter is minimal. We present a $ {7 \over 5} $‐approximation algorithm. © 2008 Wiley Periodicals, Inc. Naval Research Logistics 2009

Suggested Citation

  • Irina N. Lushchakova & Alan J. Soper & Vitaly A. Strusevich, 2009. "Transporting jobs through a two‐machine open shop," Naval Research Logistics (NRL), John Wiley & Sons, vol. 56(1), pages 1-18, February.
  • Handle: RePEc:wly:navres:v:56:y:2009:i:1:p:1-18
    DOI: 10.1002/nav.20323
    as

    Download full text from publisher

    File URL: https://doi.org/10.1002/nav.20323
    Download Restriction: no

    File URL: https://libkey.io/10.1002/nav.20323?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Yuan, Jinjiang & Soukhal, Ameur & Chen, Youjun & Lu, Lingfa, 2007. "A note on the complexity of flow shop scheduling with transportation constraints," European Journal of Operational Research, Elsevier, vol. 178(3), pages 918-925, May.
    2. Soukhal, A. & Oulamara, A. & Martineau, P., 2005. "Complexity of flow shop scheduling problems with transportation constraints," European Journal of Operational Research, Elsevier, vol. 161(1), pages 32-41, February.
    3. C.A. Glass & C.N. Potts & V.A. Strusevich, 2001. "Scheduling Batches with Sequential Job Processing for Two-Machine Flow and Open Shops," INFORMS Journal on Computing, INFORMS, vol. 13(2), pages 120-137, May.
    4. Yves Crama & Joris van de Klundert, 1997. "Cyclic Scheduling of Identical Parts in a Robotic Cell," Operations Research, INFORMS, vol. 45(6), pages 952-965, December.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Hans Kellerer & Alan J. Soper & Vitaly A. Strusevich, 2013. "Preemptive scheduling on two identical parallel machines with a single transporter," Journal of Combinatorial Optimization, Springer, vol. 25(2), pages 279-307, February.
    2. Ahmadian, Mohammad Mahdi & Khatami, Mostafa & Salehipour, Amir & Cheng, T.C.E., 2021. "Four decades of research on the open-shop scheduling problem to minimize the makespan," European Journal of Operational Research, Elsevier, vol. 295(2), pages 399-426.
    3. Hosseini, Amir & Otto, Alena & Pesch, Erwin, 2024. "Scheduling in manufacturing with transportation: Classification and solution techniques," European Journal of Operational Research, Elsevier, vol. 315(3), pages 821-843.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Ullrich, Christian A., 2013. "Integrated machine scheduling and vehicle routing with time windows," European Journal of Operational Research, Elsevier, vol. 227(1), pages 152-165.
    2. Zhi-Long Chen, 2010. "Integrated Production and Outbound Distribution Scheduling: Review and Extensions," Operations Research, INFORMS, vol. 58(1), pages 130-148, February.
    3. Jason Pan & Chi-Shiang Su, 2015. "Two parallel machines problem with job delivery coordination and availability constraint," Annals of Operations Research, Springer, vol. 235(1), pages 653-664, December.
    4. Shen, Liji & Buscher, Udo, 2012. "Solving the serial batching problem in job shop manufacturing systems," European Journal of Operational Research, Elsevier, vol. 221(1), pages 14-26.
    5. Brauner, Nadia & Finke, Gerd, 2001. "Optimal moves of the material handling system in a robotic cell," International Journal of Production Economics, Elsevier, vol. 74(1-3), pages 269-277, December.
    6. Xin Li & Richard Y. K. Fung, 2016. "Optimal K-unit cycle scheduling of two-cluster tools with residency constraints and general robot moving times," Journal of Scheduling, Springer, vol. 19(2), pages 165-176, April.
    7. Yuan, Jinjiang & Soukhal, Ameur & Chen, Youjun & Lu, Lingfa, 2007. "A note on the complexity of flow shop scheduling with transportation constraints," European Journal of Operational Research, Elsevier, vol. 178(3), pages 918-925, May.
    8. Esswein, Carl & Billaut, Jean-Charles & Strusevich, Vitaly A., 2005. "Two-machine shop scheduling: Compromise between flexibility and makespan value," European Journal of Operational Research, Elsevier, vol. 167(3), pages 796-809, December.
    9. Gur Mosheiov & Daniel Oron, 2011. "Batch scheduling on a two‐machine jobshop with machine‐dependent setup times," Naval Research Logistics (NRL), John Wiley & Sons, vol. 58(7), pages 676-684, October.
    10. Drobouchevitch, Inna G. & Sethi, Suresh P. & Sriskandarajah, Chelliah, 2006. "Scheduling dual gripper robotic cell: One-unit cycles," European Journal of Operational Research, Elsevier, vol. 171(2), pages 598-631, June.
    11. Kovalyov, M. Y. & Potts, C. N. & Strusevich, V. A., 2004. "Batching decisions for assembly production systems," European Journal of Operational Research, Elsevier, vol. 157(3), pages 620-642, September.
    12. Chelliah Sriskandarajah & Inna Drobouchevitch & Suresh P. Sethi & Ramaswamy Chandrasekaran, 2004. "Scheduling Multiple Parts in a Robotic Cell Served by a Dual-Gripper Robot," Operations Research, INFORMS, vol. 52(1), pages 65-82, February.
    13. Hichem Kamoun & Nicholas G. Hall & Chelliah Sriskandarajah, 1999. "Scheduling in Robotic Cells: Heuristics and Cell Design," Operations Research, INFORMS, vol. 47(6), pages 821-835, December.
    14. W Zahrouni & H Kamoun, 2011. "Transforming part-sequencing problems in a robotic cell into a GTSP," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 62(1), pages 114-123, January.
    15. Lin, B.M.T. & Cheng, T.C.E. & Chou, A.S.C., 2007. "Scheduling in an assembly-type production chain with batch transfer," Omega, Elsevier, vol. 35(2), pages 143-151, April.
    16. Imai, Akio & Yamakawa, Yukiko & Huang, Kuancheng, 2014. "The strategic berth template problem," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 72(C), pages 77-100.
    17. Gultekin, Hakan & Akturk, M. Selim & Karasan, Oya Ekin, 2006. "Cyclic scheduling of a 2-machine robotic cell with tooling constraints," European Journal of Operational Research, Elsevier, vol. 174(2), pages 777-796, October.
    18. Milind Dawande & Zhichao Feng & Ganesh Janakiraman, 2021. "On the Structure of Bottlenecks in Processes," Management Science, INFORMS, vol. 67(6), pages 3853-3870, June.
    19. Allahverdi, Ali & Ng, C.T. & Cheng, T.C.E. & Kovalyov, Mikhail Y., 2008. "A survey of scheduling problems with setup times or costs," European Journal of Operational Research, Elsevier, vol. 187(3), pages 985-1032, June.
    20. S. Mohammadi & S. Al-E-Hashem & Yacine Rekik, 2020. "An integrated production scheduling and delivery route planning with multi-purpose machines: A case study from a furniture manufacturing company," Post-Print hal-02194222, HAL.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:56:y:2009:i:1:p:1-18. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.