The economic lot-sizing problem with lost sales and bounded inventory
Author
Abstract
Suggested Citation
DOI: 10.1080/0740817X.2012.724187
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Fan, Jie & Wang, Guoqing, 2018. "Joint optimization of dynamic lot and warehouse sizing problems," European Journal of Operational Research, Elsevier, vol. 267(3), pages 849-854.
- Majid Al‐Gwaiz & Xiuli Chao & H. Edwin Romeijn, 2016. "Capacity expansion and cost efficiency improvement in the warehouse problem," Naval Research Logistics (NRL), John Wiley & Sons, vol. 63(5), pages 367-373, August.
- Brahimi, Nadjib & Absi, Nabil & Dauzère-Pérès, Stéphane & Nordli, Atle, 2017. "Single-item dynamic lot-sizing problems: An updated survey," European Journal of Operational Research, Elsevier, vol. 263(3), pages 838-863.
- Ayse Akbalik & Bernard Penz & Christophe Rapine, 2015. "Capacitated lot sizing problems with inventory bounds," Annals of Operations Research, Springer, vol. 229(1), pages 1-18, June.
- Farhat, Mlouka & Akbalik, Ayse & Hadj-Alouane, Atidel B. & Sauer, Nathalie, 2019. "Lot sizing problem with batch ordering under periodic buyback contract and lost sales," International Journal of Production Economics, Elsevier, vol. 208(C), pages 500-511.
- Fan, Jie & Ou, Jinwen, 2023. "On dynamic lot sizing with bounded inventory for a perishable product," Omega, Elsevier, vol. 119(C).
- Zhang, Guoqing & Shang, Xiaoting & Alawneh, Fawzat & Yang, Yiqin & Nishi, Tatsushi, 2021. "Integrated production planning and warehouse storage assignment problem: An IoT assisted case," International Journal of Production Economics, Elsevier, vol. 234(C).
- Jing, Fuying & Chao, Xiangrui, 2021. "A dynamic lot size model with perishable inventory and stockout," Omega, Elsevier, vol. 103(C).
- Aria Shahsavar & Nima Zoraghi & Babak Abbasi, 2018. "Integration of resource investment problem with quantity discount problem in material ordering for minimizing resource costs of projects," Operational Research, Springer, vol. 18(2), pages 315-342, July.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:uiiexx:v:45:y:2013:i:8:p:912-924. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/uiie .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.