Investigation of the poor-quality practices on building construction sites in Malaysia
Author
Abstract
Suggested Citation
DOI: 10.2478/otmcj-2022-0008
Download full text from publisher
References listed on IDEAS
- Olanrewaju Abdul Lateef & Mohd Faris Khamidi & Arazi Idrus, 2011. "Structures of maintenance organisations in Malaysian universities," International Journal of Business Excellence, Inderscience Enterprises Ltd, vol. 4(5), pages 573-594.
- S. L. Tang & Raymond Aoieong & Syed Ahmed, 2004. "The use of Process Cost Model (PCM) for measuring quality costs of construction projects: model testing," Construction Management and Economics, Taylor & Francis Journals, vol. 22(3), pages 263-275.
- John Kelly, 2007. "Making client values explicit in value management workshops," Construction Management and Economics, Taylor & Francis Journals, vol. 25(4), pages 435-442.
- Sanghoon Lee & Sanghyo Lee & Jaejun Kim, 2018. "Evaluating the Impact of Defect Risks in Residential Buildings at the Occupancy Phase," Sustainability, MDPI, vol. 10(12), pages 1-13, November.
- Yehiel Rosenfeld, 2009. "Cost of quality versus cost of non-quality in construction: the crucial balance," Construction Management and Economics, Taylor & Francis Journals, vol. 27(2), pages 107-117.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Ionica Oncioiu & Sorinel Căpuşneanu & Dan Ioan Topor & Ana Maria Ifrim & Ramona Camelia Silvestru & Monica Ioana Toader, 2021. "Improving Business Processes in a Construction Project and Increasing Performance by Using Target Costing," SAGE Open, , vol. 11(1), pages 21582440219, February.
- Alberto Cerezo-Narváez & Andrés Pastor-Fernández & Manuel Otero-Mateo & Pablo Ballesteros-Pérez, 2022. "The Influence of Knowledge on Managing Risk for the Success in Complex Construction Projects: The IPMA Approach," Sustainability, MDPI, vol. 14(15), pages 1-30, August.
- Clara Pereira & Jorge de Brito & José D. Silvestre, 2020. "Harmonised Classification of the Causes of Defects in a Global Inspection System: Proposed Methodology and Analysis of Fieldwork Data," Sustainability, MDPI, vol. 12(14), pages 1-27, July.
- Markus Hoppe & Avner Engel & Shalom Shachar, 2007. "SysTest: Improving the verification, validation, and testing process— Assessing six industrial pilot projects," Systems Engineering, John Wiley & Sons, vol. 10(4), pages 323-347, December.
- Ileana – Sorina Rakos, 2021. "Cost Management Regarding S.C. Adarco Invest S.R.L. Petroșani," Ovidius University Annals, Economic Sciences Series, Ovidius University of Constantza, Faculty of Economic Sciences, vol. 0(2), pages 1110-1119, December.
- Wael Alattyih & Husnain Haider & Halim Boussabaine, 2019. "Development of Value Creation Drivers for Sustainable Design of Green Buildings in Saudi Arabia," Sustainability, MDPI, vol. 11(20), pages 1-33, October.
- Maria Margarida Serra Marques Martins de Moura Saraiva & Flamino José Leal Viola, 2015. "Quality costs and Corporate Taxation. Literature review," CEFAGE-UE Working Papers 2015_13, University of Evora, CEFAGE-UE (Portugal).
- Ooi, Joseph T.L. & Le, Thao T.T. & Lee, Nai-Jia, 2014. "The impact of construction quality on house prices," Journal of Housing Economics, Elsevier, vol. 26(C), pages 126-138.
- Bradley Eeing & Jamie Brown Kruse, 2006. "Valuing self-protection: income and certification effects for safe rooms," Construction Management and Economics, Taylor & Francis Journals, vol. 24(10), pages 1057-1068.
- Shimon Fridkin & Michael Winokur & Amir Gamliel, 2024. "Development of a Quality Deterioration Index for Sustainable Quality Management in High-Tech Electronics Manufacturing," Sustainability, MDPI, vol. 16(15), pages 1-34, August.
- Stelian BRAD, 2010. "A General Approach of Quality Cost Management Suitable for Effective Implementation in Software Systems," Informatica Economica, Academy of Economic Studies - Bucharest, Romania, vol. 14(4), pages 97-113.
- Sungmin Yun & Wooyong Jung, 2017. "Benchmarking Sustainability Practices Use throughout Industrial Construction Project Delivery," Sustainability, MDPI, vol. 9(6), pages 1-20, June.
More about this item
Keywords
rework; contractors; maintenance-span; building performance; site operatives;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:vrs:otamic:v:14:y:2022:i:1:p:2583-2600:n:2. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Peter Golla (email available below). General contact details of provider: https://www.sciendo.com .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.