The Planning and Appraisal of Mega Transport Infrastructure Projects Delivered by Public–Private Partnerships: The Case for the Use of Policy-Led Multi-Criteria Analysis

Author

Listed:
  • Ward John

    (Bartlett School of Planning, University College London, 14 Upper Woburn Place, LondonWC1H 0NN)

  • Dimitriou Harry T

    (Bartlett School of Planning, University College London, 14 Upper Woburn Place, LondonWC1H 0NN)

  • Field Brian G

    (Bartlett School of Planning, University College London, 14 Upper Woburn Place, LondonWC1H 0NN)

  • Dean Marco

    (Bartlett School of Planning, University College London, 14 Upper Woburn Place, LondonWC1H 0NN)

Abstract

Mega transport infrastructure projects are frequently perceived as critical to the “success” of major metropolitan, regional and national development because of their potential to affect significant socioeconomic and territorial changes. However, the mega infrastructure development literature tends to focus upon the frequent failures of such projects because of their inability to meet their original expectations.A major cause for such perceived underperformance has been attributed to the inadequacies of ex-ante project appraisal methodologies. In particular, their excessively narrow focus has prompted growing calls for broader and more transparent project appraisal frameworks. These calls coincide with a period where public private partnerships (PPPs) are growing in importance globally as the favoured procurement route for governments looking to undertake new mega transport infrastructure developments. Some see the practicalities of PPPs as placing them at odds with aspirations for more inclusive and open project appraisal with adequate consideration of the public interest.It is the authors’ contention that if introduced with broader and more systematically presented sustainability concerns, PPPs can remain compatible with such ambitions. Towards this end, this paper presents the rudimentaries of a policy-led multi-criteria analysis (PLMCA) approach to project appraisal as a means by which PLMCA can contribute to more holistic PPP procurement practices. The authors contend in the latter part of the paper that PLMCA addresses many of the limitations associated with the application of narrower decision-making and project appraisal approaches currently supporting PPPs and other more conventional procurement practices.

Suggested Citation

  • Ward John & Dimitriou Harry T & Field Brian G & Dean Marco, 2019. "The Planning and Appraisal of Mega Transport Infrastructure Projects Delivered by Public–Private Partnerships: The Case for the Use of Policy-Led Multi-Criteria Analysis," Organization, Technology and Management in Construction, Sciendo, vol. 11(1), pages 1992-2008, January.
  • Handle: RePEc:vrs:otamic:v:11:y:2019:i:1:p:1992-2008:n:11
    DOI: 10.2478/otmcj-2019-0007
    as

    Download full text from publisher

    File URL: https://doi.org/10.2478/otmcj-2019-0007
    Download Restriction: no

    File URL: https://libkey.io/10.2478/otmcj-2019-0007?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. Flyvbjerg,Bent & Bruzelius,Nils & Rothengatter,Werner, 2003. "Megaprojects and Risk," Cambridge Books, Cambridge University Press, number 9780521009461, October.
    2. Macharis, Cathy & Bernardini, Annalia, 2015. "Reviewing the use of Multi-Criteria Decision Analysis for the evaluation of transport projects: Time for a multi-actor approach," Transport Policy, Elsevier, vol. 37(C), pages 177-186.
    3. Ward, E. John & Dimitriou, Harry T. & Dean, Marco, 2016. "Theory and background of multi-criteria analysis: Toward a policy-led approach to mega transport infrastructure project appraisal," Research in Transportation Economics, Elsevier, vol. 58(C), pages 21-45.
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Dean, M., 2021. "Participatory multi-criteria analysis methods: Comprehensive, inclusive, transparent and user-friendly? An application to the case of the London Gateway Port," Research in Transportation Economics, Elsevier, vol. 88(C).
    2. Dean, M. & Hickman, R. & Chen, C.-L., 2019. "Testing the application of participatory MCA: The case of the South Fylde Line," Transport Policy, Elsevier, vol. 73(C), pages 62-70.
    3. Schreiner, Lena & Madlener, Reinhard, 2022. "Investing in power grid infrastructure as a flexibility option: A DSGE assessment for Germany," Energy Economics, Elsevier, vol. 107(C).
    4. Ahsan Nawaz & Xing Su & Qaiser Mohi Ud Din & Muhammad Irslan Khalid & Muhammad Bilal & Syyed Adnan Raheel Shah, 2020. "Identification of the H&S (Health and Safety Factors) Involved in Infrastructure Projects in Developing Countries-A Sequential Mixed Method Approach of OLMT-Project," IJERPH, MDPI, vol. 17(2), pages 1-18, January.
    5. Cantarelli, C.C. & Flyvbjerg, B. & Buhl, S.L., 2012. "Geographical variation in project cost performance: the Netherlands versus worldwide," Journal of Transport Geography, Elsevier, vol. 24(C), pages 324-331.
    6. Zhao, Na, 2019. "Managing interactive collaborative mega project supply chains under infectious risks," International Journal of Production Economics, Elsevier, vol. 218(C), pages 275-286.
    7. Michael Regan, 2013. "Public project procurement and the case for public–private partnerships," Chapters, in: John Farrar & David G. Mayes (ed.), Globalisation, the Global Financial Crisis and the State, chapter 8, pages 172-196, Edward Elgar Publishing.
    8. Holz-Rau, Christian & Scheiner, Joachim, 2011. "Safety and travel time in cost-benefit analysis: A sensitivity analysis for North Rhine-Westphalia," Transport Policy, Elsevier, vol. 18(2), pages 336-346, March.
    9. Leheis, Stéphanie, 2012. "High-speed train planning in France: Lessons from the Mediterranean TGV-line," Transport Policy, Elsevier, vol. 21(C), pages 37-44.
    10. Morgenroth, Edgar & FitzGerald, John & FitzGerald, John, 2006. "Summary and Conclusions," Book Chapters, in: Morgenroth, Edgar (ed.),Ex-Ante Evaluation of the Investment Priorities for the National Development Plan 2007-2013, chapter 24, pages 317-333, Economic and Social Research Institute (ESRI).
      • Baker, Terence J. & FitzGerald, John & Honohan, Patrick & FitzGerald, John & Honohan, Patrick, 1996. "Summary and Conclusions," Book Chapters, in: Baker, Terence J. (ed.),Economic Implications for Ireland of EMU, chapter 12, pages 339-352, Economic and Social Research Institute (ESRI).
    11. Litsiou, Konstantia & Polychronakis, Yiannis & Karami, Azhdar & Nikolopoulos, Konstantinos, 2022. "Relative performance of judgmental methods for forecasting the success of megaprojects," International Journal of Forecasting, Elsevier, vol. 38(3), pages 1185-1196.
    12. Proost, S. & Van der Loo, S. & de Palma, Andre & Lindsey, Robin, 2005. "A cost-benefit analysis of tunnel investment and tolling alternatives in Antwerp," European Transport \ Trasporti Europei, ISTIEE, Institute for the Study of Transport within the European Economic Integration, issue 31, pages 83-100.
    13. Brand, Christian, 2016. "Beyond ‘Dieselgate’: Implications of unaccounted and future air pollutant emissions and energy use for cars in the United Kingdom," Energy Policy, Elsevier, vol. 97(C), pages 1-12.
    14. Al-Noor Abdullah & Sanzidur Rahman, 2021. "Social Impacts of a Mega-Dam Project as Perceived by Local, Resettled and Displaced Communities: A Case Study of Merowe Dam, Sudan," Economies, MDPI, vol. 9(4), pages 1-32, September.
    15. Fildes, Robert & Goodwin, Paul & Lawrence, Michael & Nikolopoulos, Konstantinos, 2009. "Effective forecasting and judgmental adjustments: an empirical evaluation and strategies for improvement in supply-chain planning," International Journal of Forecasting, Elsevier, vol. 25(1), pages 3-23.
    16. Morteza Davari & Erik Demeulemeester, 2019. "The proactive and reactive resource-constrained project scheduling problem," Journal of Scheduling, Springer, vol. 22(2), pages 211-237, April.
    17. Konstantina Gkritza & Kumares Sinha & Samuel Labi & Fred Mannering, 2008. "Influence of highway construction projects on economic development: an empirical assessment," The Annals of Regional Science, Springer;Western Regional Science Association, vol. 42(3), pages 545-563, September.
    18. Müllner, Jakob, 2016. "From uncertainty to risk—A risk management framework for market entry," Journal of World Business, Elsevier, vol. 51(5), pages 800-814.
    19. Akpan, Uduak & Morimoto, Risako, 2022. "An application of Multi-Attribute Utility Theory (MAUT) to the prioritization of rural roads to improve rural accessibility in Nigeria," Socio-Economic Planning Sciences, Elsevier, vol. 82(PB).
    20. Brinkman, Anthony P., 2003. "The Ethical Challenges and Professional Responses of Travel Demand Forecasters," Institute of Transportation Studies, Research Reports, Working Papers, Proceedings qt9c3330tt, Institute of Transportation Studies, UC Berkeley.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:vrs:otamic:v:11:y:2019:i:1:p:1992-2008:n:11. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Peter Golla (email available below). General contact details of provider: https://www.sciendo.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.