Heuristic procedures for scheduling job families with setups and due dates
Author
Abstract
Suggested Citation
DOI: 10.1002/(SICI)1520-6750(199912)46:83.0.CO;2-D
Download full text from publisher
References listed on IDEAS
- Clyde L. Monma & Chris N. Potts, 1989. "On the Complexity of Scheduling with Batch Setup Times," Operations Research, INFORMS, vol. 37(5), pages 798-804, October.
- A. J. Mason & E. J. Anderson, 1991. "Minimizing flow time on a single machine with job classes and setup times," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(3), pages 333-350, June.
- A.M.A. Hariri & C.N. Potts, 1997. "Single machine scheduling with batch set-up times to minimize maximum lateness," Annals of Operations Research, Springer, vol. 70(0), pages 75-92, April.
- J. M. J. Schutten & S. L. van de Velde & W. H. M. Zijm, 1996. "Single-Machine Scheduling with Release Dates, Due Dates and Family Setup Times," Management Science, INFORMS, vol. 42(8), pages 1165-1174, August.
- Schutten, J. M. J. & Leussink, R. A. M., 1996. "Parallel machine scheduling with release dates, due dates and family setup times," International Journal of Production Economics, Elsevier, vol. 46(1), pages 119-125, December.
- Scott Webster & Kenneth R. Baker, 1995. "Scheduling Groups of Jobs on a Single Machine," Operations Research, INFORMS, vol. 43(4), pages 692-703, August.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Potts, Chris N. & Kovalyov, Mikhail Y., 2000. "Scheduling with batching: A review," European Journal of Operational Research, Elsevier, vol. 120(2), pages 228-249, January.
- F Jin & J N D Gupta & S Song & C Wu, 2010. "Single machine scheduling with sequence-dependent family setups to minimize maximum lateness," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(7), pages 1181-1189, July.
- Hinder, Oliver & Mason, Andrew J., 2017. "A novel integer programing formulation for scheduling with family setup times on a single machine to minimize maximum lateness," European Journal of Operational Research, Elsevier, vol. 262(2), pages 411-423.
- Allahverdi, Ali & Gupta, Jatinder N. D. & Aldowaisan, Tariq, 1999. "A review of scheduling research involving setup considerations," Omega, Elsevier, vol. 27(2), pages 219-239, April.
- Carsten Jordan & Andreas Drexl, 1998. "Discrete Lotsizing and Scheduling by Batch Sequencing," Management Science, INFORMS, vol. 44(5), pages 698-713, May.
- Grundel, Soesja & Çiftçi, Barış & Borm, Peter & Hamers, Herbert, 2013.
"Family sequencing and cooperation,"
European Journal of Operational Research, Elsevier, vol. 226(3), pages 414-424.
- Grundel, S. & Ciftci, B.B. & Borm, P.E.M. & Hamers, H.J.M., 2012. "Family Sequencing and Cooperation," Other publications TiSEM 830f760f-f003-40df-a01c-6, Tilburg University, School of Economics and Management.
- Grundel, S. & Ciftci, B.B. & Borm, P.E.M. & Hamers, H.J.M., 2012. "Family Sequencing and Cooperation," Discussion Paper 2012-040, Tilburg University, Center for Economic Research.
- Schaller, Jeffrey, 2007. "Scheduling on a single machine with family setups to minimize total tardiness," International Journal of Production Economics, Elsevier, vol. 105(2), pages 329-344, February.
- Esaignani Selvarajah & George Steiner, 2009. "Approximation Algorithms for the Supplier's Supply Chain Scheduling Problem to Minimize Delivery and Inventory Holding Costs," Operations Research, INFORMS, vol. 57(2), pages 426-438, April.
- Deck, Cary & Sheremeta, Roman M., 2019.
"The tug-of-war in the laboratory,"
European Journal of Political Economy, Elsevier, vol. 60(C).
- Deck, Cary & Sheremeta, Roman, 2015. "Tug-of-War in the Laboratory," MPRA Paper 67521, University Library of Munich, Germany.
- Cary Deck & Roman M. Sheremeta, 2018. "The Tug-of-War in the Laboratory," Working Papers 18-21, Chapman University, Economic Science Institute.
- Cary Deck & Roman M. Sheremeta, 2015. "Tug-of-War in the Laboratory," Working Papers 15-14, Chapman University, Economic Science Institute.
- Selvarajah, Esaignani & Steiner, George, 2006. "Batch scheduling in a two-level supply chain--a focus on the supplier," European Journal of Operational Research, Elsevier, vol. 173(1), pages 226-240, August.
- S Karabatı & C Akkan, 2006. "Minimizing sum of completion times on a single machine with sequence-dependent family setup times," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 57(3), pages 271-280, March.
- Liaee, Mohammad Mehdi & Emmons, Hamilton, 1997. "Scheduling families of jobs with setup times," International Journal of Production Economics, Elsevier, vol. 51(3), pages 165-176, September.
- Luo, Xiaochuan & Chu, Chengbin, 2007. "A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness," European Journal of Operational Research, Elsevier, vol. 180(1), pages 68-81, July.
- Kramer, Arthur & Iori, Manuel & Lacomme, Philippe, 2021. "Mathematical formulations for scheduling jobs on identical parallel machines with family setup times and total weighted completion time minimization," European Journal of Operational Research, Elsevier, vol. 289(3), pages 825-840.
- Hoogeveen, J. A. & van de Velde, S. L., 2001. "Scheduling with target start times," European Journal of Operational Research, Elsevier, vol. 129(1), pages 87-94, February.
- Baker, Kenneth R. & Magazine, Michael J., 2000. "Minimizing maximum lateness with job families," European Journal of Operational Research, Elsevier, vol. 127(1), pages 126-139, November.
- Zhi‐Long Chen & Warren B. Powell, 2003. "Exact algorithms for scheduling multiple families of jobs on parallel machines," Naval Research Logistics (NRL), John Wiley & Sons, vol. 50(7), pages 823-840, October.
- Marc R. Lambrecht & Philip L. Ivens & Nico J. Vandaele, 1998. "ACLIPS: A Capacity and Lead Time Integrated Procedure for Scheduling," Management Science, INFORMS, vol. 44(11-Part-1), pages 1548-1561, November.
- Amin-Naseri, Mohammad Reza & Beheshti-Nia, Mohammad Ali, 2009. "Hybrid flow shop scheduling with parallel batching," International Journal of Production Economics, Elsevier, vol. 117(1), pages 185-196, January.
- Hongyu He & Yanzhi Zhao & Xiaojun Ma & Zheng-Guo Lv & Ji-Bo Wang, 2023. "Branch-and-Bound and Heuristic Algorithms for Group Scheduling with Due-Date Assignment and Resource Allocation," Mathematics, MDPI, vol. 11(23), pages 1-14, November.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:46:y:1999:i:8:p:978-991. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.