Sequential imperfect preventive maintenance models with two categories of failure modes
Author
Abstract
Suggested Citation
DOI: 10.1002/1520-6750(200103)48:23.0.CO;2-5
Download full text from publisher
References listed on IDEAS
- D. G. Nguyen & D. N. P. Murthy, 1981. "Optimal Preventive Maintenance Policies for Repairable Systems," Operations Research, INFORMS, vol. 29(6), pages 1181-1194, December.
- V. Jayabalan & Dipak Chaudhuri, 1992. "Optimal maintenance and replacement policy for a deteriorating system with increased mean downtime," Naval Research Logistics (NRL), John Wiley & Sons, vol. 39(1), pages 67-78, February.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Radim Briš & Pavel Jahoda, 2022. "Really Ageing Systems Undergoing a Discrete Maintenance Optimization," Mathematics, MDPI, vol. 10(16), pages 1-17, August.
- Zhu, Mixin & Zhou, Xiaojun, 2023. "Hierarchical-clustering-based joint optimization of spare part provision and maintenance scheduling for serial-parallel multi-station manufacturing systems," International Journal of Production Economics, Elsevier, vol. 264(C).
- Chaoqun Duan & Chao Deng & Bingran Wang, 2019. "Multi-phase sequential preventive maintenance scheduling for deteriorating repairable systems," Journal of Intelligent Manufacturing, Springer, vol. 30(4), pages 1779-1793, April.
- Juhyun Lee & Byunghoon Kim & Suneung Ahn, 2019. "Maintenance Optimization for Repairable Deteriorating Systems under Imperfect Preventive Maintenance," Mathematics, MDPI, vol. 7(8), pages 1-17, August.
- Mayank Pandey & Ming J Zuo & Ramin Moghaddass, 2016. "Selective maintenance scheduling over a finite planning horizon," Journal of Risk and Reliability, , vol. 230(2), pages 162-177, April.
- Zu‐Liang Lin & Yeu‐Shiang Huang, 2010. "Nonperiodic preventive maintenance for repairable systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 57(7), pages 615-625, October.
- Ming-Yi You & Guang Meng, 2012. "A modularized framework for predictive maintenance scheduling," Journal of Risk and Reliability, , vol. 226(4), pages 380-391, August.
- Jingyi Zhao & Chunhai Gao & Tao Tang, 2022. "A Review of Sustainable Maintenance Strategies for Single Component and Multicomponent Equipment," Sustainability, MDPI, vol. 14(5), pages 1-22, March.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Kurt, Murat & Kharoufeh, Jeffrey P., 2010. "Optimally maintaining a Markovian deteriorating system with limited imperfect repairs," European Journal of Operational Research, Elsevier, vol. 205(2), pages 368-380, September.
- Andrés Christen, J. & Ruggeri, Fabrizio & Villa, Enrique, 2011. "Utility based maintenance analysis using a Random Sign censoring model," Reliability Engineering and System Safety, Elsevier, vol. 96(3), pages 425-431.
- Juang, Muh-Guey & Anderson, Gary, 2004. "A Bayesian method on adaptive preventive maintenance problem," European Journal of Operational Research, Elsevier, vol. 155(2), pages 455-473, June.
- S El-Ferik & M Ben-Daya, 2008. "Model for imperfect age-based preventive maintenance with age reduction," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 59(12), pages 1644-1651, December.
- Sou-Sen Leu & Tao-Ming Ying, 2020. "Replacement and Maintenance Decision Analysis for Hydraulic Machinery Facilities at Reservoirs under Imperfect Maintenance," Energies, MDPI, vol. 13(10), pages 1-10, May.
- Kirschenmann, Thomas & Popova, Elmira & Damien, Paul & Hanson, Tim, 2014. "Decision dependent stochastic processes," European Journal of Operational Research, Elsevier, vol. 234(3), pages 731-742.
- Aghezzaf, El-Houssaine & Khatab, Abdelhakim & Tam, Phuoc Le, 2016. "Optimizing production and imperfect preventive maintenance planning׳s integration in failure-prone manufacturing systems," Reliability Engineering and System Safety, Elsevier, vol. 145(C), pages 190-198.
- Huang, Yeu-Shiang & Gau, Wei-Yo & Ho, Jyh-Wen, 2015. "Cost analysis of two-dimensional warranty for products with periodic preventive maintenance," Reliability Engineering and System Safety, Elsevier, vol. 134(C), pages 51-58.
- Marais, Karen B. & Saleh, Joseph H., 2009. "Beyond its cost, the value of maintenance: An analytical framework for capturing its net present value," Reliability Engineering and System Safety, Elsevier, vol. 94(2), pages 644-657.
- Zequeira, R.I. & Bérenguer, C., 2006. "Periodic imperfect preventive maintenance with two categories of competing failure modes," Reliability Engineering and System Safety, Elsevier, vol. 91(4), pages 460-468.
- Thiago Lima de Barros & Rodrigo Sampaio Lopes, 2021. "Continuous improvement of imperfect maintenance actions in PAS and PAR models," Journal of Risk and Reliability, , vol. 235(5), pages 941-958, October.
- Wang, Hongzhou, 2002. "A survey of maintenance policies of deteriorating systems," European Journal of Operational Research, Elsevier, vol. 139(3), pages 469-489, June.
- Peyman Mazidi & Miguel A Sanz Bobi & Ebrahim Shayesteh & Patrik Hilber, 2017. "Impact of health indicators on maintenance management and operation of power systems," Journal of Risk and Reliability, , vol. 231(6), pages 716-731, December.
- Xiaofeng Wang & Shu Guo & Jian Shen & Yang Liu, 2020. "Optimization of preventive maintenance for series manufacturing system by differential evolution algorithm," Journal of Intelligent Manufacturing, Springer, vol. 31(3), pages 745-757, March.
- Ciriaco Valdez‐Flores & Richard M. Feldman, 1989. "A survey of preventive maintenance models for stochastically deteriorating single‐unit systems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 36(4), pages 419-446, August.
- Lin, Zu-Liang & Huang, Yeu-Shiang & Fang, Chih-Chiang, 2015. "Non-periodic preventive maintenance with reliability thresholds for complex repairable systems," Reliability Engineering and System Safety, Elsevier, vol. 136(C), pages 145-156.
- Stadje, Wolfgang & Zuckerman, Dror, 1996. "A generalized maintenance model for stochastically deteriorating equipment," European Journal of Operational Research, Elsevier, vol. 89(2), pages 285-301, March.
- El-Ferik, Sami, 2008. "Economic production lot-sizing for an unreliable machine under imperfect age-based maintenance policy," European Journal of Operational Research, Elsevier, vol. 186(1), pages 150-163, April.
- Cha, Ji Hwan, 2016. "New stochastic models for preventive maintenance and maintenance optimizationAuthor-Name: Lee, Hyunju," European Journal of Operational Research, Elsevier, vol. 255(1), pages 80-90.
- G. G. Hegde & Uday S. Karmarkar, 1993. "Engineering costs and customer costs in designing product support," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(3), pages 415-423, April.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:48:y:2001:i:2:p:172-183. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.